Concluded WG Transparent Interconnection of Lots of Links (trill)
Group history
Date | By | Action |
---|---|---|
2018-03-19 | Cindy Morgan | State changed to Concluded from Active |
2018-03-19 | Alia Atlas | Requested closing group |
2018-02-27 | Liz Flynn | sent scheduled notification for IETF-101 |
2017-10-20 | Stephanie McCammon | sent scheduled notification for IETF-100 |
2017-06-23 | Stephanie McCammon | sent scheduled notification for IETF-99 |
2017-03-03 | Stephanie McCammon | sent scheduled notification for IETF-98 |
2016-12-12 | Alia Atlas | Changed milestone "Submit Directory Assistance Mechanisms to IESG for Proposed Standard", set state to active from review, accepting new milestone |
2016-10-21 | Stephanie McCammon | sent scheduled notification for IETF-97 |
2016-06-24 | Stephanie McCammon | sent scheduled notification for IETF-96 |
2016-03-11 | Stephanie McCammon | sent scheduled notification for IETF-95 |
2015-12-10 | Susan Hares | Changed milestone "Re-charter or shut down the WG", set due date to July 2017 from August 2016 |
2015-12-10 | Susan Hares | Changed milestone " Submit RBridge support of Data Center Bridging to IESG for publication as Proposed Standard (draft-eastlake-trill-rbridge-dcb)", set due date to November … Changed milestone " Submit RBridge support of Data Center Bridging to IESG for publication as Proposed Standard (draft-eastlake-trill-rbridge-dcb)", set due date to November 2016 from December 2015 |
2015-12-10 | Susan Hares | Changed milestone "Initial WG draft on TRILL IS-IS Security", set due date to May 2016 from June 2015 |
2015-12-10 | Susan Hares | Changed milestone "Submit Multi-topology TRILL to IESG for Proposed Standard", set due date to March 2016 from August 2015 |
2015-12-10 | Susan Hares | Changed milestone "Submit Multi-level TRILL to IESG for Proposed Standard", set due date to February 2016 from May 2015 |
2015-12-10 | Susan Hares | Changed milestone " Submit TRILL ARP/ND optimizations to IESG for publication as Proposed Standard", set due date to January 2016 from April 2015 |
2015-12-10 | Susan Hares | Added milestone "Submit Directory Assistance Mechanisms to IESG for Proposed Standard" for review, due December 2015 |
2015-12-10 | Susan Hares | Changed milestone "Submit TRILL-over-IP to IESG for Proposed Standard", set due date to December 2015 from December 2014 |
2015-12-10 | Susan Hares | Deleted milestone "Initial WG draft on TRILL Implementation Report" |
2015-12-10 | Susan Hares | Changed milestone "Initial WG draft on ARP/ND optimizations", resolved as "Done" |
2015-10-09 | Stephanie McCammon | sent scheduled notification for IETF-94 |
2015-06-26 | Stephanie McCammon | sent scheduled notification for IETF-93 |
2015-06-15 | Cindy Morgan | Mailing list archive changed to https://mailarchive.ietf.org/arch/browse/trill/ from http://www.ietf.org/mail-archive/web/trill/current/maillist.html |
2015-03-25 | Amy K. Vezza | IETF Area changed to Routing Area from Internet Area |
2015-03-25 | Amy K. Vezza | Shepherding AD changed to Alia Atlas from |
2015-02-27 | Stephanie McCammon | sent scheduled notification for IETF-92 |
2014-12-23 | Susan Hares | Changed milestone " Submit RBridge support of Data Center Bridging to IESG for publication as Proposed Standard (draft-eastlake-trill-rbridge-dcb)", set due date to December … Changed milestone " Submit RBridge support of Data Center Bridging to IESG for publication as Proposed Standard (draft-eastlake-trill-rbridge-dcb)", set due date to December 2015 from March 2015 |
2014-12-23 | Susan Hares | Changed milestone " Submit TRILL ARP/ND optimizations to IESG for publication as Proposed Standard", set due date to April 2015 from April 2014 |
2014-12-22 | Susan Hares | Changed milestone "Re-charter or shut down the WG", set due date to August 2016 from December 2015 |
2014-12-22 | Susan Hares | Changed milestone "Submit Multi-topology TRILL to IESG for Proposed Standard", set due date to August 2015 from August 2014 |
2014-12-22 | Susan Hares | Changed milestone "Initial WG draft on TRILL IS-IS Security", set due date to June 2015 from November 2014 |
2014-12-22 | Susan Hares | Changed milestone "Submit Multi-level TRILL to IESG for Proposed Standard", set due date to May 2015 from July 2014 |
2014-12-22 | Susan Hares | Changed milestone "Initial WG draft on TRILL Implementation Report", set due date to April 2015 from March 2014 |
2014-12-22 | Susan Hares | Changed milestone "Initial WG draft on ARP/ND optimizations", set due date to January 2015 from December 2013 |
2014-12-22 | Susan Hares | Changed milestone "Submit TRILL-over-IP to IESG for Proposed Standard", set due date to December 2014 from June 2014, added draft-ietf-trill-over-ip to milestone |
2014-12-22 | Susan Hares | Changed milestone "Submit Active-Active to IESG for Proposed Standard", set due date to December 2014 from April 2014, added draft-ietf-trill-centralized-replication, draft-ietf-trill-aa-multi-attach, draft-ietf-trill-pseudonode-nickname, … Changed milestone "Submit Active-Active to IESG for Proposed Standard", set due date to December 2014 from April 2014, added draft-ietf-trill-centralized-replication, draft-ietf-trill-aa-multi-attach, draft-ietf-trill-pseudonode-nickname, draft-ietf-trill-cmt to milestone |
2014-12-22 | Susan Hares | Changed milestone " Submit TRILL ARP/ND optimizations to IESG for publication as Proposed Standard", set due date to April 2014 from March 2014 |
2014-10-13 | Susan Hares | Changed milestone "Submit OAM Performance Management to IESG for Proposed Standard", resolved as "Done" |
2014-10-13 | Susan Hares | Changed milestone "Submit OAM Fault Management to IESG for Proposed Standard", resolved as "Done" |
2014-10-13 | Susan Hares | Changed milestone "Initial WG draft on TRILL over IP", resolved as "Done" |
2014-09-25 | Ted Lemon | Secretaries changed to Donald Eastlake from Susan Hares |
2014-09-25 | Ted Lemon | Chairs changed to Jon Hudson, Susan Hares from Jon Hudson, Donald Eastlake |
2014-06-23 | Stephanie McCammon | sent scheduled notification for IETF-90 |
2014-03-11 | Cindy Morgan | Secretaries changed to Susan Hares from |
2014-02-17 | Cindy Morgan | Secretaries changed to from Jon Hudson |
2014-02-17 | Cindy Morgan | Chairs changed to Donald Eastlake, Jon Hudson from Donald Eastlake, Erik Nordmark |
2013-12-31 | Ted Lemon | Changed milestone "Initial WG draft on TRILL IS-IS Security", set state to active from review, accepting new milestone |
2013-12-31 | Ted Lemon | Changed milestone "Submit Multi-topology TRILL to IESG for Proposed Standard", set state to active from review, accepting new milestone |
2013-12-31 | Ted Lemon | Changed milestone "Submit Multi-level TRILL to IESG for Proposed Standard", set state to active from review, accepting new milestone |
2013-12-31 | Ted Lemon | Changed milestone "Submit TRILL-over-IP to IESG for Proposed Standard", set state to active from review, accepting new milestone |
2013-12-31 | Ted Lemon | Changed milestone "Submit OAM Performance Management to IESG for Proposed Standard", set state to active from review, accepting new milestone |
2013-12-31 | Ted Lemon | Changed milestone "Submit Active-Active to IESG for Proposed Standard", set state to active from review, accepting new milestone |
2013-12-31 | Ted Lemon | Changed milestone "Initial WG draft on TRILL Implementation Report", set state to active from review, accepting new milestone |
2013-12-31 | Ted Lemon | Changed milestone "Submit OAM Fault Management to IESG for Proposed Standard", set state to active from review, accepting new milestone |
2013-12-31 | Ted Lemon | Changed milestone "Initial WG draft on TRILL over IP", set state to active from review, accepting new milestone |
2013-12-18 | Donald E. Eastlake 3rd | Changed milestone "Re-charter or shut down the WG", set due date to December 2015 from December 2014 |
2013-12-18 | Donald E. Eastlake 3rd | Changed milestone " Submit RBridge support of Data Center Bridging to IESG for publication as Proposed Standard (draft-eastlake-trill-rbridge-dcb)", set due date to March … Changed milestone " Submit RBridge support of Data Center Bridging to IESG for publication as Proposed Standard (draft-eastlake-trill-rbridge-dcb)", set due date to March 2015 from July 2013 |
2013-12-18 | Donald E. Eastlake 3rd | Added milestone "Initial WG draft on TRILL IS-IS Security" for review, due November 2014 |
2013-12-18 | Donald E. Eastlake 3rd | Added milestone "Submit Multi-topology TRILL to IESG for Proposed Standard" for review, due August 2014 |
2013-12-18 | Donald E. Eastlake 3rd | Added milestone "Submit Multi-level TRILL to IESG for Proposed Standard" for review, due July 2014 |
2013-12-18 | Donald E. Eastlake 3rd | Added milestone "Submit TRILL-over-IP to IESG for Proposed Standard" for review, due June 2014 |
2013-12-18 | Donald E. Eastlake 3rd | Added milestone "Submit OAM Performance Management to IESG for Proposed Standard" for review, due April 2014 |
2013-12-18 | Donald E. Eastlake 3rd | Added milestone "Submit Active-Active to IESG for Proposed Standard" for review, due April 2014 |
2013-12-18 | Donald E. Eastlake 3rd | Added milestone "Initial WG draft on TRILL Implementation Report" for review, due March 2014 |
2013-12-18 | Donald E. Eastlake 3rd | Changed milestone " Submit TRILL ARP/ND optimizations to IESG for publication as Proposed Standard", set due date to March 2014 from December 2013 |
2013-12-18 | Donald E. Eastlake 3rd | Added milestone "Submit OAM Fault Management to IESG for Proposed Standard" for review, due February 2014 |
2013-12-18 | Donald E. Eastlake 3rd | Changed milestone "Submit RBridge OAM framework document to the IESG for publication", set due date to February 2014 from January 2013, added draft-ietf-trill-oam-framework to milestone |
2013-12-18 | Donald E. Eastlake 3rd | Added milestone "Initial WG draft on TRILL over IP" for review, due January 2014 |
2013-12-18 | Donald E. Eastlake 3rd | Changed milestone "Initial WG draft on ARP/ND optimizations", set due date to December 2013 from March 2013 |
2013-12-18 | Donald E. Eastlake 3rd | Changed milestone "Initial WG document on RBridge OAM performance management", resolved as "Done", added draft-ietf-trill-loss-delay to milestone |
2013-12-18 | Donald E. Eastlake 3rd | Changed milestone "Initial WG framework document on RBridge OAM", resolved as "Done" |
2013-12-18 | Donald E. Eastlake 3rd | Deleted milestone "Submit TRILL Header Options to IESG for publication as Proposed Standard (draft-ietf-trill-rbridge-options)" |
2013-12-18 | Donald E. Eastlake 3rd | Deleted milestone "Initial WG draft on RBridge MIB module (draft-ietf-trill-rbridge-mib)" |
2013-12-18 | Donald E. Eastlake 3rd | Deleted milestone "Initial WG draft TRILL Header Options (draft-ietf-trill-rbridge-options)" |
2013-12-18 | Donald E. Eastlake 3rd | Deleted milestone "First draft showing what is needed for MIB" |
2013-12-18 | Donald E. Eastlake 3rd | Deleted milestone "Accept routing protocol requirements as a WG work item" |
2013-12-18 | Donald E. Eastlake 3rd | Deleted milestone "Accept architecture document as a WG work item" |
2013-12-18 | Donald E. Eastlake 3rd | Deleted milestone "Start work with routing area WG(s) to undertake TRILL extensions" |
2013-07-11 | Ted Lemon | Changed milestone " Initial WG document on RBridge OAM fault management", resolved as "Done", added draft-ietf-trill-oam-fm to milestone |
2013-07-08 | Ted Lemon | Changed milestone "Re-charter or shut down the WG", set due date to December 2014 from December 2014 |
2013-07-08 | Ted Lemon | Changed milestone " Submit TRILL ARP/ND optimizations to IESG for publication as Proposed Standard", set due date to December 2013 from December 2013 |
2013-07-08 | Ted Lemon | Changed milestone " Submit RBridge support of Data Center Bridging to IESG for publication as Proposed Standard (draft-eastlake-trill-rbridge-dcb)", set due date to July … Changed milestone " Submit RBridge support of Data Center Bridging to IESG for publication as Proposed Standard (draft-eastlake-trill-rbridge-dcb)", set due date to July 2013 from July 2013 |
2013-07-08 | Ted Lemon | Changed milestone "Initial WG document on RBridge OAM performance management", set due date to April 2013 from April 2013 |
2013-07-08 | Ted Lemon | Changed milestone "Initial WG draft on ARP/ND optimizations", set due date to March 2013 from March 2013 |
2013-07-08 | Ted Lemon | Changed milestone " Initial WG document on RBridge OAM fault management", set due date to January 2013 from January 2013 |
2013-07-08 | Ted Lemon | Changed milestone "Submit RBridge OAM framework document to the IESG for publication", set due date to January 2013 from January 2013, resolved as "Done" |
2013-07-08 | Ted Lemon | Changed milestone "nitial WG framework document on RBridge OAM", set description to "Initial WG framework document on RBridge OAM", set due date to November 2012 … Changed milestone "nitial WG framework document on RBridge OAM", set description to "Initial WG framework document on RBridge OAM", set due date to November 2012 from November 2012, added draft-ietf-trill-oam-framework to milestone |
2013-07-08 | Ted Lemon | Changed milestone "Submit RBridge OAM requirements document to the IESG for publication", set due date to November 2012 from November 2012, resolved as "Done", added … Changed milestone "Submit RBridge OAM requirements document to the IESG for publication", set due date to November 2012 from November 2012, resolved as "Done", added draft-ietf-trill-oam-req to milestone |
2013-07-08 | Ted Lemon | Changed milestone "Initial WG draft on RBridge OAM (draft-bond-trill-rbridge-oam)", set due date to November 2012 from November 2012 |
2013-07-08 | Ted Lemon | Changed milestone "Submit TRILL Header Options to IESG for publication as Proposed Standard (draft-ietf-trill-rbridge-options)", set due date to November 2012 from November 2012 |
2013-07-08 | Ted Lemon | Changed milestone "Initial WG draft on RBridge OAM (draft-bond-trill-rbridge-oam)", set due date to March 2011 from March 2011 |
2013-07-08 | Ted Lemon | Changed milestone "Submit TRILL Header Options to IESG for publication as Proposed Standard (draft-ietf-trill-rbridge-options)", set due date to March 2011 from March 2011 |
2013-07-08 | Ted Lemon | Changed milestone "Initial WG draft on trill adjacency state machine (draft-ietf-trill-adj)", set due date to February 2011 from February 2011 |
2013-07-08 | Ted Lemon | Changed milestone "Initial WG draft on RBridge MIB module (draft-ietf-trill-rbridge-mib)", set due date to February 2011 from February 2011 |
2013-07-08 | Ted Lemon | Changed milestone "Initial WG draft TRILL Header Options (draft-ietf-trill-rbridge-options)", set due date to February 2011 from February 2011 |
2013-07-08 | Ted Lemon | Changed milestone "Initial WG draft on VLAN Mapping (draft-ietf-trill-rbridge-vlan-mapping)", set due date to February 2011 from February 2011 |
2013-07-08 | Ted Lemon | Changed milestone "First draft showing what is needed for MIB", set due date to August 2009 from August 2009 |
2013-07-08 | Ted Lemon | Changed milestone "Submit base protocol specification to IEEE/IETF expert review", set due date to May 2009 from May 2009 |
2013-07-08 | Ted Lemon | Changed milestone "Submit problem statement and applicability to IESG for Informational RFC", set due date to December 2007 from December 2007 |
2013-07-08 | Ted Lemon | Changed milestone "Choose routing protocol(s) that can meet the requirements", set due date to December 2006 from December 2006 |
2013-07-08 | Ted Lemon | Changed milestone "Accept routing protocol requirements as a WG work item", set due date to July 2006 from July 2006 |
2013-07-08 | Ted Lemon | Changed milestone "Accept architecture document as a WG work item", set due date to July 2006 from July 2006 |
2013-03-13 | Cindy Morgan | Shepherding AD changed to Ted Lemon from Ralph Droms |
2012-12-07 | Cindy Morgan | Secretaries changed to Jon Hudson from |
2012-11-08 | (System) | Changed milestone "Initial WG draft on RBridge OAM (draft-bond-trill-rbridge-oam)", resolved as "Done" |
2012-11-08 | (System) | Changed milestone "Submit TRILL Header Options to IESG for publication as Proposed Standard (draft-ietf-trill-rbridge-options)", resolved as "Done" |
2012-11-08 | (System) | Changed milestone "Initial WG draft on RBridge OAM (draft-bond-trill-rbridge-oam)", resolved as "Done" |
2012-11-08 | (System) | Changed milestone "Submit TRILL Header Options to IESG for publication as Proposed Standard (draft-ietf-trill-rbridge-options)", resolved as "Done" |
2012-04-19 | Cindy Morgan | Info Changed |
2011-10-13 | (System) | Changed milestone "Submit RBridge MIB module to IESG for publication as Proposed Standard (draft-ietf-trill-rbridge-mib)", resolved as "Done" |
2011-10-13 | (System) | Changed milestone "Submit trill adjacency state machine to IESG for publication as Proposed Standard (draft-ietf-trill-adj)", resolved as "Done" |
2011-02-17 | (System) | Changed milestone "Initial WG draft on trill adjacency state machine (draft-ietf-trill-adj)", resolved as "Done" |
2011-02-17 | (System) | Changed milestone "Initial WG draft on RBridge MIB module (draft-ietf-trill-rbridge-mib)", resolved as "Done" |
2011-02-17 | (System) | Changed milestone "Initial WG draft TRILL Header Options (draft-ietf-trill-rbridge-options)", resolved as "Done" |
2011-02-17 | (System) | Changed milestone "Initial WG draft on VLAN Mapping (draft-ietf-trill-rbridge-vlan-mapping)", resolved as "Done" |
2010-04-12 | (System) | Changed milestone "First draft showing what is needed for MIB", resolved as "Done" |
2010-04-12 | (System) | Changed milestone "Base protocol specification submitted to the IESG for publication as a Proposed Standard RFC", resolved as "Done" |
2010-04-12 | (System) | Changed milestone "Submit base protocol specification to IEEE/IETF expert review", resolved as "Done" |
2009-02-25 | (System) | Changed milestone "Submit problem statement and applicability to IESG for Informational RFC", resolved as "Done" |
2007-09-30 | (System) | Changed milestone "Choose routing protocol(s) that can meet the requirements", resolved as "Done" |
2006-10-11 | (System) | Changed milestone "Accept routing protocol requirements as a WG work item", resolved as "Done" |
2006-10-11 | (System) | Changed milestone "Accept architecture document as a WG work item", resolved as "Done" |
2006-05-11 | (System) | Changed milestone "Start work with routing area WG(s) to undertake TRILL extensions", resolved as "Done" |
2006-05-11 | (System) | Changed milestone "Accept problem statement and applicability as a WG work item", resolved as "Done" |
2006-05-11 | (System) | Changed milestone "Accept base protocol specification as a WG document", resolved as "Done" |
2005-06-23 | (System) | Started group |
2005-06-15 | (System) | Proposed group |