P. Internet Protocol (pip) Concluded WG

Group History

Date By Action
1994-02-17 (System) Concluded group
1993-03-03 (System) Changed milestone "Post as an Internet-Draft the modifications to DNS for PIP, the Address assignment in PIP, and the PIP transition strategy.", resolved as "Done"
1992-11-30 (System) Changed milestone "Presentation and review of the PIP specification by the IESG.  If acceptable, the first Working Group meeting will be held.", resolved as "Done"
1992-09-30 (System)
Changed milestone "Post as an Internet-Draft a description of the PIP Packet Format and Forwarding Engine, the PIP Control Message Protocol (PCMP), the PIP Host ...
1992-09-01 (System) Changed milestone "Review and approval of the Charter for the PIP Working Group.", resolved as "Done"
1992-08-31 (System) Started group
1992-08-28 (System) Proposed group