IP Performance Measurement (ippm)

WG Name IP Performance Measurement
Acronym ippm
Area Transport Area (tsv)
State Active
Charter charter-ietf-ippm-06 Approved
Status Update Show update (last changed 2016-04-15)
Dependencies Document dependency graph (SVG)
Additional URLs Wiki
Issue tracker
Personnel Chairs Bill Cerveny
Brian Trammell
Area Director Spencer Dawkins
Mailing list Address ippm@ietf.org
To subscribe https://www.ietf.org/mailman/listinfo/ippm
Archive https://mailarchive.ietf.org/arch/browse/ippm/
Jabber chat Room address xmpp:ippm@jabber.ietf.org?join
Logs https://jabber.ietf.org/logs/ippm/

Charter for Working Group

The IP Performance Measurement (IPPM) Working Group develops and maintains
standard metrics that can be applied to the quality, performance, and
reliability of Internet data delivery services and applications running over
transport layer protocols (e.g. TCP, UDP) over IP. It also develops and
maintains methodologies and protocols for the measurement of these metrics.
These metrics, protocols, and methodologies are designed such that they can be
used by network operators, end users, or independent testing groups. Metrics
developed by the IPPM WG are intended to provide unbiased quantitative
performance measurements.

The IPPM WG works to foster commonality and comparability of metrics and
measurements across IETF protocols at different layers. Its work is limited to
metrics and methodologies which are applicable over transport-layer protocols
over IP, and does not specify encapsulations required for measurements over
non-IP layers.

The IPPM WG has produced documents that define specific metrics and procedures
for accurately measuring and documenting these metrics. The working group will
continue advancing the most useful of these metrics along the standards track,
using the guidelines stated in RFC 6576. To the extent possible, these metrics
will be used as the basis for future work on metrics in the WG.

The WG will seek to develop new metrics and models to accurately characterize
the network paths under test and/or the performance of transport and application
layer protocols on these paths. The WG will balance the need for new metrics
with the desire to minimize the introduction of new metrics, and will require
that new metric definitions state how the definition improves on an existing
metric definition, or assesses a property of network performance not previously
covered by a defined metric. Metric definitions will follow the template given
in RFC 6390.

Additional methods will be defined for the composition and calibration of
IPPM-defined metrics, as well as active, passive and hybrid measurement methods
for these metrics. In addition, the WG encourages work which describes the
applicability of metrics and measurement methods, especially to improve
understanding of the tradeoffs involved among active, passive, and hybrid
methods.

The WG may update its core framework RFC 2330 as necessary to accommodate these activities.

The WG has produced protocols for communication among test equipment to enable
the measurement of the one- and two-way metrics (OWAMP and TWAMP respectively).
These protocols will be advanced along the standards track. The work of the WG
will take into account the suitability of measurements for automation, in order
to support large-scale measurement efforts. This may result in further
developments in protocols such as OWAMP and TWAMP.

Agreement about the definitions of metrics and methods of measurement enables
accurate, reproducible, and equivalent results across different implementations.
To this end, the WG defines and maintains a registry of metric definitions.

The WG encourages work which assesses the comparability of measurements of IPPM
metrics with metrics developed elsewhere. The WG also encourages work which
improves the availability of information about the context in which measurements
were taken, for example (but not limited to) measurement implementation
information, estimates of confidence in these measurements, conditions on the
network(s) on which measurements are taken, and/or information about the
data-plane topology of these network(s).

In the interest of measurement comparability, the WG may define data formats and
information models for the storage and exchange of the results of measurements
defined within IPPM.

The IPPM WG seeks cooperation with other appropriate standards bodies and forums
to promote consistent approaches and metrics. Within the IETF process, IPPM
metric definitions and measurement protocols will be subject to as rigorous a
scrutiny for usefulness, clarity, and accuracy as other protocol standards. The
IPPM WG will interact with other areas of IETF activity whose scope intersects
with the requirement of these specific metrics. The WG will, on request, provide
input to other IETF working groups on the use and implementation of these
metrics.

Milestones

Date Milestone
Nov 2018 submit a Standards Track draft on inband OAM based measurement methodologies to the IESG
Jul 2018 submit a Standards Track document to the IESG updating RFC2330 to cover IPv6
Nov 2017 Submit an Experimental draft on coloring-based hybrid measurement methodologies for loss and delay to the IESG
Nov 2017 submit a Standards Track document to the IESG defining initial contents of performance metric registry
Nov 2017 Submit draft on core registry for performance metrics to IESG as Proposed Standard
draft-ietf-ippm-metric-registry
Oct 2017 submit a Standards Track document to the IESG for a YANG model for managing TWAMP clients and servers
Done submit a Standards Track document to the IESG adding support for IEEE-1588 timestamps to TWAMP
Done Submit a draft on the IPv6 Performance and Diagnostic Metrics (PDM) Destination Option as Proposed Standard
draft-ietf-ippm-6man-pdm-option
Done Submit draft on model-based TCP bulk transfer capacity metrics to IESG as Experimental
draft-ietf-ippm-model-based-metrics
Done Submit a draft defining terminology for the continuum of passive and active measurement to the IESG as Informational
Done Submit draft on the UDP Checksum Trailer in OWAMP and TWAMP to the IESG as Informational
draft-ietf-ippm-checksum-trailer
Done Submit draft on DSCP and ECN monitoring in TWAMP to IESG as Proposed Standard
draft-ietf-ippm-type-p-monitor
Done Submit draft on "A One-Way Loss Metric for IPPM" (RFC 2680 bis) as Internet Standard
draft-ietf-ippm-2680-bis
Done Submit draft on "A One-Way Delay Metric for IPPM" (RFC 2679 bis) as Internet Standard
draft-ietf-ippm-2679-bis
Done Submit draft on OWAMP / TWAMP Security to IESG as Proposed Standard
draft-ietf-ippm-ipsec
Done Submit draft on access rate measurement protocol problem statement to IESG as Informational
draft-ietf-ippm-rate-problem
Done Submit draft on reference path for measurement location to IESG as Informational
draft-ietf-ippm-lmap-path
Done Submit draft updating the IPPM Framework (2330-update) to IESG as Proposed Standard
draft-ietf-ippm-2330-update
Done Submit draft on RFC 2680 standards-track advancement testing to IESG as Informational
draft-ietf-ippm-testplan-rfc2680