Concluded WG Integrated Services over Specific Link Layers (issll)
Note: The data for concluded WGs is occasionally incorrect.
WG | Name | Integrated Services over Specific Link Layers | |
---|---|---|---|
Acronym | issll | ||
Area | Transport Area (tsv) | ||
State | Concluded | ||
Charter | charter-ietf-issll-01 Approved | ||
Document dependencies | |||
Personnel | Chairs | Eric S. Crawley, John T. Wroclawski | |
Mailing list | Address | issll@mercury.lcs.mit.edu | |
To subscribe | issll-request@mercury.lcs.mit.edu | ||
Archive | ftp://mercury.lcs.mit.edu/pub/issll/mail/ |
Final Charter for Working Group
The ISSLL Working Group defines specifications and techniques needed
to implement Internet Integrated Services capabilities within specific
network technologies.
The Internet Integrated Services design, developed within the IETF by
working groups such as INTSERV and RSVP, specifies extensions to the
IP architecture which allow applications to request and receive a
specific level of service from the internetwork, as alternatives to
the current IP best-effort service class. The work of these groups has
resulted in technology-independent protocols and specifications.
Focused engineering work to define the mapping of these universal
specifications onto specific subnetwork technologies is now required.
At minimum, the following points must be addressed for each candidate
technology:
-
Service mappings. Service mappings define the way that the link layer
technology is used to provide a particular IntServ traffic management
service, such as controlled-load or guaranteed-delay. -
Setup protocol mappings. Setup protocol mappings define how an
internet-
level setup protocol such as RSVP is implemented or mapped onto the
link
layer technology. -
Adaptation protocols. Adaptation protocols are used to augment the
native capabilities of the link-layer technology, when this is
necessary to support required Integrated Services functions. -
Statements of non-applicability. Statements of non-applicability
describe
which Integrated Service capabilities are not supported by the link
layer technology under consideration.
The ISSLL WG will carry out this work for all technologies with
perceived
market demand and of sufficient interest to its members. To ensure
timely
progress on each work item the WG will employ an administrative
structure
based on technology coordinators, as described below. The WG expects to
coordinate its activities across technologies whenever technical
commonality between layer two media is apparent. The WG chairs hold
primary responsibility for this coordinating role.
WG Outputs:
The WG is expected to produce standards-track RFC's, informational RFC's
and "best-current-practices" guidelines, as required. The need for
standards-track RFC's is limited both because the work of the group is
focused on the engineering of existing protocols to existing link layer
technologies, and because in certain cases information and guidelines
will better serve the needs of a rapidly evolving technology.
Operational Structure:
Due to the scope of the task and the need for parallel progress on
multiple work items, the WG effort is organized as follows:
A technical coordinator will be identified and selected for each media
technology adopted as a work item by the group. This person will be
responsible for coordinating the technical efforts of the group with
respect to that media, working with and motivating the document
editors, and evangelizing the group's work within the community and
relevant external organizations such as the IEEE and ATM Forum.
Since many link layer media continue to evolve, and since that evolution
may be influenced by the work of the ISSLL WG, it is expected that each
technology work item will be divided into short term tasks, medium term
tasks, and ongoing monitoring, as follows:
-
Short term tasks focus on using the existing technology as best
as possible with no changes whatsoever. This work will accept whatever
limits are imposed the link-level and IP-level technology, with the
goal of creating the best solution possible within a 6-9 month
timeframe. -
Medium term tasks focus on planned changes to the technology that are
currently being standardized and may not yet be widely available
Ideally this work would conclude just as the changes become available
in the market. In general a 1-1.5 year timeframe is appropriate for
these
tasks. -
Monitoring focuses on tracking and advising on changes being made by
others to a link layer technology, to allow it to better support the
Integrated Services models and protocols. Generally, these efforts
would
be conducted as informal activities, rather than work items within the
WG
structure. The exception would be when formal cooperation between the
WG
and an external effort was required.
In addition to the normal responsibilities of IETF working group chairs,
the ISSLL chairs hold primary responsibility for selection of
coordinators,
identifying areas of technical commonality and building cross-technology
efforts within the group.
Relationship to Other Working Groups:
The ISSLL WG maintains a close working relationship with the INTSERV
and RSVP WG's. Particularly, ISSLL may wish to feed back information
about the effectiveness or limitations of RSVP and INTSERV work in the
context of a specific technology to these groups for review. ISSLL is
also expected to interact with other WG's as needed to aid in the use
of particular media (e.g. IPATM, PPPEXT).
Coordinators for initially important technologies:
ATM Sue Thomson, set@bellcore.com
Low-Speed Serial Carsten Bormann, cabo@informatik.uni-bremen.de
Ethernet
Token Ring Wayne Pace, pacew@raleigh.ibm.com
Frame Relay
Cable Modems
Milestones
Date | Milestone | Associated documents |
---|---|---|
Mar 2000 | Submit Internet-Draft on service mapping of intserv services onto diffserv clouds to IESG for publication as a RFC. |
Done milestones
Date | Milestone | Associated documents |
---|---|---|
Done | Submit Framework for int-serv in switched and shared IEEE 802 LAN technologies for informational publication. | |
Done | Submit int-serv mappings onto IEEE 802 networks draft to IESG for standards track. | |
Done | Submit SBM protocol draft to IESG for standards track. | |
Done | Submit Internet-Draft describing use of RSVP for managing aggregate resources in diffserv clouds for publication as an RFC. | |
Done | Submit Internet-Draft of MIB for Subnet Bandwidth Manage to IESG for publication as a RFC. | |
Done | Submit Internet-Draft of intserv-diffserv integration framework document to IESG for publication as a RFC. | |
Done | Publish Internet-Draft on service mapping - support of intserv services using diffserv aggregate scheduling mechanisms. | |
Done | Submit Internet-Draft on DCLASS object to IESG for publication as a proposed standard | |
Done | Submit Internet-Draft on Realtime Header-compression and packet framing protocol to IESG for publication as an RFC. | |
Done | Submit Internet-Draft on Controlled Load Service over ISSLOW to IESG for publication as an RFC. | |
Done | Submit Internet-Draft on Updated Overview of Integrated Services over ATM to IESG for publication as an RFC. | |
Done | Submit Internet-Draft on dcouments relate to the ATM Forum 4.0 Specification(s) | |
Done | Submit Internet-Draft on Guaranteed Service over ATM UNI 3.X to IESG for publication as an RFC. | |
Done | Submit Internet-Draft on ATM Forum 4.0 Specification(s) | |
Done | Submit Internet-Draft of Updates of the documents relate to the ATM Forum 4.0 Specification(s) | |
Done | Submit Internet-Draft of Updated Overview of Integrated Services over ATM to include Short Cuts and VC Aggregation | |
Done | Submit Internet-Draft on The Operation of RSVP over ATM UNI 3.X | |
Done | Submit Internet-Draft on Controlled Load Service over ATM UNI 3.x to IESG for publication as an RFC. | |
Done | Submit Internet-Draft on Overview of Integrated Services over ATM UNI 3.X to IESG for publication as an RFC. | |
Done | Submit Internet-Draft of Controlled Load Service over token ring networks (switched and shared). | |
Done | Submit Internet-Draft of Guaranteed Service over ATM UNI 3.X (includes parameter mapping, VC management, and references VC usage guidelines from Overview) | |
Done | Submit Internet-Draft of Realtime Header-compression and packet framing protocol. [Requires close coordination with PPPEXT and AVT.] | |
Done | Submit Internet-Draft of Controlled Load Service over ATM UNI 3.x (includes parameter mapping, VC management, and references VC usage guidelines from Overview) | |
Done | Submit Internet-Draft of Controlled Load Service over ISSLOW. | |
Done | Submit Internet-Draft of The Operation of RSVP over ATM UNI 3.X | |
Done | Submit Internet-Draft of Integrated Services over token ring networks (switched and shared with sections on source route bridging, token priority, filtering, etc). | |
Done | Submit Internet-Draft of Overview of Integrated Services over ATM UNI 3.X (VC management, issues, models, and other service and setup protocol independent pieces) |