datatracker.ietf.org
Sign in
Version 5.9.0, 2014-12-18
Report a bug

Common Control and Measurement Plane (ccamp)

Group
Name: Common Control and Measurement Plane
Acronym:ccamp
Area:Routing Area (rtg)
State: Active
Charter: charter-ietf-ccamp-08 (Approved)
More info: Additional CCAMP Web Page
Personnel
Chairs: Daniele Ceccarelli <daniele.ceccarelli@ericsson.com>
Fatai Zhang <zhangfatai@huawei.com>
Area Director: Adrian Farrel <adrian@olddog.co.uk>
Secretary: Oscar Gonzalez de Dios <oscar.gonzalezdedios@telefonica.com>
Mailing List
Address:ccamp@ietf.org
To Subscribe:https://www.ietf.org/mailman/listinfo/ccamp
Archive:http://www.ietf.org/mail-archive/web/ccamp/
Jabber Chat
Room Address: xmpp:ccamp@jabber.ietf.org
Logs: http://jabber.ietf.org/logs/ccamp/

Charter for Working Group

The CCAMP working group is responsible for standardizing a common
control plane and a separate common measurement plane for non-packet
technologies found in the Internet and in the networks of telecom
service providers (ISPs and SPs). Examples of the devices in such
networks include photonic cross-connects, OEO switches, ROADMs, TDM
switches, microwave links, and Ethernet switches.

In this context, measurement refers to the acquisition and
distribution of attributes relevant to the setting up of tunnels
and paths.

The working group develops extensions to core Traffic Engineering
protocols that are under the care of other working groups. The CCAMP
working group will coordinate with the TEAS working group to ensure
that extensions that can be generalized for use with more than one
technology are made appropriately, and with the working groups that
have responsibility for the specific protocols.

CCAMP WG work scope includes:

- Definition of protocol-independent metrics and parameters
(measurement attributes) for describing links and paths that are
required for routing and signaling in technology-specific
networks. These will be developed in conjunction with requests
and requirements from other WGs to ensure overall usefulness.

- Maintenance and extension of the Link Management Protocol (LMP).

- Functional specification of extensions for GMPLS-related routing
(OSPF, ISIS) and signaling (RSVP-TE) protocols required for path
establishment and maintenance in non-packet, technology-specific
networks. Protocol formats and procedures that embody these
extensions will be done jointly with the WGs supervising those
protocols and the TEAS working group has the responsibility to
determine whether such protocol extensions should be generalized
for Traffic Engineering in any network.

This may include protocol work to support data planes that have
already been approved by another Standards Development
Organization. Note that the specification or modification of data
planes is out of scope of this working group

- Definition of management objects (e.g., as part of MIB modules
or YANG models) and control of OAM techniques relevant to the
protocols and extensions specified within the WG. The OAM work
will be synchronized with the LIME WG

- Describe non-packet-specific aspects of traffic engineering
including for multi-areas/multi-AS/multi-layer scenarios and
define protocol extensions in cooperation with the TEAS and
PCE working groups.

- Define how the properties of network resources gathered by a
measurement protocol (or by other means such as configuration)
can be distributed in existing routing protocols, such as OSPF,
IS-IS, and BGP-LS. CCAMP will work with the WGs that supervise
these

The CCAMP WG currently works on the following tasks:

- Protocol extensions in support of WSON.

- Protocol extensions in support of flexible grid lambda networks.

- Maintenance of existing protocol extensions for non-packet
technology-specific networks (Ethernet, TDM, OTN) already
specified by CCAMP.

- Maintenance of LMP.

Milestones

Done
Post strawman WG goals and charter
Done
Identify and document a limited set of candidate solutions for signalling and for measurement. Among candidate control solutions to be considered are the existing GMPLS drafts.
Done
Build appropriate design teams
Done
Submit WG document defining path setup portions of common control plane protocol
Done
Submit WG document defining common measurement plane protocol
Done
Submit LMP MIB to IESG
Done
Submit GMPLS MIBs to IESG
Done
Submit protection & restoration documents to IESG
Done
Submit ASON signaling requirements doc to IESG
Done
Produce CCAMP WG document for multi-area/AS signaling and routing
Done
Produce CCAMP WG document for generic tunnel tracing protocol
Done
Submit ASON routing requirements doc to IESG
Done
Submit revised charter and milestones to IESG for IESG consideration of more detailed deliverables and determination of usefulness of continuation of WG
Done
First version WG I-D for Advertising TE Node Capabilities in ISIS and OSPF
Done
First version WG I-D for Automatic discovery of MPLS-TE mesh membership
Done
Submit ASON Routing evaluation I-D for IESG review
Done
Cross-WG review of I-D for Advertising TE Node Capabilities in ISIS and OSPF
Done
First version WG I-D MPLS to GMPLS migration strategies
Done
Submit RSVP-TE extensions for inter-domain signaling I-D for IESG review
Done
Submit Per-domain path computation signaling I-D for IESG review
Done
First version of WG I-D for ASON Routing solutions
Done
First version WG I-D Requirements for Multi-Layer and Multi-Region Networks
Done
First version WG I-D for Evaluation of existing protocols for MLN/MRN
Done
Submit GMPLS signaling in support of Call Management I-D for IESG review
Done
Submit I-D for Advertising TE Node Capabilities in ISIS and OSPF for IESG review
Done
First version WG I-D for Protocol solutions for MLN/MRN
Done
First version of WG I-D for OSPF-TE/GMPLS MIB module
Done
First version WG Informational I-D for Analysis of inter-domain issues for disjoint and protected paths
Done
Submit GMPLS/ASON lexicography I-D for IESG review
Done
Submit LSP Stitching I-D for IESG review
Done
First version WG I-D MPLS-GMPLS interworking requirements and solutions
Done
Submit I-D for Automatic discovery of MPLS-TE mesh membership for IESG review
Done
First version WG I-D GMPLS OAM Requirements
Done
Submit GMPLS routing and signaling interoperability advice I-D for IESG review
Done
Submit MPLS to GMPLS migration strategies I-D for IESG review
Done
Submit Requirements for Multi-Layer and Multi-Region Networks I-D for IESG review
Done
Submit MPLS-GMPLS interworking requirements and solutions I-D for IESG review
Done
Submit Evaluation of existing protocols for MLN/MRN for IESG review
Done
Submit Informational I-D for Analysis of inter-domain issues for disjoint and protected paths for IESG review
Done
First version WG I-Ds for GMPLS source-controlled and explicitly-routed Ethernet networks
Done
Submit Protocol solutions for MLN/MRN I-D for IESG review
Done
First version of WSON routing related Working Group drafts
Done
Submit Ethernet related drafts for IESG review
Done
Submit hierarchy bis for IESG review
Done
First version of LMP Negotiation Working Group draft
Done
First version of G.709 enhancements framework Working Group drafts
Done
First version of Working Group draft providing Control Plane Framework for MPLS-TP
Done
Submit TE MIB module IESG review
Done
Submit VCAT/LCAS with GMPLS for IESG review
Done
Submit Lambda labels draft for IESG review
Done
Submit WSON framework draft for IESG review
Done
Submit WSON impairment framework draft for IESG review
Done
First version of OAM configuration solutions Working Group draft
Done
First version of G.709 enhancements solutions Working Group drafts
Done
First version of Working Group draft defining RSVP-TE extensions for MPLS-TP
Done
Submit Control Plane Framework for MPLS-TP for IESG review
Done
Submit RSVP-TE extensions for MPLS-TP for IESG review
Done
Submit OAM configuration framework for IESG review
Done
Submit LMP Negotiation for IESG review
Done
Submit G.709 enhancements framework for IESG review
Done
Submit G.709 enhancements solutions for IESG review
Done
First version flexigrid requirements/framework Working Group draft
Done
Submit first set of OAM configuration solutions for IESG review
Done
Submit last OAM configuration solutions for IESG review
Done
Submit WSON routing related drafts for IESG review
Done
Submit WSON signaling related draft for IESG review
Feb 2015
Submit OTN signal types update and sub registry drafts to IESG for review
Apr 2015
Submit flexi grid framework to IESG for review
Apr 2015
First draft of G.698.2 LMP and MIBs working group draft
Jun 2015
First draft of technology specific version of signaling and routing bandwidth availability working group draft.
Jun 2015
First draft of Information Encoding for WSON with Impairments Validation working group draft
Jul 2015
First version of YANG modelling for flexi grid Working Group draft
Sep 2015
Submit flexi grid label, signaling and routing extensions to IESG for review
Oct 2015
Submit flexi grid LMP to IESG for review
Nov 2015
First versions of impairments related solutions Working Group drafts
Dec 2015
Submit Info Model for WSON with impairments validation to IESG for review
Feb 2016
Submit G.698.2 LMP and MIBs drafts to IESG for review
Mar 2016
Submit technology specific version of signaling and routing bandwidth availability draft to IESG for review
May 2016
Submit Information Encoding for WSON with Impairments Validation draft to IESG for review
May 2016
Submit YANG modelling for flexi grid draft to IESG for review
Jul 2016
Recharter or close Working Group
Jul 2016
Submit impairments related solutions for IESG review