Skip to main content

Routing Over Low power and Lossy networks (roll)

Group history

Date By Action
2024-01-31 Ines Robles
the ROLL (Routing Over Low power and Lossy networks) active document drafts are as follows:

draft-ietf-roll-dao-projection-34 -Root initiated routing state in RPL-: This document enable …
the ROLL (Routing Over Low power and Lossy networks) active document drafts are as follows:

draft-ietf-roll-dao-projection-34 -Root initiated routing state in RPL-: This document enable a RPL Root to install and maintain Projected Routes within its DODAG, along a selected set of nodes that may or may not include itself, for a chosen duration. This was submitted to the IESG

draft-ietf-roll-enrollment-priority-10 - Controlling Secure Network Enrollment in RPL networks-: This document depicts defnes a method by which a potential enrollment proxy can announce itself as available for new Pledges to enroll on a network.

draft-ietf-roll-rnfd-02 - RNFD: Fast border router crash detection in RPL -: This document describes RNFD, an extension to RPL that expedites border router failure detection, even by an order of magnitude, by having nodes collaboratively monitor the status of a given border router.

draft-ietf-roll-aodv-rpl-18 - Supporting Asymmetric Links in Low Power Networks: AODV-RPL -: This document specifies a reactive P2P route discovery mechanism for both hop-by-hop routes and source routing: Ad Hoc On-demand Distance Vector Routing (AODV) based RPL protocol (AODV-RPL). This was submitted to the IESG

Another working topics include:

draft-ietf-roll-mopex - Mode of Operation extension: This document specifies an extended MOP option for future use.

draft-ietf-roll-nsa-extension - Common Ancestor Objective Function and Parent Set DAG Metric Container Extension: This document details how to exchange the necessary information within RPL control packets to let a node better select the different parents that will be used to forward a packet over different paths. This document also describes the Objective Function which takes advantage of this information to implement multi-path routing.

[Last update: 2024-01-31]
2024-01-18 Dominique Barthel Changed milestone "Recharter WG or close", set due date to December 2024 from November 2023
2024-01-18 Dominique Barthel Changed milestone "Initial submission of a proposal to augment DIS flags and options to the IESG", set due date to November 2024 from November 2023
2024-01-18 Dominique Barthel Changed milestone "Initial submission of Capabilities for RPL to the IESG", set due date to June 2024 from June 2023
2024-01-18 Dominique Barthel
Changed milestone "Initial submission of Fast Border Router Crash Detection in RPL to the IESG", set due date to March 2024 from November 2023, added …
Changed milestone "Initial submission of Fast Border Router Crash Detection in RPL to the IESG", set due date to March 2024 from November 2023, added draft-ietf-roll-rnfd to milestone
2024-01-18 Dominique Barthel Changed milestone "Initial submission of Mode of Operation extension for RPL to the IESG", set due date to February 2024 from November 2022
2024-01-18 Dominique Barthel Changed milestone "Initial submission of Controlling Secure Network Enrollment in RPL networks draft to the IESG", set due date to January 2024 from September 2022
2024-01-18 Dominique Barthel Deleted milestone "Initial submission of a proposal for Source-Route Multicast for RPL to the IESG"
2024-01-18 Dominique Barthel Deleted milestone "Initial submission of a YANG model for MPL to the IESG"
2023-10-13 Liz Flynn sent scheduled notification for IETF-118
2023-09-20 Dominique Barthel Changed milestone "Initial submission of a root initiated routing state in RPL to the IESG", resolved as "Done"
2023-04-21 Liz Flynn
2023-03-29 Amy K. Vezza Area Director changed to John Scudder from
2023-03-03 Liz Flynn sent scheduled notification for IETF-116
2022-10-14 Liz Flynn sent scheduled notification for IETF-115
2022-07-01 Liz Flynn sent scheduled notification for IETF-114
2022-05-06 Tina Dang Resources changed to tracker https://trac.ietf.org/trac/roll/report/1 (Issue tracker), wiki https://trac.ietf.org/trac/roll/wiki (Wiki), zulip https://zulip.ietf.org/#streams/164/roll (Zulip Stream) from tracker https://trac.ietf.org/trac/roll/report/1 (Issue tracker), wiki https://trac.ietf.org/trac/roll/wiki (Wiki)
2022-04-01 Alvaro Retana Changed milestone "Initial submission of Fast Border Router Crash Detection in RPL to the IESG", set state to active from review, accepting new milestone
2022-04-01 Alvaro Retana Changed milestone "Initial submission of Capabilities for RPL to the IESG", set state to active from review, accepting new milestone
2022-04-01 Alvaro Retana
Changed milestone "Initial submission of Mode of Operation extension and Capabilities for RPL to the IESG", set description to "Initial submission of Mode of Operation …
Changed milestone "Initial submission of Mode of Operation extension and Capabilities for RPL to the IESG", set description to "Initial submission of Mode of Operation extension for RPL to the IESG"
2022-04-01 Alvaro Retana
Changed milestone "Initial submission of Enabling secure network enrollment in RPL networks draft to the IESG", set description to "Initial submission of Controlling Secure Network …
Changed milestone "Initial submission of Enabling secure network enrollment in RPL networks draft to the IESG", set description to "Initial submission of Controlling Secure Network Enrollment in RPL networks draft to the IESG"
2022-04-01 Dominique Barthel Added milestone "Initial submission of Fast Border Router Crash Detection in RPL to the IESG" for review, due November 2023
2022-04-01 Dominique Barthel Changed milestone "Recharter WG or close", set due date to November 2023 from October 2021
2022-04-01 Dominique Barthel Changed milestone "Initial submission of a YANG model for MPL to the IESG", set due date to November 2023 from July 2020
2022-04-01 Dominique Barthel Changed milestone "Initial submission of a proposal to augment DIS flags and options to the IESG", set due date to November 2023 from June 2020
2022-04-01 Dominique Barthel Changed milestone "Initial submission of a proposal for Source-Route Multicast for RPL to the IESG", set due date to November 2023 from June 2020
2022-04-01 Dominique Barthel Added milestone "Initial submission of Capabilities for RPL to the IESG" for review, due June 2023
2022-04-01 Dominique Barthel
Changed milestone "Initial submission of Mode of Operation extension and Capabilities for RPL to the IESG", set due date to November 2022 from December 2020, …
Changed milestone "Initial submission of Mode of Operation extension and Capabilities for RPL to the IESG", set due date to November 2022 from December 2020, added draft-ietf-roll-mopex to milestone, removed draft-ietf-roll-mopex-cap from milestone
2022-04-01 Dominique Barthel Changed milestone "Initial submission of Enabling secure network enrollment in RPL networks draft to the IESG", set due date to September 2022 from June 2020
2022-04-01 Dominique Barthel Changed milestone "Initial submission of a root initiated routing state in RPL to the IESG", set due date to May 2022 from July 2020
2022-03-16 Alvaro Retana Delegate changed to Michael Richardson from Robert Cragie, Yvonne-Anne Pignolet
2022-02-25 Liz Flynn sent scheduled notification for IETF-113
2021-10-15 Liz Flynn sent scheduled notification for IETF-112
2021-08-27 Ines Robles Changed milestone "Initial submission of Common Ancestor Objective Functions and Parent Set DAG Metric Container Extension to the IESG", resolved as "Done"
2021-03-19 Alvaro Retana Liaison Contact changed to Dominique Barthel, Ines Robles from Ines Robles, Michael Richardson
2021-02-12 Liz Flynn sent scheduled notification for IETF-110
2020-11-15 Ines Robles Changed milestone "Initial Submission of a proposal with uses cases for RPI, RH3 and IPv6-in-IPv6 encapsulation to the IESG", resolved as "Done"
2020-10-23 Liz Flynn sent scheduled notification for IETF-109
2020-09-29 Ines Robles Changed milestone "Recharter WG or close", set due date to October 2021 from October 2020
2020-06-24 Ines Robles Changed milestone "Initial submission of a reactive P2P route discovery mechanism based on AODV-RPL protocol to the  IESG", resolved as "Done"
2020-04-28 Ines Robles Changed milestone "Initial submission of routing for RPL Leaves draft to the IESG", resolved as "Done"
2020-04-22 Ines Robles Changed milestone "Initial submission to the IESG of mechanism to turn on RFC8138 compression feature within a RPL network", resolved as "Done"
2020-02-28 Liz Flynn sent scheduled notification for IETF-107
2020-01-22 Alvaro Retana
Changed milestone "Initial submission to the IESG of mechanism to turn on RFC8138 compression feature within a RPL network", set state to active from review, …
Changed milestone "Initial submission to the IESG of mechanism to turn on RFC8138 compression feature within a RPL network", set state to active from review, accepting new milestone
2020-01-22 Dominique Barthel Changed milestone "Initial submission of a root initiated routing state in RPL to the IESG", set due date to July 2020 from December 2019
2020-01-22 Dominique Barthel Added milestone "Initial submission to the IESG of mechanism to turn on RFC8138 compression feature within a RPL network" for review, due March 2020
2020-01-22 Dominique Barthel Changed milestone "Initial submission of routing for RPL Leaves draft to the IESG", set due date to March 2020 from December 2019
2020-01-22 Dominique Barthel
Changed milestone "Initial Submission of a proposal with uses cases for RPI, RH3 and IPv6-in-IPv6 encapsulation to the IESG", set due date to March 2020 …
Changed milestone "Initial Submission of a proposal with uses cases for RPI, RH3 and IPv6-in-IPv6 encapsulation to the IESG", set due date to March 2020 from December 2019
2020-01-22 Dominique Barthel Changed milestone "Initial submission of a solution to the problems due to the use of No-Path DAO Messages to the IESG", resolved as "Done"
2019-11-27 Peter Van der Stok Chairs changed to Dominique Barthel, Ines Robles from Dominique Barthel, Ines Robles, Peter Van der Stok
2019-11-08 Dominique Barthel
ROLL focuses on IPv6 routing for Low Power and Lossy Networks (LLN). It maintains and improves the protocols already developed, including RPL and MPL.

In …
ROLL focuses on IPv6 routing for Low Power and Lossy Networks (LLN). It maintains and improves the protocols already developed, including RPL and MPL.

In draft-ietf-roll-rpl-observations, we describe RPL protocol design issues, their consequences and some implementation choices, with the goal of producing new documents that solve those issues.

One such limitation is the exhaustion of the Mode of Operation field (MOP) of RPL. draft-ietf-roll-mopex-cap aims at extending the MOP field and adding the notion of Capabilities to RPL networks.

Another improvement being worked on is an efficient route invalidation messaging scheme for RPL. draft-ietf-roll-efficient-npdao, currently in IESG processing, describes such ​a proposal.

Additionally, we are working on a proposal allowing a RPL Root to install and maintain Projected routes within the RPL Domain (see draft-ietf-roll-dao-projection), and a proposal to extend secure network enrollment (BRSKI) to RPL networks (see draft-ietf-roll-enrollment-priority).

Another area of improvement is the routing for RPL-unaware nodes through a RPL domain. Proposals can be found in draft-ietf-roll-unaware-leaves.

The WG is also putting the last touch on draft-ietf-roll-nsa-extension, that describes a new routing objective function for RPL, based on a metric that represents the node’s remaining traffic capacity.

New work includes a proposal for reliably eliding RPL control information and querying that information, (see draft-thubert-roll-eliding-dio-information) and a proposal to signal that RFC8138 compression is turned on (see draft-thubert-roll-turnon-rfc8138).

Finally, also in IESG processing, draft-ietf-roll-useofrplinfo describes use cases for RPL data plane features, notably the need for IP-in-IP incapsulation, in the various Modes Of Operation and for the various traffics that are carried across a RPL domain.

[Last Updated: Nov 08, 2019.]
2019-11-06 Alvaro Retana Changed milestone "Initial submission of Mode of Operation extension and Capabilities for RPL to the IESG", set state to active from review, accepting new milestone
2019-11-06 Alvaro Retana Changed milestone "Initial submission of Enabling secure network enrollment in RPL networks draft to the IESG", set state to active from review, accepting new milestone
2019-11-06 Alvaro Retana
Changed milestone "Initial submission of a proposal to augment DIS flags and options to the IESG ", set description to "Initial submission of a proposal …
Changed milestone "Initial submission of a proposal to augment DIS flags and options to the IESG ", set description to "Initial submission of a proposal to augment DIS flags and options to the IESG"
2019-11-06 Alvaro Retana
Changed milestone "Initial submission of Common Ancestor Objective Functions and Parent Set DAG Metric Container Extension to the IESG", set state to active from review, …
Changed milestone "Initial submission of Common Ancestor Objective Functions and Parent Set DAG Metric Container Extension to the IESG", set state to active from review, accepting new milestone
2019-11-06 Alvaro Retana Changed milestone "Initial submission of routing for RPL Leaves draft to the IESG", set state to active from review, accepting new milestone
2019-11-06 Alvaro Retana
Changed milestone "Initial submission of a solution to the problems due to the use of No-Path DAO Messages to the IESG ", set description to …
Changed milestone "Initial submission of a solution to the problems due to the use of No-Path DAO Messages to the IESG ", set description to "Initial submission of a solution to the problems due to the use of No-Path DAO Messages to the IESG"
2019-11-06 Ines Robles Added milestone "Initial submission of Mode of Operation extension and Capabilities for RPL to the IESG" for review, due December 2020
2019-11-06 Ines Robles Changed milestone "Recharter WG or close", set due date to October 2020 from September 2019
2019-11-06 Ines Robles
Changed milestone "Initial submission of a YANG model for MPL to the IESG", set due date to July 2020 from March 2019, added draft-ietf-roll-mpl-yang to …
Changed milestone "Initial submission of a YANG model for MPL to the IESG", set due date to July 2020 from March 2019, added draft-ietf-roll-mpl-yang to milestone
2019-11-06 Ines Robles Added milestone "Initial submission of Enabling secure network enrollment in RPL networks draft to the IESG" for review, due June 2020
2019-11-06 Ines Robles
Changed milestone "Initial submission of a proposal for Source-Route Multicast for RPL to the IESG", set due date to June 2020 from January 2019, added …
Changed milestone "Initial submission of a proposal for Source-Route Multicast for RPL to the IESG", set due date to June 2020 from January 2019, added draft-ietf-roll-ccast to milestone
2019-11-06 Ines Robles
Changed milestone "Initial submission of a proposal to augment DIS flags and options to the IESG ", set due date to June 2020 from December …
Changed milestone "Initial submission of a proposal to augment DIS flags and options to the IESG ", set due date to June 2020 from December 2018, added draft-ietf-roll-dis-modifications to milestone
2019-11-06 Ines Robles Added milestone "Initial submission of Common Ancestor Objective Functions and Parent Set DAG Metric Container Extension to the IESG" for review, due March 2020
2019-11-06 Ines Robles
Changed milestone "Initial submission of a reactive P2P route discovery mechanism based on AODV-RPL protocol to the  IESG", set due date to March 2020 from …
Changed milestone "Initial submission of a reactive P2P route discovery mechanism based on AODV-RPL protocol to the  IESG", set due date to March 2020 from July 2018, added draft-ietf-roll-aodv-rpl to milestone
2019-11-06 Ines Robles Added milestone "Initial submission of routing for RPL Leaves draft to the IESG" for review, due December 2019
2019-11-06 Ines Robles
Changed milestone "Initial submission of a root initiated routing state in RPL to the IESG", set due date to December 2019 from August 2018, added …
Changed milestone "Initial submission of a root initiated routing state in RPL to the IESG", set due date to December 2019 from August 2018, added draft-ietf-roll-dao-projection to milestone
2019-11-06 Ines Robles
Changed milestone "Initial Submission of a proposal with uses cases for RPI, RH3 and IPv6-in-IPv6 encapsulation to the IESG", set due date to December 2019 …
Changed milestone "Initial Submission of a proposal with uses cases for RPI, RH3 and IPv6-in-IPv6 encapsulation to the IESG", set due date to December 2019 from April 2018, added draft-ietf-roll-useofrplinfo to milestone
2019-11-06 Ines Robles
Changed milestone "Initial submission of a solution to the problems due to the use of No-Path DAO Messages to the IESG ", set due date …
Changed milestone "Initial submission of a solution to the problems due to the use of No-Path DAO Messages to the IESG ", set due date to November 2019 from July 2018, added draft-ietf-roll-efficient-npdao to milestone
2019-11-06 Ines Robles Deleted milestone "Initial submission of a Forwarder Selection Protocol for MPL to the IESG"
2019-10-29 Alvaro Retana Chairs changed to Dominique Barthel, Ines Robles, Peter Van der Stok from Ines Robles, Peter Van der Stok
2019-10-25 Liz Flynn sent scheduled notification for IETF-106
2019-06-28 Liz Flynn sent scheduled notification for IETF-105
2019-03-22 Ines Robles
ROLL focuses on routing issues for Low Power and Lossy Networks (LLN) and maintaining the protocols already developed, including RPL and MPL. The focus is …
ROLL focuses on routing issues for Low Power and Lossy Networks (LLN) and maintaining the protocols already developed, including RPL and MPL. The focus is on IPv6 work only.

The WG  accepted a proposal that describes RPL protocol design issues, consequences and implementation choices, with the goal of producing new documents that solve those problems.  One document from the result is draft-rahul-roll-mop-ext.

The WG finalized the work that solves the issues of the mechanisms used for a route invalidation system. The WG is in the final stage to approve a proposal that uses a reactive P2P    route discovery mechanism for both hop-by-hop routing and source  routing: Ad Hoc On-demand Distance Vector Routing (AODV) based RPL  protocol,  when some of the links between source and target node are  asymmetric.

Additionally, in the WG a new proposal is presented to select the appropriate  parents to achieve ultra-low latency and jitter. Another proposal describes an objective function based on a metric that represents the amount of remaining traffic handling capacity that the node has. In The WG also, we have a proposal that describes the unicast routing  service in a RPL domain to 6LoWPAN ND nodes that are not RPL  protocol aware.

RPL performance is presented focusing in asymmetric links, such as deaf nodes.

[Last Updated: March 22, 2018.]
2019-03-01 Liz Flynn sent scheduled notification for IETF-104
2018-11-03 Ines Robles
ROLL focuses on routing issues for Low Power and Lossy Networks (LLN) and maintaining the protocols already developed, including RPL and MPL. The focus is …
ROLL focuses on routing issues for Low Power and Lossy Networks (LLN) and maintaining the protocols already developed, including RPL and MPL. The focus is on IPv6 work only.

The WG recently accepted a proposal that describes RPL protocol design issues, consequences and implementation choices, with the goal of producing new documents that solve those problems. The WG finalized the work that solves the issues of the mechanisms used for a route invalidation system. The WG is in the final stage to approve a proposal that uses a reactive P2P    route discovery mechanism for both hop-by-hop routing and source  routing: Ad Hoc On-demand Distance Vector Routing (AODV) based RPL  protocol,  when some of the links between source and target node are  asymmetric.

Additionally, in the WG a proposal is presented to select the appropriate  parents to achieve ultra-low latency and jitter. Another proposal describes an objective function based on a metric that represents the amount of remaining traffic handling capacity that the node has. In The WG also, we have a proposal that describes the unicast routing  service in a RPL domain to 6LoWPAN ND nodes that are not RPL  protocol aware.

[Last Updated: November 4, 2018.]
2018-10-19 Liz Flynn sent scheduled notification for IETF-103
2018-07-03 Liz Flynn sent scheduled notification for IETF-102
2018-03-21 Ines Robles Changed milestone "Recharter WG or close", set due date to September 2019 from September 2018
2018-03-21 Ines Robles Changed milestone "Initial submission of a Forwarder Selection Protocol for MPL to the IESG", set due date to July 2019 from July 2017
2018-03-21 Ines Robles Changed milestone "Initial submission of a YANG model for MPL to the IESG", set due date to March 2019 from March 2017
2018-03-21 Ines Robles Changed milestone "Initial submission of a proposal for Source-Route Multicast for RPL to the IESG", set due date to January 2019 from July 2017
2018-03-21 Ines Robles
Changed milestone "Initial submission of a proposal to augment DIS flags and options to the IESG ", set due date to December 2018 from November …
Changed milestone "Initial submission of a proposal to augment DIS flags and options to the IESG ", set due date to December 2018 from November 2017
2018-03-21 Ines Robles Changed milestone "Initial submission of a root initiated routing state in RPL to the IESG", set due date to August 2018 from March 2017
2018-03-21 Ines Robles
Changed milestone "Initial submission of a reactive P2P route discovery mechanism based on AODV-RPL protocol to the  IESG", set due date to July 2018 from …
Changed milestone "Initial submission of a reactive P2P route discovery mechanism based on AODV-RPL protocol to the  IESG", set due date to July 2018 from November 2017
2018-03-21 Ines Robles
Changed milestone "Initial Submission of a proposal with uses cases for RPI, RH3 and IPv6-in-IPv6 encapsulation to the IESG", set due date to April 2018 …
Changed milestone "Initial Submission of a proposal with uses cases for RPI, RH3 and IPv6-in-IPv6 encapsulation to the IESG", set due date to April 2018 from January 2017
2018-02-27 Liz Flynn sent scheduled notification for IETF-101
2017-10-20 Stephanie McCammon sent scheduled notification for IETF-100
2017-06-23 Stephanie McCammon sent scheduled notification for IETF-99
2017-03-03 Stephanie McCammon sent scheduled notification for IETF-98
2016-12-16 Cindy Morgan
Deleted milestone "Submit draft about how to compress RFC6553, RFC6554, and IP headers in the 6LoWPAN adaptation layer context to the IESG.", not …
Deleted milestone "Submit draft about how to compress RFC6553, RFC6554, and IP headers in the 6LoWPAN adaptation layer context to the IESG.", not present in approved charter
2016-12-16 Cindy Morgan Deleted milestone "Submit draft about when to use RFC6553, RFC6554, and IPv6-in-IPv6 encapsulation to the IESG.", not present in approved charter
2016-12-16 Cindy Morgan Deleted milestone "Evaluate WG progress, recharter or close", not present in approved charter
2016-12-16 Cindy Morgan Added milestone "Recharter WG or close", due 2018-09-30, from approved charter
2016-12-16 Cindy Morgan
Added milestone "Initial submission of a solution to the problems due to the use of No-Path DAO Messages to the IESG ", due 2018-07-31, from …
Added milestone "Initial submission of a solution to the problems due to the use of No-Path DAO Messages to the IESG ", due 2018-07-31, from approved charter
2016-12-16 Cindy Morgan Added milestone "Initial submission of a proposal to augment DIS flags and options to the IESG ", due 2017-11-30, from approved charter
2016-12-16 Cindy Morgan Added milestone "Initial submission of a reactive P2P route discovery mechanism based on AODV-RPL protocol to the  IESG", due 2017-11-30, from approved charter
2016-12-16 Cindy Morgan Added milestone "Initial submission of a Forwarder Selection Protocol for MPL to the IESG", due 2017-07-31, from approved charter
2016-12-16 Cindy Morgan Added milestone "Initial submission of a proposal for Source-Route Multicast for RPL to the IESG", due 2017-07-31, from approved charter
2016-12-16 Cindy Morgan Added milestone "Initial submission of a root initiated routing state in RPL to the IESG", due 2017-03-31, from approved charter
2016-12-16 Cindy Morgan Added milestone "Initial submission of a YANG model for MPL to the IESG", due 2017-03-31, from approved charter
2016-12-16 Cindy Morgan Added milestone "Initial Submission of a proposal with uses cases for RPI, RH3 and IPv6-in-IPv6 encapsulation to the IESG", due 2017-01-31, from approved charter
2016-10-21 Stephanie McCammon sent scheduled notification for IETF-97
2016-06-24 Stephanie McCammon sent scheduled notification for IETF-96
2016-04-06 Peter Van der Stok Tech Advisors changed to from Rene Struik
2016-03-11 Stephanie McCammon sent scheduled notification for IETF-95
2016-03-08 Cindy Morgan Secretaries changed to Michael Richardson from
2016-03-08 Cindy Morgan Chairs changed to Peter Van der Stok, Ines Robles from Ines Robles, Michael Richardson
2015-12-11 Michael Richardson
Changed milestone "Submit draft about how to compress RFC6553, RFC6554, and IP headers in the 6LoWPAN adaptation layer context to the IESG.", set …
Changed milestone "Submit draft about how to compress RFC6553, RFC6554, and IP headers in the 6LoWPAN adaptation layer context to the IESG.", set due date to May 2016 from November 2015, added draft-ietf-6lo-routing-dispatch to milestone
2015-12-11 Michael Richardson
Changed milestone "Submit draft about when to use RFC6553, RFC6554, and IPv6-in-IPv6 encapsulation to the IESG.", set due date to April 2016 from …
Changed milestone "Submit draft about when to use RFC6553, RFC6554, and IPv6-in-IPv6 encapsulation to the IESG.", set due date to April 2016 from August 2015, added draft-robles-roll-useofrplinfo to milestone
2015-12-11 Michael Richardson Changed milestone "Evaluate WG progress, recharter or close", set due date to January 2016 from November 2015
2015-10-09 Stephanie McCammon sent scheduled notification for IETF-94
2015-06-26 Stephanie McCammon sent scheduled notification for IETF-93
2015-06-15 Cindy Morgan Mailing list archive changed to https://mailarchive.ietf.org/arch/browse/roll/ from http://www.ietf.org/mail-archive/web/roll/
2015-04-24 Cindy Morgan Deleted milestone "WG to joint-LC using flow-label for RPL with 6man", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "Evaluate WG progress, recharter or close", not present in approved charter
2015-04-24 Cindy Morgan
Deleted milestone "Submit first draft of RPL applicability statement for Home Automation applications to the IESG to be considered as an Informational RFC", not present …
Deleted milestone "Submit first draft of RPL applicability statement for Home Automation applications to the IESG to be considered as an Informational RFC", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "submit REVISED thread-analysis document based upon security directorate review to IESG.", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "Resolve question of whether to keep this in roll or 6tisch", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "WG to adopt reviewed template for applicability statements", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "WG to adopt RPL applicability statement(s) for AMI networks", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "WG to adopt RPL applicability statement Home for Automation applications", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "WG to adopt RPL applicability statement for Industrial applications", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "Submit first draft of RPL threat analysis to the IESG to be considered as an Informational RFC", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "Submit the ROLL routing protocol specification to the IESG as Proposed Standard.", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "Submit first draft of ROLL routing protocol specification as Proposed Standard.", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "Submit Routing metrics for LLNs document to the IESG to be considered as a Proposed Standard.", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "Submit Security Framework to the IESG to be considered as an Informational RFC", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "Submit Routing requirements for Urban networks applications to the IESG to be considered as an Informational RFC.", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "Submit Routing requirements for Building applications to the  IESG to be considered as an Informational RFC.", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "Submit Routing requirements for Connected Home networks applications to the IESG to be considered as an Informational RFC.", not present in approved charter
2015-04-24 Cindy Morgan Deleted milestone "Submit Routing requirements for Industrial applications to the IESG to be considered as an Informational RFC.", not present in approved charter
2015-04-24 Cindy Morgan Added milestone "Evaluate WG progress, recharter or close", due 2015-11-30, from approved charter
2015-04-24 Cindy Morgan
Added milestone "Submit draft about how to compress RFC6553, RFC6554, and IP headers in the 6LoWPAN adaptation layer context to the IESG.", due …
Added milestone "Submit draft about how to compress RFC6553, RFC6554, and IP headers in the 6LoWPAN adaptation layer context to the IESG.", due 2015-11-30, from approved charter
2015-04-24 Cindy Morgan Added milestone "Submit draft about when to use RFC6553, RFC6554, and IPv6-in-IPv6 encapsulation to the IESG.", due 2015-08-31, from approved charter
2015-03-25 Amy K. Vezza Shepherding AD changed to Alvaro Retana from
2014-07-23 Adrian Farrel Changed milestone "WG to joint-LC using flow-label for RPL with 6man", set state to active from review, accepting new milestone
2014-07-23 Michael Richardson Changed milestone "Evaluate WG progress, recharter or close", resolved as "Done"
2014-07-23 Michael Richardson Added milestone "WG to joint-LC using flow-label for RPL with 6man" for review, due August 2014
2014-07-23 Michael Richardson Changed milestone "submit REVISED thread-analysis document based upon security directorate review to IESG.", resolved as "Done"
2014-07-01 Stephanie McCammon sent scheduled notification for IETF-90
2014-06-23 Stephanie McCammon sent scheduled notification for IETF-90
2014-03-20 Ines Robles Changed milestone "Resolve question of whether to keep this in roll or 6tisch", resolved as "Done"
2014-01-24 Amy K. Vezza Delegates changed to Robert Cragie, Yvonne-Anne Pignolet from Daniel King, Ines Robles
2013-12-13 Adrian Farrel Changed milestone "WG to adopt reviewed template for applicability statements", set state to active from review, accepting new milestone
2013-12-13 Michael Richardson Added milestone "WG to adopt reviewed template for applicability statements" for review, due January 2013
2013-12-05 Cindy Morgan Secretaries changed to from Ines Robles
2013-12-05 Cindy Morgan Chairs changed to Ines Robles, Michael Richardson from Michael Richardson, JP Vasseur
2013-11-29 Michael Richardson Deleted milestone "WG to adopt reviewed template for applicability statements"
2013-11-29 Adrian Farrel Changed milestone "submit REVISED thread-analysis document based upon security directorate review to IESG.", set state to active from review, accepting new milestone
2013-11-29 Adrian Farrel Changed milestone "Resolve question of whether to keep this in roll or 6tisch", set state to active from review, accepting new milestone
2013-11-29 Michael Richardson Added milestone "submit REVISED thread-analysis document based upon security directorate review to IESG." for review, due January 2014
2013-11-29 Michael Richardson Changed milestone "Evaluate WG progress, recharter or close", set due date to June 2014 from June 2013
2013-11-29 Michael Richardson
Changed milestone "Submit first draft of RPL applicability statement for Home Automation applications to the IESG to be considered as an Informational RFC", set due …
Changed milestone "Submit first draft of RPL applicability statement for Home Automation applications to the IESG to be considered as an Informational RFC", set due date to February 2014 from February 2013
2013-11-29 Michael Richardson Deleted milestone "Submit first draft of RPL applicability statement for Building Automation applications to the IESG to be considered as an Informational RFC"
2013-11-29 Michael Richardson Added milestone "Resolve question of whether to keep this in roll or 6tisch" for review, due January 2014
2013-11-29 Michael Richardson Deleted milestone "Submit RPL applicability statement for Home Automation applications to the IESG to be considered as an Informational RFC"
2013-11-29 Michael Richardson Deleted milestone "Submit first draft of RPL applicability statement for Industrial applications to the IESG to be considered as an Informational RFC"
2013-11-29 Michael Richardson Deleted milestone "WG to adopt RPL applicability statement Building Automation applications "
2013-11-29 Michael Richardson Changed milestone "WG to adopt RPL applicability statement(s) for AMI networks", resolved as "Done", added draft-ietf-roll-applicability-ami to milestone
2013-11-29 Michael Richardson Changed milestone "WG to adopt RPL applicability statement Home for Automation applications", resolved as "Done", added draft-ietf-roll-applicability-home-building to milestone
2013-11-29 Michael Richardson Changed milestone "WG to adopt RPL applicability statement for Industrial applications", resolved as "Done", added draft-ietf-roll-rpl-industrial-applicability to milestone
2013-11-29 Michael Richardson Changed milestone "Submit first draft of RPL threat analysis to the IESG to be considered as an Informational RFC", resolved as "Done"
2013-10-03 Cindy Morgan Secretaries changed to Ines Robles from Daniel King
2010-12-10 (System) Changed milestone "Submit Security Framework to the IESG to be considered as an Informational RFC", resolved as "Done"
2010-11-08 (System) Changed milestone "Submit Routing metrics for LLNs document to the IESG to be considered as a Proposed Standard.", resolved as "Done"
2010-08-23 (System) Changed milestone "Submit the ROLL routing protocol specification to the IESG as Proposed Standard.", resolved as "Done"
2010-08-23 (System) Changed milestone "Submit first draft of ROLL routing protocol specification as Proposed Standard.", resolved as "Done"
2009-02-04 (System) Changed milestone "Submit Routing requirements for Building applications to the  IESG to be considered as an Informational RFC.", resolved as "Done"
2009-01-23 (System) Changed milestone "Submit Routing requirements for Industrial applications to the IESG to be considered as an Informational RFC.", resolved as "Done"
2008-11-19 (System) Changed milestone "Submit Routing requirements for Connected Home networks applications to the IESG to be considered as an Informational RFC.", resolved as "Done"
2008-11-07 (System) Changed milestone "Submit Routing requirements for Urban networks applications to the IESG to be considered as an Informational RFC.", resolved as "Done"
2008-02-11 (System) Started group
2007-12-26 (System) Proposed group