Concluded WG P. Internet Protocol (pip)
Group history
Date | By | Action |
---|---|---|
1994-02-17 | (System) | Concluded group |
1993-03-03 | (System) | Changed milestone "Post as an Internet-Draft the modifications to DNS for PIP, the Address assignment in PIP, and the PIP transition strategy.", resolved as "Done" |
1992-11-30 | (System) | Changed milestone "Presentation and review of the PIP specification by the IESG. If acceptable, the first Working Group meeting will be held.", resolved as "Done" |
1992-09-30 | (System) | Changed milestone "Post as an Internet-Draft a description of the PIP Packet Format and Forwarding Engine, the PIP Control Message Protocol (PCMP), the PIP Host … Changed milestone "Post as an Internet-Draft a description of the PIP Packet Format and Forwarding Engine, the PIP Control Message Protocol (PCMP), the PIP Host Interface Message Protocol, and the PIP MTU Discovery Protocol.", resolved as "Done" |
1992-09-01 | (System) | Changed milestone "Review and approval of the Charter for the PIP Working Group.", resolved as "Done" |
1992-08-31 | (System) | Started group |
1992-08-28 | (System) | Proposed group |