Skip to main content

TE Topology and Tunnel Modeling for Transport Networks
draft-bryskin-teas-te-topo-and-tunnel-modeling-01

Revision differences

Document history

Date Rev. By Action
2018-04-27
01 (System) Document has expired
2017-12-22
01 Lou Berger See https://mailarchive.ietf.org/arch/msg/teas/IFVcs5eqkYGWv4CAIXSjUrfGMZk
2017-12-22
01 Lou Berger IETF WG state changed to Call For Adoption By WG Issued from Candidate for WG Adoption
2017-12-22
01 Lou Berger All IPR response received:
Tarek: https://mailarchive.ietf.org/arch/msg/teas/SGNRCIJ4ffWEVlR9YVncc5vCt14
2017-10-24
01 Vishnu Beeram The previous state was set by mistake.
2017-10-24
01 Vishnu Beeram IETF WG state changed to Candidate for WG Adoption from Call For Adoption By WG Issued
2017-10-24
01 Vishnu Beeram IETF WG state changed to Call For Adoption By WG Issued from Candidate for WG Adoption
2017-10-24
01 Xufeng Liu New version available: draft-bryskin-teas-te-topo-and-tunnel-modeling-01.txt
2017-10-24
01 (System) New version approved
2017-10-24
01 (System) Request for posting confirmation emailed to previous authors: Tarek Saad , Igor Bryskin , Vishnu Beeram , Xufeng Liu
2017-10-24
01 Xufeng Liu Uploaded new revision
2017-10-20
00 Lou Berger IPR Poll:  https://mailarchive.ietf.org/arch/msg/teas/4C7_fCR9_GCwWe9YGS36nXebbsk

Still waiting on: tsaad@cisco.com
2017-10-13
00 Lou Berger IPR Poll:  https://mailarchive.ietf.org/arch/msg/teas/4C7_fCR9_GCwWe9YGS36nXebbsk

igor.bryskin@huawei.com: https://mailarchive.ietf.org/arch/msg/teas/CdxGfwuazTe2xdCcIwMEzMKS5fk
vbeeram@juniper.net: https://mailarchive.ietf.org/arch/msg/teas/aWZhWKOuKrn_75BX0Ssrjs0H5-k
xufeng_liu@jabil.com,https://mailarchive.ietf.org/arch/msg/teas/GR8piHDT7-RWgesldvyuvlQ7EyU

Missing:
tsaad@cisco.com,
2017-10-13
00 Lou Berger IETF WG state changed to Candidate for WG Adoption
2017-10-13
00 Lou Berger Notification list changed to none
2017-10-13
00 Lou Berger Changed group to Traffic Engineering Architecture and Signaling (TEAS)
2017-10-13
00 Lou Berger Changed stream to IETF
2017-06-29
00 Xufeng Liu New version available: draft-bryskin-teas-te-topo-and-tunnel-modeling-00.txt
2017-06-29
00 (System) New version approved
2017-06-29
00 Xufeng Liu Request for posting confirmation emailed  to submitter and authors: Vishnu Pavan Beeram , Tarek Saad , Igor Bryskin , Xufeng Liu
2017-06-29
00 Xufeng Liu Uploaded new revision