PCE Working Group Meeting – 13:50-15:50 Monday Afternoon session I
1. Introduction
1.1. Administrivia, Agenda Bashing (chairs, 5 min)
1.2. WG Status (chairs, 20 min) [25/120]
2. Segment Routing
2.1. Path Segment & bi-directional SR (Cheng Li, 15 min) [40/120]
draft-li-pce-sr-path-segment-03
2.2. PCEP for SRv6 (Dhruv Dhody, 15 min) [55/120]
draft-negi-pce-segment-routing-ipv6-03
draft-dhody-pce-pcep-srv6-yang-00
2.3. Binding Segment (Jeff Tantsura, 10 min) [65/120]
draft-sivabalan-pce-binding-label-sid-05
3. Optical
3.1. PCEP for Flex-Grid (Young Lee, 10 min) [75/120]
draft-lee-pce-flexible-grid-03
4. PCE as a Central Controller
4.1. PCECC Extensions for P2MP/SRv6 (Dhruv Dhody, 15 min) [90/120]
draft-dhody-pce-pcep-extension-pce-controller-p2mp-00
draft-dhody-pce-pcep-extension-pce-controller-srv6-00
5. Other Topics
5.1. Multi-Layer Association (Quan Xiong, 10 min) [100/120]
draft-xiong-pce-multilayer-lsp-association-02