Skip to main content

TRILL Distributed Layer 3 Gateway
draft-hao-trill-irb-05

Revision differences

Document history

Date Rev. By Action
2015-10-14
05 (System) Notify list changed from trill-chairs@ietf.org to (None)
2014-11-06
05 Donald Eastlake Adoption notice posted 6 November 2014:
http://www.ietf.org/mail-archive/web/trill/current/msg06497.html
2014-11-06
05 Donald Eastlake IETF WG state changed to Adopted by a WG from Call For Adoption By WG Issued
2014-10-31
05 Donald Eastlake 2 week call for adoption issued 20 October.
2014-10-31
05 Donald Eastlake IETF WG state changed to Call For Adoption By WG Issued
2014-10-31
05 Donald Eastlake Notification list changed to trill-chairs@tools.ietf.org, draft-hao-trill-irb.all@tools.ietf.org, trill@ietf.org
2014-10-31
05 Donald Eastlake Changed group to Transparent Interconnection of Lots of Links (TRILL)
2014-10-31
05 Donald Eastlake Changed stream to IETF
2014-10-14
05 Hao Weiguo New version available: draft-hao-trill-irb-05.txt
2014-06-09
04 Hao Weiguo New version available: draft-hao-trill-irb-04.txt
2014-02-13
03 Hao Weiguo New version available: draft-hao-trill-irb-03.txt
2013-07-11
02 Weiguo Hao New version available: draft-hao-trill-irb-02.txt
2013-07-11
01 Hao Weiguo New version available: draft-hao-trill-irb-01.txt
2013-04-26
00 Hao Weiguo New version available: draft-hao-trill-irb-00.txt