Skip to main content

Common Control and Measurement Plane (ccamp)

WG Name Common Control and Measurement Plane
Acronym ccamp
Area Routing Area (rtg)
State Active
Charter charter-ietf-ccamp-08-01 Start Chartering/Rechartering (Internal Steering Group/IAB Review)
Document dependencies
Additional resources Additional CCAMP Web Page
Issue tracker
Wiki
Zulip Stream
Personnel Chairs Daniele Ceccarelli, Fatai Zhang, Luis M. Contreras
Area Director John Scudder
Secretary Haomian Zheng
Mailing list Address ccamp@ietf.org
To subscribe https://www.ietf.org/mailman/listinfo/ccamp
Archive https://mailarchive.ietf.org/arch/browse/ccamp/
Chat Room address https://zulip.ietf.org/#narrow/stream/ccamp

Charter for Working Group

The CCAMP working group is responsible for standardizing a common
control plane and a separate common measurement plane for non-packet
technologies found in the Internet and in the networks of telecom
service providers (ISPs and SPs). Examples of the devices in such
networks include photonic cross-connects, OEO switches, ROADMs, TDM
switches, microwave links, and Ethernet switches.

In this context, measurement refers to the acquisition and
distribution of attributes relevant to the setting up of tunnels
and paths.

The working group develops extensions to core Traffic Engineering
protocols that are under the care of other working groups. The CCAMP
working group will coordinate with the TEAS working group to ensure
that extensions that can be generalized for use with more than one
technology are made appropriately, and with the working groups that
have responsibility for the specific protocols.

CCAMP WG work scope includes:

  • Definition of protocol-independent metrics and parameters
    (measurement attributes) for describing links and paths that are
    required for routing and signaling in technology-specific
    networks. These will be developed in conjunction with requests
    and requirements from other WGs to ensure overall usefulness.

  • Maintenance and extension of the Link Management Protocol (LMP).

  • Functional specification of extensions for GMPLS-related routing
    (OSPF, ISIS) and signaling (RSVP-TE) protocols required for path
    establishment and maintenance in non-packet, technology-specific
    networks. Protocol formats and procedures that embody these
    extensions will be done jointly with the WGs supervising those
    protocols and the TEAS working group has the responsibility to
    determine whether such protocol extensions should be generalized
    for Traffic Engineering in any network.

This may include protocol work to support data planes that have
already been approved by another Standards Development
Organization. Note that the specification or modification of data
planes is out of scope of this working group

  • Definition of management objects (e.g., as part of MIB modules
    or YANG models) and control of OAM techniques relevant to the
    protocols and extensions specified within the WG. The OAM work
    will be synchronized with the LIME WG

  • Describe non-packet-specific aspects of traffic engineering
    including for multi-areas/multi-AS/multi-layer scenarios and
    define protocol extensions in cooperation with the TEAS and
    PCE working groups.

  • Define how the properties of network resources gathered by a
    measurement protocol (or by other means such as configuration)
    can be distributed in existing routing protocols, such as OSPF,
    IS-IS, and BGP-LS. CCAMP will work with the WGs that supervise
    these

The CCAMP WG currently works on the following tasks:

  • Protocol extensions in support of WSON.

  • Protocol extensions in support of flexible grid lambda networks.

  • Maintenance of existing protocol extensions for non-packet
    technology-specific networks (Ethernet, TDM, OTN) already
    specified by CCAMP.

  • Maintenance of LMP.

Milestones

Date Milestone Associated documents
Aug 2023 Submit client signal YANG model to IESG for review
Mar 2023 Submit DWDM interface LMP and YANG to IESG for review draft-ietf-ccamp-dwdm-if-lmp
Feb 2023 Submit OTN slicing YANG model to IESG for review draft-ietf-ccamp-yang-otn-slicing
Dec 2022 Submit YANG model of WSON Impairment Topology YANG model to IESG for review; draft-ietf-ccamp-optical-impairment-topology-yang
Dec 2022 Submit Info Model for WSON with impairments validation to IESG for review
Nov 2022 Submit Microwave topology model to IESG for review draft-ietf-ccamp-mw-topo-yang
Nov 2022 Submit OTN tunnel model to IESG for review draft-ietf-ccamp-otn-tunnel-model
Oct 2022 First version of client signal performance monitoring YANG model working group draft draft-zheng-ccamp-client-pm-yang
Sep 2022 Submit DWDM Interface YANG model to IESG for review draft-ietf-ccamp-dwdm-if-param-yang
Aug 2022 Submit L1CSM YANG model to IESG for review draft-ietf-ccamp-l1csm-yang
Aug 2022 First version of client tunnel YANG model working group draft draft-zheng-ccamp-client-tunnel-yang
Jul 2022 Submit YANG model of Layer 1 Types to IESG for review draft-ietf-ccamp-layer1-types
Jul 2022 Submit YANG model of OTN topology & Flexi-grid topology to IESG for review draft-ietf-ccamp-otn-topo-yang
Jul 2022 First version of YANG model of Ethernet Tunnel Working Group drafts draft-zheng-ccamp-client-tunnel-yang
Jun 2022 Submit T-NBI model applicability to IESG for review draft-ietf-ccamp-transport-nbi-app-statement
May 2022 Submit YANG modelling for flexi grid draft to IESG for review

Done milestones

Date Milestone Associated documents
Done Submit applicability of gmpls to OTN beyond 100G to IETF for review draft-ietf-ccamp-gmpls-otn-b100g-applicability
Done First version of OTN network slicing working group draft draft-zheng-ccamp-yang-otn-slicing
Done First version of YANG model of Ethernet Topology Working Group drafts draft-ietf-ccamp-eth-client-te-topo-yang
Done Recharter or close Working Group
Done Submit technology specific version of signaling and routing bandwidth availability draft to IESG for review
Done Submit flexi grid label, signaling and routing extensions to IESG for review
Done First version of YANG modelling for flexi grid Working Group draft
Done First draft of technology specific version of signaling and routing bandwidth availability working group draft.
Done Submit flexi grid framework to IESG for review
Done Submit OTN signal types update and sub registry drafts to IESG for review
Done Submit WSON signaling related draft for IESG review
Done Submit WSON routing related drafts for IESG review
Done Submit last OAM configuration solutions for IESG review
Done Submit first set of OAM configuration solutions for IESG review
Done First version flexigrid requirements/framework Working Group draft
Done Submit G.709 enhancements framework for IESG review
Done Submit G.709 enhancements solutions for IESG review
Done Submit LMP Negotiation for IESG review
Done Submit OAM configuration framework for IESG review
Done Submit RSVP-TE extensions for MPLS-TP for IESG review
Done Submit Control Plane Framework for MPLS-TP for IESG review
Done First version of Working Group draft defining RSVP-TE extensions for MPLS-TP
Done First version of G.709 enhancements solutions Working Group drafts
Done Submit WSON impairment framework draft for IESG review
Done First version of OAM configuration solutions Working Group draft
Done Submit Lambda labels draft for IESG review
Done Submit WSON framework draft for IESG review
Done First version of LMP Negotiation Working Group draft
Done First version of G.709 enhancements framework Working Group drafts
Done Submit TE MIB module IESG review
Done Submit VCAT/LCAS with GMPLS for IESG review
Done First version of Working Group draft providing Control Plane Framework for MPLS-TP
Done Submit hierarchy bis for IESG review
Done Submit Ethernet related drafts for IESG review
Done First version of WSON routing related Working Group drafts
Done Submit Protocol solutions for MLN/MRN I-D for IESG review
Done First version WG I-Ds for GMPLS source-controlled and explicitly-routed Ethernet networks
Done Submit Informational I-D for Analysis of inter-domain issues for disjoint and protected paths for IESG review
Done Submit Evaluation of existing protocols for MLN/MRN for IESG review
Done Submit MPLS-GMPLS interworking requirements and solutions I-D for IESG review
Done Submit Requirements for Multi-Layer and Multi-Region Networks I-D for IESG review
Done Submit MPLS to GMPLS migration strategies I-D for IESG review
Done Submit GMPLS routing and signaling interoperability advice I-D for IESG review
Done First version WG I-D GMPLS OAM Requirements
Done Submit I-D for Automatic discovery of MPLS-TE mesh membership for IESG review
Done First version WG I-D MPLS-GMPLS interworking requirements and solutions
Done Submit LSP Stitching I-D for IESG review
Done Submit GMPLS/ASON lexicography I-D for IESG review
Done First version of WG I-D for OSPF-TE/GMPLS MIB module
Done First version WG Informational I-D for Analysis of inter-domain issues for disjoint and protected paths
Done Submit GMPLS signaling in support of Call Management I-D for IESG review
Done Submit I-D for Advertising TE Node Capabilities in ISIS and OSPF for IESG review
Done First version WG I-D for Protocol solutions for MLN/MRN
Done Submit RSVP-TE extensions for inter-domain signaling I-D for IESG review
Done Submit Per-domain path computation signaling I-D for IESG review
Done First version of WG I-D for ASON Routing solutions
Done First version WG I-D for Evaluation of existing protocols for MLN/MRN
Done First version WG I-D Requirements for Multi-Layer and Multi-Region Networks
Done First version WG I-D MPLS to GMPLS migration strategies
Done Cross-WG review of I-D for Advertising TE Node Capabilities in ISIS and OSPF
Done Submit ASON Routing evaluation I-D for IESG review
Done First version WG I-D for Automatic discovery of MPLS-TE mesh membership
Done First version WG I-D for Advertising TE Node Capabilities in ISIS and OSPF
Done Submit revised charter and milestones to IESG for IESG consideration of more detailed deliverables and determination of usefulness of continuation of WG
Done Produce CCAMP WG document for generic tunnel tracing protocol
Done Produce CCAMP WG document for multi-area/AS signaling and routing
Done Submit ASON routing requirements doc to IESG
Done Submit ASON signaling requirements doc to IESG
Done Submit GMPLS MIBs to IESG
Done Submit protection & restoration documents to IESG
Done Submit LMP MIB to IESG
Done Submit WG document defining path setup portions of common control plane protocol
Done Submit WG document defining common measurement plane protocol
Done Build appropriate design teams
Done Identify and document a limited set of candidate solutions for signalling and for measurement. Among candidate control solutions to be considered are the existing GMPLS drafts.
Done Post strawman WG goals and charter

2 new milestones currently in Area Director review.