Skip to main content

A YANG Data Model for Network Diagnosis using Scheduled Sequences of OAM Tests
draft-ietf-opsawg-scheduling-oam-tests-11

Document Type Active Internet-Draft (opsawg WG)
Authors Luis M. Contreras , Victor Lopez , Qin Wu
Last updated 2026-10-13
Replaces draft-contreras-opsawg-scheduling-oam-tests
RFC stream Internet Engineering Task Force (IETF)
Intended RFC status (None)
Formats
Yang Validation 0 errors, 0 warnings
Reviews
YANGDOCTORS Early review (of -09) by Italo Busi Partially completed On the right track
Additional resources Mailing list discussion
Stream WG state WG Document
Document shepherd Giuseppe Fioccola
IESG IESG state I-D Exists
Consensus boilerplate Unknown
Telechat date (None)
Responsible AD (None)
Send notices to giuseppe.fioccola@huawei.com
draft-ietf-opsawg-scheduling-oam-tests-11
Operations and Management Area Working Group             L. M. Contreras
Internet-Draft                                                Telefonica
Intended status: Standards Track                                V. Lopez
Expires: 16 April 2027                                             Nokia
                                                                   Q. Wu
                                                                  Huawei
                                                         13 October 2026

A YANG Data Model for Network Diagnosis using Scheduled Sequences of OAM
                                 Tests
               draft-ietf-opsawg-scheduling-oam-tests-11

Abstract

   This document defines two YANG Data Models to support scheduled
   network diagnosis using Operations, Administration, and Maintenance
   (OAM) tests.  This document defines both 'oam-unitary-test' and 'oam-
   sequence-test' YANG modules to manage the lifecycle of network
   diagnosis procedures, intended for use by external management and
   orchestration systems (including SDN controllers and network
   orchestrators), rather than by individual network nodes.

About This Document

   This note is to be removed before publishing as an RFC.

   The latest revision of this draft can be found at
   https://vlopezalvarez.github.io/draft-contreras-opsawg-scheduling-
   oam-tests/draft-ietf-opsawg-scheduling-oam-tests.html.  Status
   information for this document may be found at
   https://datatracker.ietf.org/doc/draft-ietf-opsawg-scheduling-oam-
   tests/.

   Discussion of this document takes place on the Operations and
   Management Area Working Group Working Group mailing list
   (mailto:opsawg@ietf.org), which is archived at
   https://mailarchive.ietf.org/arch/browse/opsawg/.  Subscribe at
   https://www.ietf.org/mailman/listinfo/opsawg/.

   Source for this draft and an issue tracker can be found at
   https://github.com/vlopezalvarez/draft-contreras-opsawg-scheduling-
   oam-tests.

Status of This Memo

   This Internet-Draft is submitted in full conformance with the
   provisions of BCP 78 and BCP 79.

Contreras, et al.         Expires 16 April 2027                 [Page 1]
Internet-Draft             Scheduling OAM YANG              October 2026

   Internet-Drafts are working documents of the Internet Engineering
   Task Force (IETF).  Note that other groups may also distribute
   working documents as Internet-Drafts.  The list of current Internet-
   Drafts is at https://datatracker.ietf.org/drafts/current/.

   Internet-Drafts are draft documents valid for a maximum of six months
   and may be updated, replaced, or obsoleted by other documents at any
   time.  It is inappropriate to use Internet-Drafts as reference
   material or to cite them other than as "work in progress."

   This Internet-Draft will expire on 16 April 2027.

Copyright Notice

   Copyright (c) 2026 IETF Trust and the persons identified as the
   document authors.  All rights reserved.

   This document is subject to BCP 78 and the IETF Trust's Legal
   Provisions Relating to IETF Documents (https://trustee.ietf.org/
   license-info) in effect on the date of publication of this document.
   Please review these documents carefully, as they describe your rights
   and restrictions with respect to this document.  Code Components
   extracted from this document must include Revised BSD License text as
   described in Section 4.e of the Trust Legal Provisions and are
   provided without warranty as described in the Revised BSD License.

Table of Contents

   1.  Introduction  . . . . . . . . . . . . . . . . . . . . . . . .   3
     1.1.  Terminology and Notations . . . . . . . . . . . . . . . .   5
     1.2.  Requirements Language . . . . . . . . . . . . . . . . . .   6
     1.3.  Prefix in Data Node Names . . . . . . . . . . . . . . . .   7
   2.  Sample OAM Test Scheduling Network Model Usage  . . . . . . .   7
   3.  Network-wide OAM Use Cases  . . . . . . . . . . . . . . . . .   8
     3.1.  Troubleshooting . . . . . . . . . . . . . . . . . . . . .   8
     3.2.  Birth Certificate . . . . . . . . . . . . . . . . . . . .   9
     3.3.  Proactive Supervision . . . . . . . . . . . . . . . . . .   9
     3.4.  Performance-based Traffic Engineering and Routing . . . .  10
   4.  Modelling the Scheduling of OAM Tests . . . . . . . . . . . .  10
     4.1.  Relationship Between OAM Unitary Test and OAM Sequence
           Test  . . . . . . . . . . . . . . . . . . . . . . . . . .  10
     4.2.  OAM Unitary Test  . . . . . . . . . . . . . . . . . . . .  11
       4.2.1.  Unitary Test Status State Machine . . . . . . . . . .  14
     4.3.  OAM Sequence Test . . . . . . . . . . . . . . . . . . . .  15
       4.3.1.  Sequence Test Status State Machine  . . . . . . . . .  18
   5.  YANG Data Models for Scheduling OAM Tests . . . . . . . . . .  19
     5.1.  YANG Model for Scheduling OAM Unitary Test  . . . . . . .  19
     5.2.  YANG Model for OAM Sequence Test  . . . . . . . . . . . .  26

Contreras, et al.         Expires 16 April 2027                 [Page 2]
Internet-Draft             Scheduling OAM YANG              October 2026

   6.  Using Device Model Within OAM Scheduling Models . . . . . . .  29
   7.  Operational Considerations  . . . . . . . . . . . . . . . . .  30
     7.1.  Conflict Resolution and Reporting Among Scheduled OAM
           Tasks . . . . . . . . . . . . . . . . . . . . . . . . . .  30
     7.2.  Coverage of Input Parameters and Output Results . . . . .  32
     7.3.  Use of the Managed Leaf . . . . . . . . . . . . . . . . .  32
     7.4.  Performance impact and Operational Guidance for concurrent
           OAM task scheduling . . . . . . . . . . . . . . . . . . .  33
     7.5.  Impact on Security Operations . . . . . . . . . . . . . .  33
     7.6.  Schedule Health Verification  . . . . . . . . . . . . . .  34
     7.7.  Operational Considerations for Auditing and Results
           Tracking  . . . . . . . . . . . . . . . . . . . . . . . .  34
   8.  Security Considerations . . . . . . . . . . . . . . . . . . .  35
   9.  IANA Considerations . . . . . . . . . . . . . . . . . . . . .  36
     9.1.  Updates to the IETF XML Registry for New YANG Module  . .  36
     9.2.  Updates to the YANG Module Names Registry for New YANG
           Module  . . . . . . . . . . . . . . . . . . . . . . . . .  36
   10. Implementation Status . . . . . . . . . . . . . . . . . . . .  36
   Acknowledgments . . . . . . . . . . . . . . . . . . . . . . . . .  36
   References  . . . . . . . . . . . . . . . . . . . . . . . . . . .  37
     Normative References  . . . . . . . . . . . . . . . . . . . . .  37
     Informative References  . . . . . . . . . . . . . . . . . . . .  39
   Appendix A.  Examples . . . . . . . . . . . . . . . . . . . . . .  43
     A.1.  Create a TWAMP OAM test . . . . . . . . . . . . . . . . .  43
     A.2.  Ping OAM Test Template  . . . . . . . . . . . . . . . . .  46
   Appendix B.  Change between Revision  . . . . . . . . . . . . . .  49
   Authors' Addresses  . . . . . . . . . . . . . . . . . . . . . . .  50

1.  Introduction

   Operations, Administration, and Maintenance (OAM) tasks are
   fundamental functions of the network management (see, e.g.,
   [RFC7276]).  Given the emergence of data models and their utilization
   in Service Provider's network management and the need to automate the
   overall service management lifecycle [RFC8969], managing OAM
   operations is also essential.  Relevant data models are still missing
   to cover specific needs.

   The term OAM is used in this document as defined in [RFC6291] and
   further characterized according to the classification guidelines in
   [RFC10014].  The scope of this document applies primarily to active
   and hybrid OAM mechanisms, as scheduling tests generally implies the
   generation of additional OAM traffic.  Passive OAM mechanisms are not
   the focus of this work.

Contreras, et al.         Expires 16 April 2027                 [Page 3]
Internet-Draft             Scheduling OAM YANG              October 2026

   Specifically, OAM functions provide the means to identify and isolate
   faults, measure and report the network performance (see section 4.2,
   [RFC6632]).  For example, [RFC5860] defines the three main areas
   involved in OAM:

   *  Fault management, which allows network operators quickly identify
      and isolate faults in the network.  Examples of these mechanisms
      for fault detection and isolation are: continuity check, link
      trace, and loopback.

   *  Performance management enables monitoring network performance and
      diagnosing performance issues (i.e., degradation).  Some of the
      measurements such as packet delay measurement, packet delay
      variation measurement, and packet loss measurement.

   *  Security management defines mechanisms to protect OAM
      communications from unauthorized access and tampering.

   [RFC7276] presents OAM tools for detecting and isolating failures in
   networks and for performance monitoring, some examples are:

   *  Continuity Check: This function verifies that a path exists
      between two points in a network and that the path is operational.
      Some technologies following this approach are Y.1731 Continuity
      Check [ITU-T-Y1731], Ethernet OAM Continuity Check [IEEE-8021Q],
      MPLS-TP BFD CC [RFC6428].

   *  Loopback: This function allows a device to loop back a received
      packet back to the sender for diagnostic purposes.  There are
      multiple technologies for this function, like IP Ping [RFC0792],
      [RFC4443], VCCV Ping [RFC5085], LSP Ping [RFC4379] or Ethernet
      Loopback [IEEE-8021Q].

   *  Link Trace: This function allows a network operator to trace a
      path through a network from one device to another.  Some
      technologies following this approach are Y.1731 Linktrace
      [ITU-T-Y1731] or IP traceroute [RFC0792], [RFC4443].

   *  Performance Monitoring: This function allows a network operator to
      monitor the performance of a network and to identify and diagnose
      performance issues.  Protocols like TWAMP [RFC5357], STAMP
      [RFC8762], Alternative Marking [RFC9341], IOAM (In Situ OAM)
      [RFC9197], or Y.1731 DMM/SLM [ITU-T-Y1731] can obtain performance
      measurements.

   More recently, Incident Management
   [I-D.ietf-nmop-network-incident-yang] focuses on the network incident
   diagnosis, which can be favored by dynamic invocation of OAM tests.

Contreras, et al.         Expires 16 April 2027                 [Page 4]
Internet-Draft             Scheduling OAM YANG              October 2026

   [RFC8531], [RFC8532], [RFC8533] defined YANG models for OAM
   technologies:

   o [RFC8531] "A YANG Data Model for Connection Oriented OAM": defines
   a YANG data model for connection-oriented OAM protocols.  The main
   aim of this document is to define a generic YANG data model that can
   be used to configure, control, and monitor connection-oriented OAM
   protocols such as MPLS-TP OAM [RFC6371] and TRILL OAM [RFC7174].

   o [RFC8532] "A YANG Data Model for Connectionless OAM Protocols":
   provides a generic YANG data model that can be used to configure,
   control, and monitor connectionless OAM protocols such as BFD
   (Bidirectional Forwarding Detection) [RFC5880], ICMP Ping [RFC792]
   [RFC4443], and LSP Ping [RFC8029].

   o [RFC8533] "A YANG Data Model for Retrieval Methods for the
   Management of OAM Protocols that Use Connectionless Communications":
   provides a YANG data model that can be used to retrieve information
   related to OAM protocols such as BFD (Bidirectional Forwarding
   Detection) [RFC5880], ICMP Ping [RFC792] [RFC4443], and LSP Ping
   [RFC8029].

   These OAM related YANG data models at the device level defined
   parameters required for each of the different tests that are used in
   network elements today.  This work aims to reuse and build upon
   existing YANG models for OAM technologies, such as those defined in
   [RFC8531], [RFC8532], and [RFC8533].  By leveraging these
   foundational models, this document specifies two Network Models
   [RFC8969] for scheduling and coordinating sequences of OAM tests,
   enabling more advanced and automated network diagnosis procedures.
   In addition to reusing the device-level OAM YANG models from
   [RFC8531], [RFC8532], and [RFC8533], this document builds upon the
   generic scheduling framework defined in [RFC9922].  The ietf-schedule
   module provides reusable groupings and mechanisms for specifying
   periods of time, recurrence rules, and scheduling status.  These
   constructs are directly imported and used in the OAM unitary test and
   OAM sequence test models defined in this document, enabling precise
   scheduling, repetition, and conflict reporting for OAM tasks in a
   network-wide context.

1.1.  Terminology and Notations

   This document assumes that the reader is familiar with the contents
   of [RFC7950] "The YANG 1.1 Data Modeling Language".

   Following terms are used for the representation of this data model:

Contreras, et al.         Expires 16 April 2027                 [Page 5]
Internet-Draft             Scheduling OAM YANG              October 2026

   o OAM Unitary Test: A single scheduled OAM diagnostic procedure.  At
   each scheduled occurrence, every network element listed in the ne-
   config list is configured and executed as part of that one procedure
   under one schedule and one unitary-test-status state machine.  When
   the procedure spans multiple network elements, each ne-config entry
   MUST use the same test-type identity (for example, TWAMP on each
   node), while the mounted configuration under root MAY differ per node
   (for example, TWAMP session-sender on one node and session-reflector
   on another).  Multiple measurement sessions on the same node (for
   example, two entries in a mounted TWAMP test-session list) are
   device-model configuration for that node, not separate unitary tests.

   o OAM sequence test: An ordered collection of OAM unitary test steps
   that share one schedule on the sequence.  At each scheduled
   occurrence, the steps are usually executed in user-specified order
   (ordered-by user).  Each step reuses the unitary-test template
   (including its own ne-config list) and MAY use a different test-type
   from other steps, on the same or on different network elements.  Use
   a sequence when diagnosis requires multiple distinct OAM procedures
   in a defined order (for example, a connectivity check followed by
   TWAMP, or tests using different OAM technologies).

   Tree diagrams used in this document follow the notation defined in
   [RFC8340].

   This document adopts the OAM characterization defined in [RFC10014]:

   o Active OAM – uses dedicated OAM packets to assess network
   performance or verify continuity.

   o Passive OAM – observes existing data traffic without injecting OAM
   packets.

   o Hybrid OAM – combines active and passive methods.

   The use of the terms in-band and out-of-band is avoided in this
   document, consistent with [RFC10014].

1.2.  Requirements Language

   The key words "MUST", "MUST NOT", "REQUIRED", "SHALL", "SHALL NOT",
   "SHOULD", "SHOULD NOT", "RECOMMENDED", "NOT RECOMMENDED", "MAY", and
   "OPTIONAL" in this document are to be interpreted as described in
   [RFC2119], [RFC8174] when, and only when, they appear in all
   capitals, as shown here.

Contreras, et al.         Expires 16 April 2027                 [Page 6]
Internet-Draft             Scheduling OAM YANG              October 2026

1.3.  Prefix in Data Node Names

   In this document, names of data nodes and other data model objects
   will be prefixed using the standard prefix associated with the
   corresponding YANG imported modules, as shown in the following table.

              +========+========================+===========+
              | Prefix | Yang Module            | Reference |
              +========+========================+===========+
              | oamut  | ietf-oam-unitary-test  | RFCXXXX   |
              +--------+------------------------+-----------+
              | oamts  | ietf-oam-sequence-test | RFCXXXX   |
              +--------+------------------------+-----------+
              | yang   | ietf-yang-types        | [RFC6991] |
              +--------+------------------------+-----------+

                  Table 1: Prefixes and Corresponding YANG
                                  Modules

      RFC Editor Note: Please replace XXXX with the RFC number assigned
      to this document if the document becomes a RFC.  Please remove
      this note in that case.

2.  Sample OAM Test Scheduling Network Model Usage

   A service provider network's management operations can be automated
   using a variety of means such as interfaces based on YANG modules
   [RFC8969] [RFC6241] [RFC8040].  From that standpoint, and considering
   the architecture depicted in Figure 1, The goal of this document is
   to provide a mechanism to via a YANG-based northbound interface using
   ietf-oam-unitary-test and ietf-oam-sequence-test, manage the
   lifecycle of network diagnosis procedure from the network controller
   to network elements with a focus on scheduling Network Diagnosis.  In
   addition, both the service orchestrator and the network controller
   can use schema mount mechanism [RFC8528] to retrieve ietf-yang-
   library data from the underlying network element and instantiate
   specific device-level OAM modules the network element supports under
   the designated data node (labeled as a mount-point) through YANG
   based interface or device CLI, a local script.  If multiple identical
   devices are being managed, the network controller can reference a
   shared schema entry configured in its own/schema-mounts state data to
   mount the same model structure across all those network element
   locations.  For more details on how schema mount works please refer
   to [RFC8528].

Contreras, et al.         Expires 16 April 2027                 [Page 7]
Internet-Draft             Scheduling OAM YANG              October 2026

                                 +-----------------+
                                 |     Customer    |
                                 +--------+--------+
                 Customer Service Models  |
                    (e.g., L3SM, L2SM)    |
                                 +--------+--------+
                                 |    Service      |
                                 |  Orchestration  |
                                 +------+---+------+
                     Network Models     |   | OAM Test Scheduling
                   (e.g., L3NM, L2NM)   |   | Network Model
                                        |   | e.g.,ietf-oam-unitary-test
                                 +------+---+------+
                                 |     Network     |
                                 |   Controller    |
                                 +--------+--------+
                                          | Device OAM Model
                                          | (e.g., BFD, Connection
                                          | -oriented OAM)
                    +---------------------+---------------------+
                    |                  Network                  |
                    +-------------------------------------------+

            Figure 1: OAM Test Scheduling Network Model Usage

3.  Network-wide OAM Use Cases

   This document covers how to use OAM for network-wide use cases.
   These use cases rely primarily on active or hybrid OAM methods,
   depending on whether dedicated test packets or augmented data packets
   are used, following [RFC10014].

   The following illustrative examples are provided.

3.1.  Troubleshooting

   After the detection of a problem [RFC9940] in the network, OAM tests
   are performed to find the root cause for the detected problem.
   However, a detected problem can be caused by a variety of factors,
   such as a misconfiguration, hardware failure, or a software bug.  OAM
   tests can help identify likely root causes by testing specific
   components of the network and looking for anomalies or issues.  Also,
   the reliability and efficiency of the tests depend on the nature of
   the test itself.

   There are a variety of OAM tests that can be executed as a function
   of the target scenario.  For example, if the issue is related to a
   Layer 2 capability, specific tests can be designed and run to check

Contreras, et al.         Expires 16 April 2027                 [Page 8]
Internet-Draft             Scheduling OAM YANG              October 2026

   the status of the path via Ethernet Linktrace and later run an
   Ethernet Loopback to a concrete network element.  These tests can be
   coupled with others to test if any filtering is in place by varying,
   e.g., some Layer 2 fields or checking the configuration of relevant
   nodes.  If these tests are correct, the operator may want to check
   the availability of the service (or its delivered performance).

   Even though the troubleshooting process may be different depending on
   the problem detected, there are certain common procedures or logics
   that can be executed in order to narrow down the cause of the problem
   and thus help locate candidate root cause.

3.2.  Birth Certificate

   The aim of a birth certificate process is to validate that all
   relevant parameters are set appropriately in accordance with the
   target network service.  The birth certificate process is done once
   the configuration of the network elements is completed, and they are
   ready for service.

   If the birth certificate is successful, it means that the network
   service is functioning correctly (that is, measured service is
   matching the expected service) and meets the requirements defined by
   the operator.  The process requires running a set of OAM tasks (e.g.,
   tests) to verify that the service is performing as expected.

   The set of OAM tests conducted as part of a birth certificate process
   depends on the network service that is tested.  For example, if the
   service is a Virtual Private Network (VPN), Two-Way Active
   Measurement Protocol (TWAMP) Light [RFC5357] will be used, while if
   the service is an E-LINE, ITU-T Y.1731 Ethernet PM tests
   [ITU-T-Y1731] will be executed.

   Typically, once the birth certificate process has been completed and
   the OAM tests have been executed, the test results are stored as part
   of the documentation process performed by the operator.  Many of
   these tasks take place during pre-deployment phases.

3.3.  Proactive Supervision

   Some network services require fulfillment of strict Service Level
   Agreements (SLAs).  An SLA defines the performance parameters that
   the service must fulfill in order to meet the requirements of the
   customer or end user (e.g., IP Connectivity Provisioning Profile
   (CPP) [RFC7297] and Network Slice Service [RFC9543]).

Contreras, et al.         Expires 16 April 2027                 [Page 9]
Internet-Draft             Scheduling OAM YANG              October 2026

   As part of service fulfillment and assurance (e.g., Section 2.3.3 of
   [RFC4176]), proactive verification is undertaken to assess whether
   SLAs are met and implement appropriate adjustment measures when
   service distortion is observed.  Proactive supervision requires
   running tests not only end-to-end, but also on service components to
   identify early symptoms and resolve issues before they impact the
   customer or end user.  This help prevent or minimize the impact of
   the end user.  Mitigation action may be enforced to alleviate the
   impact of networks incidents and nullify the impact on services that
   are delivered via that network.

   Proactive testing might be done via OAM tests.  These tests can be
   run periodically at regular intervals depending on the specific SLA
   requirements and the network operator procedures.  These procedures
   may require documenting the test results for future auditing
   processes with the customers (eventually, negotiated and agreed with
   a customer as part of service assurance).

3.4.  Performance-based Traffic Engineering and Routing

   Path Computation Elements (PCEs) are used to compute end-to-end paths
   in a network [RFC4655].  PCEs are used for Traffic Engineering (TE)
   purposes (e.g., optimize network performance, reduce congestion, and
   improve the overall user experience).

   There are different algorithms to calculate a path in the network for
   some of them the PCE requires traffic engineering information.  TE
   information includes data such as link metrics, bandwidth
   availability, and routing constraints.  By using this information,
   the PCE can compute the optimal path for a particular service
   [RFC8233], taking into account its constraints and requirements.  In
   addition to TE Metric Extensions in OSPF [RFC7471] or IS-IS
   [RFC7810], OAM techniques also allow obtaining link metrics like
   delay and loss which can be used in the PCE algorithms.

4.  Modelling the Scheduling of OAM Tests

   This document specifies two models: OAM Unitary Test and OAM sequence
   test models.

4.1.  Relationship Between OAM Unitary Test and OAM Sequence Test

   An OAM unitary test models one logical diagnosis action at one point
   in time (or on each recurrence of that schedule).  All ne-config
   entries under the same oam-unitary-test list instance cooperate
   toward that action—for example, configuring the TWAMP sender and
   reflector for one measurement campaign.  The orchestrator still
   applies one schedule and tracks one unitary-test-status for the whole

Contreras, et al.         Expires 16 April 2027                [Page 10]
Internet-Draft             Scheduling OAM YANG              October 2026

   instance.

   An OAM sequence test chains several such actions.  Each unitary-test
   list entry under oam-sequence-test is a step with its own ne-config
   list and MAY select a different test-type than other steps.  The
   sequence shares the schedule on the parent sequence-test and advances
   through steps in list order; sequence-test-status reflects progress
   across the chain.  If two procedures do not need ordering or the same
   scheduling, they SHOULD be modeled as separate unitary tests rather
   than as steps in a sequence.

4.2.  OAM Unitary Test

   The OAM unitary test model encompasses parameters that define a
   specific type of OAM test to be performed.  The YANG model includes a
   container named "oam-unitary-tests" that serves as a container for
   activating OAM unitary tests for network diagnosis procedures.
   Within the container, there is a list called "oam-unitary-test"
   representing a list of specific OAM unitary tests.  The list key is
   defined as "name", which provides a unique name for each test.  Each
   OAM test in the list contains a "ne-config" list with "ne-id" as list
   key and references a test type with its concrete parameters.  The
   test type indicates which OAM test YANG module is mounted at the
   "root" mount point for that "ne-config" list entry.  All ne-config
   entries under the same oam-unitary-test MUST share the same test-
   type; per-node differences are expressed only in the mounted data
   under root (see Appendix A.1).

   In addition, each OAM unitary test has two temporal parameters:
   "period" container and "recurrence" container.  Both import groupings
   from the "ietf-schedule" module from [RFC9922]. "period" container
   identifies the one shot period values that contain a precise period
   of time and can be used to support on-demand troubleshooting, while
   "recurrence" container identifies the properties that contain a
   recurrence rule specification and can be used to periodic
   troubleshooting.  To support on-demand troubleshooting and periodical
   troubleshooting, this document relies on standard data store
   configuration writes (like NETCONF edit-config or RESTCONF POST/PUT)
   rather than creating a custom RPC, while reading state via NETCONF
   get operations [RFC6241] or subscription to YANG notifications to
   dynamically stream the unitary-test-status [RFC8639], [RFC8641].
   Moreover, "schedule:schedule-status" grouping has been imported from
   [RFC9922] to describe common properties of scheduling status.  Wrap-
   around of the "counter" and "failure-counter" leaves is as specified
   in [RFC9922]. "unitary-test-status" leaf indicates the state of the
   OAM unitary test (see the state machine in Figure 3).

Contreras, et al.         Expires 16 April 2027                [Page 11]
Internet-Draft             Scheduling OAM YANG              October 2026

   Each oam-unitary-test instance defined by this model is conceptually
   an instance of an active or hybrid OAM operation, since it triggers
   the generation or coordination of OAM packets.  The YANG model allows
   such differentiation by referencing the underlying test type
   identity.

   Figure 2 shows the structure of OAM Unitary Test module:

Contreras, et al.         Expires 16 April 2027                [Page 12]
Internet-Draft             Scheduling OAM YANG              October 2026

    module: ietf-oam-unitary-test
      +--rw oam-unitary-tests
         +--rw oam-unitary-test* [name]
            +--rw name                      string
            +--rw ne-config* [ne-id]
            |  +--rw ne-id        union
            |  +--rw managed?     boolean
            |  +--rw test-type?   identityref
            |  +--rw root
            +--rw state?                    identityref
            +--rw version?                  uint16
            +--rw schedule-type?            identityref
            +--ro local-time?               yang:date-and-time
            +--ro last-update?              yang:date-and-time
            +--ro counter?                  yang:counter32
            +--ro last-occurrence?          yang:date-and-time
            +--ro upcoming-occurrence?      yang:date-and-time
            +--ro last-failed-occurrence?   yang:date-and-time
            +--ro failure-counter?          yang:counter32
            +--ro unitary-test-status?      identityref
            +--rw (schedule-class)?
               +--:(period)
               |  +--rw period
               |     +--rw period-description?     string
               |     +--rw period-start?           yang:date-and-time
               |     +--rw time-zone-identifier?   sys:timezone-name
               |     +--rw (period-type)?
               |        +--:(explicit)
               |        |  +--rw period-end?       yang:date-and-time
               |        +--:(duration)
               |           +--rw duration?         duration
               +--:(recurrence)
                  +--rw recurrence
                     +--rw recurrence-first
                     |  +--rw start-time-utc?   yang:date-and-time
                     |  +--rw duration?         uint32
                     +--rw (recurrence-end)?
                     |  +--:(until)
                     |  |  +--rw utc-until?          yang:date-and-time
                     |  +--:(count)
                     |     +--rw count?              uint32
                     +--rw recurrence-description?   string
                     +--rw frequency?                identityref
                     +--rw interval?                 uint32

                Figure 2: Tree Structure of OAM Unitary Test

Contreras, et al.         Expires 16 April 2027                [Page 13]
Internet-Draft             Scheduling OAM YANG              October 2026

4.2.1.  Unitary Test Status State Machine

   The 'unitary-test-status' state machine is shown in Figure 3.  The
   state machine includes the following states:

   *  "planned": The initial state where the test is planned by the
      management and hasn't been applied to any network element.

   *  "configured": The state where the test is being configured.  This
      state is triggered when the planned test configuration is applied
      to one or more network element(s).

   *  "ready": The state where the test is ready to be executed.  This
      state is triggered after the planned test configuration is applied
      and before the test is executed.

   *  "on-going": The state where the test is currently running.  This
      state is triggered when the test has been executed but the test
      results haven't been produced.

   *  "error": The state where an error occurs during the test.  This
      state is triggered when the test has not been conducted
      successfully.  Implementations may report a more specific error
      cause using child identities such as "resource-contention" or
      "priority-conflict".

   *  "stop": The state where the test is manually stopped.  This state
      is triggered when the test is manually interrupted, using
      mechanisms which are outside the scope of this document.  A manual
      stop is not a successful completion and is not an execution error;
      the next cycle, if any, starts from "planned".

   *  "success": The final state where the test is completed.  This
      state is triggered when the test has been conducted successfully.

   Note that how state transition triggering generation of YANG
   notifications and how external management and orchestration systems
   subscribe to these YANG notifications are not in the scope of this
   document.

Contreras, et al.         Expires 16 April 2027                [Page 14]
Internet-Draft             Scheduling OAM YANG              October 2026

               +---------+      +----------+      +---------+
            +->| planned |----->|configured|----->|  ready  |
            |  +---------+      +----------+      +---------+
            |    A   A   A              |              |
            |    |   |   |              |              V
            |    |   |   |  +-------+   |          +----------+
            |    |   |   ---| error |<--+----------| on-going |
            |    |   |      +-------+              +----------+
            |    |   |                                 |
            |    |   |          +--------+             |
            |    |   +----------|  stop  |<------------+
            |    |              +--------+             |
            |    |                                     |
            | +---------+                              |
            +-| success |<-----------------------------+
              +---------+

                  Figure 3: OAM Unitary Test State Machine

4.3.  OAM Sequence Test

   The OAM sequence test model consists of a collection of OAM unitary
   test steps that are executed based on specified time constraints,
   repetitions, ordering, and reporting outputs.  These sequences
   provide a structured approach to running multiple OAM procedures in a
   coordinated manner, including cases where successive steps use
   different test-type values or target different network elements.
   Note that each test sequence is local sequence configuration; any
   later changes to the configured unitary test template in the ietf-
   oam-unitary-test should not silently change an already configured
   sequence.

Contreras, et al.         Expires 16 April 2027                [Page 15]
Internet-Draft             Scheduling OAM YANG              October 2026

   Each OAM unitary test in Each OAM test sequence references an OAM
   unitary test type with its concrete parameters to indicate which OAM
   Test YANG module, is mounted at the "root" mount point for that "ne-
   config" list entry.  Each OAM test sequence has two temporal
   parameters related to time constraints: "period" container and
   "recurrence" container and one constraint related to ordering:
   "ordered-by user".  Time constraints parameters are imported from the
   "ietf-schedule" module from [RFC9922]. "period" identifies the one
   shot period values that contain a precise period of time and can be
   used to support on demand troubleshooting, while "recurrence"
   identifies the properties that contain a recurrence rule
   specification and can be used to support periodical troubleshooting.
   Note that the "recurrence" is only intended to expose current and
   latest summary state, per occurrence result history is outside the
   scope of this document.  Future extension can choose to define
   notifications or other result model to report per occurence result
   history.

   To support on-demand troubleshooting and periodical troubleshooting,
   this document relies on standard data store configuration writes
   (like NETCONF edit-config or RESTCONF POST/PUT) rather than creating
   a custom RPC, while reading state via NETCONF get operations
   [RFC6241] or subscription to YANG notifications to dynamically stream
   the sequence-test-status [RFC8639], [RFC8641].  Moreover, "ordered-by
   user" YANG statement indicates that the user is responsible for the
   ordering on a collection of OAM unitary tests. "sequence-test-status"
   shows the state of the OAM test sequence. "state" imported from the
   "ietf-schedule" module indicates the current state of the schedule.

   Note that repetition is specified by "count" parameter and only
   applies to the recurrence schedule type.  If no count is indicated,
   the test is considered to run indefinitely.  In case of the
   recurrence schedule type, both frequency and interval should be
   specified.  Each execution runs at the scheduled recurrence interval.
   Since the OAM sequence test model consists of a collection of OAM
   unitary tests, one or more tests on one or multiple ne nodes in the
   sequence might get an error, however error in one or more tests
   doesn't prevent the subsequent tests or remaining tests on the same
   ne nodes or on various different ne nodes to execute.  In addition,
   any change to the ordering of the OAM sequence test will lead to
   different reporting output results therefore the user should have
   full control on the ordering and "ordered-by user" YANG statement
   needs to be specified. "ordered-by user" YANG statement indicates
   that the user is responsible for the ordering on a collection of OAM
   unitary tests.  If two or more tests are to run concurrently, they
   MUST be run in the order specified by the user.

   Figure 4 shows the structure of OAM sequence test module:

Contreras, et al.         Expires 16 April 2027                [Page 16]
Internet-Draft             Scheduling OAM YANG              October 2026

    module: ietf-oam-sequence-test
      +--rw oam-sequence-test
         +--rw sequence-test* [name]
            +--rw name                      string
            +--rw unitary-test* [name]
            |  +--rw name         string
            |  +--rw ne-config* [ne-id]
            |     +--rw ne-id        union
            |     +--rw managed?     boolean
            |     +--rw test-type?   identityref
            |     +--rw root
            +--rw state?                    identityref
            +--rw version?                  uint16
            +--rw schedule-type?            identityref
            +--ro local-time?               yang:date-and-time
            +--ro last-update?              yang:date-and-time
            +--ro counter?                  yang:counter32
            +--ro last-occurrence?          yang:date-and-time
            +--ro upcoming-occurrence?      yang:date-and-time
            +--ro last-failed-occurrence?   yang:date-and-time
            +--ro failure-counter?          yang:counter32
            +--ro sequence-test-status?     identityref
            +--rw (schedule-class)?
               +--:(period)
               |  +--rw period
               |     +--rw period-description?     string
               |     +--rw period-start?           yang:date-and-time
               |     +--rw time-zone-identifier?   sys:timezone-name
               |     +--rw (period-type)?
               |        +--:(explicit)
               |        |  +--rw period-end?       yang:date-and-time
               |        +--:(duration)
               |           +--rw duration?         duration
               +--:(recurrence)
                  +--rw recurrence
                     +--rw recurrence-first
                     |  +--rw start-time-utc?   yang:date-and-time
                     |  +--rw duration?         uint32
                     +--rw (recurrence-end)?
                     |  +--:(until)
                     |  |  +--rw utc-until?          yang:date-and-time
                     |  +--:(count)
                     |     +--rw count?              uint32
                     +--rw recurrence-description?   string
                     +--rw frequency?                identityref
                     +--rw interval?                 uint32

                        Figure 4: OAM sequence test

Contreras, et al.         Expires 16 April 2027                [Page 17]
Internet-Draft             Scheduling OAM YANG              October 2026

4.3.1.  Sequence Test Status State Machine

   The 'sequence-test-status' state machine is shown in Figure 5.  The
   state machine includes the following states:

   *  "planned": The initial state where the sequence test is planned by
      the management and hasn't been applied to any network element.

   *  "configured": The state where the sequence test is being
      configured.  This state is triggered when the planned test
      configuration is applied to one or more network element.

   *  "ready": The state where the sequence test is ready to be
      executed.  This state is triggered after the planned test
      configuration is applied and before the test is executed.

   *  "on-going": The state where the sequence test is currently
      running.  This state is triggered when the test has been executed
      but the test results haven't been produced.

   *  "error": The state where an error occurs during the sequence test.
      This state is triggered when one or more tests haven't been
      conducted successfully.  Implementations may report a more
      specific error cause using child identities such as "resource-
      contention" or "priority-conflict".

   *  "stop": The state where the sequence test is manually stopped.
      This state is triggered when the test is manually interrupted,,
      using mechanisms which are outside the scope of this document.  A
      manual stop is not a sequence failure and is not a successful
      completion; the next cycle, if any, starts from "planned".

   *  "failure": The state when error occurs for one or more unitary
      tests in the sequence test while the sequence test continues to
      execute remaining unitary tests.

   *  "success": The final state where all Unitary Tests in the sequence
      test are completed.  This state is triggered when all unitary
      tests in the sequence test have been conducted successfully.

   Note that how state transition triggering generation of YANG
   notifications and how external management and orchestration systems
   subscribe to these YANG notifications are not in the scope of this
   document.

Contreras, et al.         Expires 16 April 2027                [Page 18]
Internet-Draft             Scheduling OAM YANG              October 2026

                +---------+      +----------+      +---------+
             +->| planned |----->|configured|----->|  ready  |
             |  +---------+      +----------+      +---------+
             |    A   A   A             |              |
             |    |   |   |             |              V
             |    |   |   | +-------+   |          +----------+
             |    |   |   +-| error |<--+----------| on-going |
             |    |   |     +-------+              +----------+
             |    |   |                                |
             |    |   |         +--------+             |
             |    |   +---------|  stop  |<------------+
             |    |             +--------+             |
             |    |                                    |
             |    |         +---------+                |
             |    +---------| failure |<---------------+
             |              +---------+                |
             |                                         |
             | +---------+                             |
             +-| success |<----------------------------+
               +---------+

                 Figure 5: OAM sequence test state machine

5.  YANG Data Models for Scheduling OAM Tests

5.1.  YANG Model for Scheduling OAM Unitary Test

   This module imports typedefs from [RFC9922], [RFC8528] and [RFC9911],
   and it uses references defined in [RFC8531], [RFC8532], [RFC9617],
   [RFC8913], [RFC8029], [RFC9107].

   <CODE BEGINS>
    file ietf-oam-unitary-test@2026-09-14.yang
   module ietf-oam-unitary-test {
     yang-version 1.1;
     namespace "urn:ietf:params:xml:ns:yang:ietf-oam-unitary-test";
     prefix "oamut";

     import ietf-schedule {
       prefix schedule;
       reference
         "RFC 9922: A Common YANG Data Model for Scheduling";
     }

     import ietf-yang-schema-mount {
        prefix yangmnt;
        reference
          "RFC 8528: YANG Schema Mount";

Contreras, et al.         Expires 16 April 2027                [Page 19]
Internet-Draft             Scheduling OAM YANG              October 2026

     }

     import ietf-inet-types {
        prefix inet;
        reference
          "RFC 9911: Common YANG Data Types";
     }

     import ietf-network {
        prefix nw;
        reference
          "RFC 8345: A YANG Data Model for Network Topologies";
     }

     organization
       "IETF OPSAWG (Operations and Management Area Working Group)";

     contact
       "WG Web:   <https://datatracker.ietf.org/wg/opsawg/>
        WG List:  <mailto:opsawg@ietf.org>
        Author:   Luis Miguel Contreras Murillo
                  <luismiguel.contrerasmurillo@telefonica.com>
        Author:   Victor Lopez
                  <victor.lopez@nokia.com>
        Author:   Qin Wu
                  <bill.wu@huawei.com>";
     description
       "This module defines the 'ietf-oam-unitary-test' YANG model for
        activation of network diagnosis procedures.

       Copyright (c) 2026 IETF Trust and the persons identified as
       authors of the code.  All rights reserved.

       Redistribution and use in source and binary forms, with or
       without modification, is permitted pursuant to, and subject
       to the license terms contained in, the Revised BSD License
       set forth in Section 4.c of the IETF Trust's Legal Provisions
       Relating to IETF Documents
           (https://trustee.ietf.org/license-info).

       This version of this YANG module is part of RFC XXXX
       (https://www.rfc-editor.org/info/rfcXXXX); see the RFC itself
       for full legal notices. ";

       // RFC Ed.: update the date below with the date of RFC
       // publication and remove this note.
       // RFC Ed.: replace XXXX with actual RFC number and remove
       // this note.

Contreras, et al.         Expires 16 April 2027                [Page 20]
Internet-Draft             Scheduling OAM YANG              October 2026

     revision "2026-09-14" {
       description
         "Initial version";
       reference
         "RFCXXXX: A YANG Data Model for Network Diagnosis using
          Scheduled Sequences of OAM Tests";
          // Update with the correct RFC number when assigned
     }

     /* Identities */
     identity unitary-test-status {
              description
                "Base identity for unitary test status. Note that
             it only allows extensible error reporting such
             as resource contention, priority conflict.";
     }
            identity planned {
              base unitary-test-status;
              description
                "Identity for planned.";
     }
     identity configured {
              base unitary-test-status;
              description
                "Identity for configured.";
     }
     identity ready {
              base unitary-test-status;
              description
                "Identity for ready.";
     }
     identity on-going {
              base unitary-test-status;
              description
                "Identity for on-going.";
     }
     identity stop {
              base unitary-test-status;
              description
                "Identity for stop.";
     }
     identity success {
              base unitary-test-status;
              description
                "Identity for success.";
     }

     identity error {

Contreras, et al.         Expires 16 April 2027                [Page 21]
Internet-Draft             Scheduling OAM YANG              October 2026

              base unitary-test-status;
              description
                "Identity for error.";
     }

     identity resource-contention {
              base error;
              description
                "Identity for resource contention conflict. Resource contention
             conflict is referred to two OAM tests require exclusive access
             to the same resource at the same time.";
     }

     identity priority-conflict {
              base error;
              description
                "Identity for priority based conflict. The prioritization-related
             conflict occurs when a higher-priority OAM test preempts, defers,
             or cancels a lower-priority OAM test because they are competing
            for the exact same network execution resources at the same time.";
     }

     identity test-type {
          description
            "Base identity of the test type.";
     }
     identity connection-oriented-oam {
          base test-type;
          description
            "Base identity of connection oriented oam test type.";
          reference
            "RFC 8531: Generic YANG Data Model for Connection-Oriented
                       Operations, Administration, and Maintenance (OAM)
                       Protocols";
     }
     identity connectionless-oam {
          base test-type;
          description
            "Base identity of connectionless oam test type.";
          reference
            "RFC 8532: Generic YANG Data Model for the Management of
                       Operations, Administration, and Maintenance (OAM)
                       Protocols That Use Connectionless
                       Communications";
     }
     identity in-situ-oam {
          base test-type;
          description

Contreras, et al.         Expires 16 April 2027                [Page 22]
Internet-Draft             Scheduling OAM YANG              October 2026

            "Base identity of In Situ OAM test type.";
          reference
           "RFC 9617: A YANG Data Model for In Situ Operations,
                      Administration, and Maintenance (IOAM)";
     }
     identity twamp {
          base test-type;
          description
            "Base identity of TWAMP test type.";
          reference
            "RFC 8913: Two-Way Active Measurement Protocol
                     (TWAMP) YANG Data Model";
     }
     identity ip-ping {
          base connectionless-oam;
          description
            "Base identity of IP Ping test type.";
          reference
           "RFC 792: nternet Control Message Protocol";
     }
     identity lsp-ping {
          base connection-oriented-oam;
          description
            "Base identity of MPLS LSP Ping test type.";
          reference
           "RFC 8029: Detecting Multiprotocol Label Switched (MPLS) Data-Plane Failures";
     }
     identity srmpls-ping {
          base connection-oriented-oam;
          description
            "Base identity of SR MPLS Ping test type.";
          reference
           "RFC 9716: Mechanisms for MPLS Ping and Traceroute Procedures in Inter-Domain Segment Routing Networks";
     }
     identity bfd {
          base test-type;
          description
            "Base identity of BFD test type.";
          reference
           "RFC 9107: YANG Data Model for Bidirectional Forwarding
            Detection (BFD)";
     }
     grouping oam-unitary-test {
       description
          "Specifies a grouping for OAM unitary test for network
           diagnosis procedures.

          This grouping has been defined to allow being imported and

Contreras, et al.         Expires 16 April 2027                [Page 23]
Internet-Draft             Scheduling OAM YANG              October 2026

           reused by other YANG modules.";

           leaf name {
         type string;
           description
             "Defines the name of the test.";
        }
       list ne-config {
         key ne-id;
         description "List of node configurations required to enable the
           unitary tests.";

         leaf ne-id {
           type union {
             type inet:host;
             type nw:node-id;
           }
           description
             "This is identification of a network node within an
                      autonomous system such as router, switch, firewalls, etc.
                      It should be as fine-grained as possible to both guide
                      the operator and guarantee uniqueness of the network
                      element.";
         }

          leaf managed {
            type boolean;
            default "true";
            description
              "True if the host can access oam unitary test
               using the root mount point.  This value
               may not be modifiable in all implementations.";
          }
         leaf test-type {
              type identityref {
                base test-type;
              }
              description
                "Choose the type of test. Note that for the
                 same unitary test, if the test is conducted
                 on multiple ne node, the test type should be
                 same, but test configuration on each ne node
                 might be different.";
            }
          container root {
            description
              "Container for mount point.";
            yangmnt:mount-point "root" {

Contreras, et al.         Expires 16 April 2027                [Page 24]
Internet-Draft             Scheduling OAM YANG              October 2026

              description
                "Root for models supported per oam unitary test.
                         This mount point may or may not be inline based on
                 the server implementation.

                 When the associated 'managed' leaf is 'false', any
                 operation that attempts to access information below
                 the root should fail with an error-tag of
                 'access-denied' and an error-app-tag of
                 'oamut-not-managed'.";
            }
          }
       }
     }

     container oam-unitary-tests {
       description
         "Container for OAM unitary tests activation for network
         diagnosis procedures.";
       list oam-unitary-test {
         key name;
         description
           "List of OAM unitary tests activation for network diagnosis
           procedures.";
         uses oam-unitary-test;
         uses schedule:schedule-status;
         leaf unitary-test-status {
               type identityref {
                     base unitary-test-status;
               }
                   config false;
           description
             "Status of the test.";
         }
     choice schedule-class {
        description
              "Choice based on the type of the time range.";
      container period {
            description
              "The OAM Test takes effect based on a precise period of
                   time.";
              uses schedule:period-of-time;
      }
      container recurrence {
            description
              "The OAM test takes effect based on a recurrence rule.";
            uses schedule:recurrence-utc;
       }

Contreras, et al.         Expires 16 April 2027                [Page 25]
Internet-Draft             Scheduling OAM YANG              October 2026

      }
     }
    }
   }
   <CODE ENDS>

5.2.  YANG Model for OAM Sequence Test

   This module imports typedefs from [RFC9922].  For the model design
   overview, please refer to Section 4.3.

   <CODE BEGINS>
    file ietf-oam-test-sequence@2026-09-14.yang

   module ietf-oam-sequence-test {
     yang-version 1.1;
     namespace "urn:ietf:params:xml:ns:yang:ietf-oam-sequence-test";
     prefix "oamts";

     import ietf-oam-unitary-test {
       prefix "oamut";
       reference
         "RFC XXXX: A YANG Data Model for Network Diagnosis using
          Scheduled Sequences of OAM Tests";
     }

     import ietf-schedule {
       prefix "schedule";
       reference
         "RFC 9922: A Common YANG Data Model for Scheduling";
     }

     organization
       "IETF OPSAWG (Operations and Management Area Working Group)";

     contact
       "WG Web:   <https://datatracker.ietf.org/wg/opsawg/>
        WG List:  <mailto:opsawg@ietf.org>
        Author:   Luis Miguel Contreras Murillo
                  <luismiguel.contrerasmurillo@telefonica.com>
        Author:   Victor Lopez
                 <victor.lopez@nokia.com>
            Author:   Qin Wu
                     <bill.wu@huawei.com>";
     description
       "This module defines the 'ietf-oam-sequence-test' YANG model for
       management of network diagnosis procedures.

Contreras, et al.         Expires 16 April 2027                [Page 26]
Internet-Draft             Scheduling OAM YANG              October 2026

       Copyright (c) 2026 IETF Trust and the persons identified as
       authors of the code.  All rights reserved.

       Redistribution and use in source and binary forms, with or
       without modification, is permitted pursuant to, and subject
       to the license terms contained in, the Revised BSD License
       set forth in Section 4.c of the IETF Trust's Legal Provisions
       Relating to IETF Documents
         (https://trustee.ietf.org/license-info).

        This version of this YANG module is part of RFC XXXX
        (https://www.rfc-editor.org/info/rfcXXXX); see the RFC itself
        for full legal notices.";

       // RFC Ed.: update the date below with the date of RFC
       // publication and remove this note.
       // RFC Ed.: replace XXXX with actual RFC number and remove
       // this note.

     revision "2026-09-14" {
       description "Initial version";
       reference "RFCXXXX";
     }

     /* Identities */
            identity sequence-test-status {
              description
                "Base identity for sequence-test-status.";
            }
            identity planned {
              base sequence-test-status;
              description
               "Identity for planned.";
            }
            identity configured {
              base sequence-test-status;
              description
               "Identity for configured.";
            }
            identity ready {
              base sequence-test-status;
              description
               "Identity for ready.";
            }
            identity on-going {
              base sequence-test-status;
              description
                "Identity for on-going.";

Contreras, et al.         Expires 16 April 2027                [Page 27]
Internet-Draft             Scheduling OAM YANG              October 2026

            }
            identity stop {
              base sequence-test-status;
              description
               "Identity for stop.";
            }
            identity success {
              base sequence-test-status;
              description
               "Identity for success.";
            }
            identity failure {
              base sequence-test-status;
              description
               "Identity for failure";
            }
            identity error {
              base sequence-test-status;
              description
               "Identity for error.";
            }
            identity resource-contention {
              base error;
              description
               "Identity for resource-contention error cause.";
            }
            identity priority {
              base error;
              description
               "Identity for priority error cause.";
            }

     /* Data model definition */
     container oam-sequence-tests {
       description
         "Container for executing a sequence of ietf-oam-unitary-tests
         N times.";

       list oam-sequence-test {
         key "name";
         description "List of test sequences. note that each test sequence is
                      local sequence configuration, any later changes to the
                      configured unitary test template in the
                      ietf-oam-unitary-test should not silently change an
                      already configured sequence.";

         leaf name {
           type string;

Contreras, et al.         Expires 16 April 2027                [Page 28]
Internet-Draft             Scheduling OAM YANG              October 2026

           description "Unique name for the sequence test.";
         }

        list unitary-test {
               key "name";
           description "Reuses the ietf-oam-unitary-tests template
                        for each unitary test in the test seqence.
                        it support both ordered-by user and
                        ordered-by system.";
           uses "oamut:oam-unitary-test";
         }
        uses schedule:schedule-status;
            leaf sequence-test-status {
              type identityref {
                    base sequence-test-status;
              }
              config false;
              description
                    "Status of the sequence test execution.";
            }
     choice schedule-class {
        description
             "Choice based on the type of the time range.";
      container period {
            description
              "The OAM Test takes effect based on a precise
              period of time.";
              uses schedule:period-of-time;
      }
      container recurrence {
            description
              "The OAM test takes effect based on a recurrence rule.";
            uses schedule:recurrence-utc;
         }
        }
       }
     }
   }
   <CODE ENDS>

6.  Using Device Model Within OAM Scheduling Models

   This section discusses the issues related to reusing device models
   already defined in IETF within the context of scheduling OAM tests.
   There are two main approaches to enable OAM scheduling models:

Contreras, et al.         Expires 16 April 2027                [Page 29]
Internet-Draft             Scheduling OAM YANG              October 2026

   *  Importing YANG model into the OAM scheduling models.  This
      approach will copy the device model into the OAM unitary test
      model to enable the configuration and utilization of the desired
      OAM test.  This approach requires recreating new YANG models for
      each new test type or variation of the device models.

   *  Schema-mount allows mounting a data model at a specified location
      of another (parent) schema.  The main difference with importing
      the YANG modules is that they don't have to be prepared for
      mounting; any existing modules such as "ietf-twamp" can be mounted
      without any modifications.

   The "test-type" leaf and the schema mount are complementary.  The
   "test-type" leaf (identityref to "test-type") explicitly indicates
   which OAM test type, and thus which YANG module, is mounted at the
   "root" mount point for that "ne-config" list entry.  Each "ne-config"
   entry therefore pairs a test-type identity with the corresponding
   mounted module configuration under "root", so that management systems
   and implementations know which OAM module applies to that node.  This
   document defines the base identity "test-type" and a set of child
   identities for OAM test type; YANG modules that augment "ietf-oam-
   unitary-test" may define additional child identities derived from
   "test-type" for other OAM test types.

   As an example, we will use [RFC8913], which defines a YANG data model
   for TWAMP, to illustrate how device models could be used in
   Appendix A.1.

7.  Operational Considerations

7.1.  Conflict Resolution and Reporting Among Scheduled OAM Tasks

   When multiple OAM tasks are scheduled to run concurrently or overlap
   in time, conflicts may arise due to resource contention or
   operational constraints.  This document leverages the scheduling
   status groupings defined in the common schedule YANG module (see
   [RFC9922] A Common YANG Data Model for Scheduling]) to detect and
   report such conflicts.

   The YANG models defined in this document (both for unitary test and
   sequence test) use the unitary-test-status and sequence-test-status
   leaves to indicate the current scheduling state of each OAM task.
   These leaves are of type identityref, allowing extensible error
   reporting.  If a conflict is detected (e.g., two tests require
   exclusive access to the same resource at the same time), the server
   sets the corresponding status to error or to a more specific error-
   cause identity derived from error: resource-contention for resource
   conflicts, or priority based conflict for prioritization-related

Contreras, et al.         Expires 16 April 2027                [Page 30]
Internet-Draft             Scheduling OAM YANG              October 2026

   conflicts Section 4.2, Section 4.3.  This error-cause indication
   allows operators and management systems to distinguish the reasons
   for the failure.  Note that it is intention to allow extensibility
   for the error codes rather than extend states in the state machine.

   Operators and management systems SHOULD monitor the scheduling status
   of OAM tasks and take appropriate action if a conflict is reported.
   To support deterministic operations across heterogeneous multi-vendor
   environments, implementations SHOULD perform a commit-time validation
   on multi-node configuration, e.g., if a scheduling conflict (e.g.,
   the number of schedule conflict exceeds the specific threshold) or
   resource over-allocation is detectable a priori, the configuration
   commit SHOULD be rejected by the server rather than accepted for
   delayed resolution.  Another example is when manually running OAM
   test is colliding with previously scheduled OAM tests, we need to
   make sure to check the existence of schedule tests before running
   manual OAM testing.  In both examples, the conflict MUST be clearly
   reported via the YANG model status leaves.

   If a conflict cannot be caught a priori or occurs dynamically during
   runtime execution, the server resolves the resource friction using a
   well-defined precedence model.  OAM task categories are prioritized
   according to the following operational hierarchy:

   *  On-Demand Troubleshooting: Manually triggered diagnostics designed
      to pinpoint live issues MUST take absolute precedence, overriding
      and preempting any scheduled or proactive monitoring sequences.

   *  Birth-Certificate/Verification Tests: Initial service activation
      verification sequences take secondary precedence, superseding
      background tasks but yielding to active troubleshooting if system
      resources are exhausted.

   *  Proactive SLA Supervision: Routine, recurring performance
      verification tests operate under lowest relative priority and may
      be systematically deferred, rescheduled, or canceled when high-
      priority tasks claim the required execution resources.

   When an active test or upcoming schedule is modified or aborted by a
   higher-priority operation, the server must update the corresponding
   unitary-test-status or sequence-test-status leaf.  It must also log
   the preempted event alongside an error notification to ensure
   observability across the network management layer.  In addition, the
   preemption applies only to the OAM sessions being setup using the
   YANG data models defined in this document, while other OAM sessions
   being running on the devices through other mechanims should not be
   preempted (e.g., through CLI or by configuring the device YANG data
   model directly) to avoid operaetional impact on other OAM sessions.

Contreras, et al.         Expires 16 April 2027                [Page 31]
Internet-Draft             Scheduling OAM YANG              October 2026

7.2.  Coverage of Input Parameters and Output Results

   The YANG models defined in this document are designed to schedule OAM
   tests at a network-wide level.  The input parameters required to
   configure and execute specific OAM functions (such as test type,
   target, and configuration options) are referenced or reused from the
   existing device-level OAM YANG models (e.g., [RFC8531], [RFC8532],
   [RFC8533], [RFC8913]).  This approach avoids duplication and ensures
   consistency with established models.

   Similarly, the output results of OAM tests such as test status,
   performance metrics, and diagnostic information,are expected to be
   reported using the mechanisms and data nodes defined in those
   foundational YANG modules.  The scheduling models in this document
   provide references to these output results and enable their
   collection and correlation across multiple tests and devices, but do
   not redefine the detailed input/output parameters of each OAM
   function.

   In summary, this document focuses on the scheduling, coordination,
   and status tracking of OAM tests, while relying on existing YANG
   models for the detailed specification of test parameters and results.

7.3.  Use of the Managed Leaf

   The "managed" leaf in each "ne-config" entry defaults to "true",
   meaning that the orchestrator or controller hosting this model is
   expected to configure the device OAM function through the "root"
   schema-mount point.  The orchestrator or controller can rely on the
   YANG Library (RFC 8525) to discover which structural OAM modules are
   supported by a network element before scheduling tests.  This
   capability discovery allows the orchestrator or controller to
   determine supported standard schemas, such as TWAMP or ICMP, and
   works in conjunction with YANG Schema Mount (RFC 8528) to dynamically
   mount native OAM modules into the scheduling framework.

   Operators set "managed" to "false" when the OAM function on that
   network element is configured outside this model, for example by a
   device CLI, a local script, or a different controller.  In that case,
   any attempt to access data below "root" fails with error-tag "access-
   denied" and error-app-tag "oamut-not-managed", as specified in the
   YANG module.

Contreras, et al.         Expires 16 April 2027                [Page 32]
Internet-Draft             Scheduling OAM YANG              October 2026

   Scheduling of the unitary test or sequence test still applies when
   "managed" is "false": time constraints and status reporting remain in
   this model, but the device-level OAM configuration is not pushed
   through the mount point to support smooth migration.  Implementations
   that cannot disable mount access may keep "managed" as a read-only
   value of "true".

7.4.  Performance impact and Operational Guidance for concurrent OAM
      task scheduling

   Concurrent OAM task scheduling introduces significant resource strain
   across managed devices.  Management and orchestration systems need to
   make sure to have sufficient resource before conducting those
   multiple concurrent OAM tasks.  To plan capacity at scale and
   safeguard network stability, implementations SHOULD adhere to the
   following operational boundaries:

   *  Concurrency Limits: Devices SHOULD enforce limits on concurrent
      active tests to prevent CPU starvation.  Active traffic per
      interface MUST be bounded to a minimal fraction (e.g., <1%) of
      link capacity.  Network-wide tasks MUST be staggered using random
      jitter to avoid synchronized telemetry and processing spikes.

   *  Preemptive Control: Implementations SHOULD NOT rely solely on
      reporting resource-contention errors after a failure.  Managed
      nodes SHOULD apply local rate limiting and preemptive traffic-
      shaping.  If resource thresholds are approached, devices SHOULD
      automatically defer or back off pending tests, while prioritizing
      vital keep-alives over ad-hoc diagnostics.

   *  SLA and Windowing Considerations: High-frequency proactive
      supervision MUST use various different QoS markings to reflect
      real line-rate conditions without degrading SLAs.  Bulk
      diagnostics SHOULD run at low priority.  Routine supervision is
      suited for in-service periods, whereas intrusive OAM loopbacks
      [ITU-T-Y1731] and multi-path tracing SHOULD be restricted to
      maintenance windows, where false alarms must be suppressed.

7.5.  Impact on Security Operations

   Centrally orchestrated and scheduled OAM tests introduce specific
   traffic patterns—characterized by distinct timing, predictable
   volumes, and targeted path probing—that differ from normal network
   traffic.  Network operators MUST evaluate the impact of these
   automated patterns on security operations systems:

Contreras, et al.         Expires 16 April 2027                [Page 33]
Internet-Draft             Scheduling OAM YANG              October 2026

   *  Anomaly Detection & IDS/IPS: Automated OAM traffic may trigger
      false positives in flow-based Intrusion Detection/Prevention
      Systems (IDS/IPS) or behavioral anomaly detectors, which might
      flag rapid, scheduled path probing as network scanning.  Operators
      SHOULD configure security baseline policies to recognize
      authorized OAM orchestration boundaries or whitelist controlled
      test sources.

   *  Packet Capture & Parsing Observability: Centralized scheduling can
      significantly increase packet volume during test windows.  Network
      monitoring tools, packet capture systems, and protocol parsing
      MUST be capable of identifying, parsing, and filtering these
      scheduled OAM packets.  This ensures that synthetic test traffic
      does not overwhelm log storage, degrade packet processing
      performance, or obscure genuine malicious payloads hidden within
      traffic flows.

7.6.  Schedule Health Verification

   Operators SHOULD follow a post-configuration validation checklist to
   verify schedule health and configuration deployment. verification
   focuses on two primary phases:

   *  Schedule Acceptance Verification: Operators must inspect the root
      schedule instance to ensure it has been successfully accepted by
      the controller.  This is validated by verifying that the upcoming-
      occurrence leaf and status counters imported from the ietf-
      schedule module reflect a valid, upcoming execution timestamp
      rather than an error or inactive state.

   *  Mount Application Verification: Operators must verify that the OAM
      configuration nested under the schema mount root has been
      successfully propagated to each target network element (ne-id).
      This is achieved by querying the local state of the mounted OAM
      unitary test or sequence test modules on individual network
      elements to confirm that the configuration was applied correctly
      and the elements are primed for the upcoming schedule trigger.

7.7.  Operational Considerations for Auditing and Results Tracking

   To support the accounting and auditing requirements described in
   Section 2.2 and Section 2.3, the test results of the scheduling model
   including mounted device-level OAM Test results (e.g., TWAMP Test
   results in Appendix A.1 ) or audit nodes (i.e., ne-config list)
   should be associated with each schedule instance (e.g., 'oam-unitary-
   test' or 'oam-sequence-test' list instance) to ensure that automated
   audit tools and operators can seamlessly validate test execution,
   correlate schedules with actual performance data, and maintain a

Contreras, et al.         Expires 16 April 2027                [Page 34]
Internet-Draft             Scheduling OAM YANG              October 2026

   verifiable audit trail.

8.  Security Considerations

   This section is modeled after the template described in Section 3.7.1
   of [RFC9907].

   Both "ietf-oam-unitary-test " YANG module and "ietf-oam-sequence-
   test" YANG module define data models that are designed to be accessed
   via YANG-based management protocols, such as the Network
   Configuration Protocol (NETCONF) [RFC6241] and RESTCONF [RFC8040].
   These YANG-based management protocols (1) MUST use a secure transport
   layer (e.g., Secure Shell (SSH) [RFC4252], TLS [RFC8446], and QUIC
   [RFC9000]) and (2) MUST use mutual authentication.

   The Network Configuration Access Control Model (NACM) [RFC8341]
   provides the means to restrict access for particular NETCONF or
   RESTCONF users to a preconfigured subset of all available NETCONF or
   RESTCONF protocol operations and content.

   There are a number of data nodes defined in this YANG module that are
   writable/creatable/deletable (i.e., config true, which is the
   default).  These data nodes may be considered sensitive or vulnerable
   in some network environments.  Write operations (e.g., edit-config)
   to these data nodes without proper protection can have a negative
   effect on network operations.  The following subtrees and data nodes
   have particular sensitivities/vulnerabilities:

   *  /oamut:oam-unitary-tests/oamut:oam-unitary-test: This list
      specifies all the oam unitary test entries for network diagnosis
      procedures.  Unauthorized write access to this list can allow
      intruders to modify the entries so as to forge an unitary test
      name that does not exist or maliciously delete an existing unitary
      test, which could be used to craft an attack.

   *  /oamts:oam-sequence-test/oamts:sequence-test: This list specifies
      all the oam sequence test entries for network diagnosis
      procedures.  Unauthorized write access to this list can allow
      intruders to modify the entries so as to forge an sequence test
      name that does not exist or maliciously delete an existing
      sequence test, which could be used to craft an attack.

   This YANG module uses groupings from other YANG modules that define
   nodes that may be considered sensitive or vulnerable in network
   environments.  Refer to the Security Considerations of [RFC9922] for
   information as to which nodes may be considered sensitive or
   vulnerable in network environments.

Contreras, et al.         Expires 16 April 2027                [Page 35]
Internet-Draft             Scheduling OAM YANG              October 2026

9.  IANA Considerations

9.1.  Updates to the IETF XML Registry for New YANG Module

   IANA is requested to register the following URI in the "ns" registry
   within the "IETF XML Registry" group [RFC3688].

         URI: urn:ietf:params:xml:ns:yang:ietf-oam-unitary-test
         Registrant Contact: The IESG.
         XML: N/A, the requested URI is an XML namespace.

         URI: urn:ietf:params:xml:ns:yang:ietf-oam-sequence-test
         Registrant Contact: The IESG.
         XML: N/A, the requested URI is an XML namespace.

9.2.  Updates to the YANG Module Names Registry for New YANG Module

   IANA is requested to register the following YANG module in the "YANG
   Module Names" registry [RFC6020] within the "YANG Parameters"
   registry group.

         Name:       ietf-oam-unitary-test
         Maintained by IANA? N
         Namespace:  urn:ietf:params:xml:ns:yang:ietf-oam-unitary-test
         Prefix:     oamut
         Reference:  RFC XXXX

         Name:       ietf-oam-sequence-test
         Maintained by IANA? N
         Namespace:  urn:ietf:params:xml:ns:yang:ietf-oam-sequence-test
         Prefix:     oamts
         Reference:  RFC XXXX

10.  Implementation Status

   There are currently no known implementations of the YANG modules
   defined in this document.  This section is intended to track
   implementation experience as it becomes available and is expected to
   be removed if the document is published as an RFC.

Acknowledgments

   Thanks Joe Clark, Daniel King, Qiufang Ma, Italo Busi, Fung Lim, Xiao
   Min, Saumya Dikshit for valuable review and comments.

Contreras, et al.         Expires 16 April 2027                [Page 36]
Internet-Draft             Scheduling OAM YANG              October 2026

   The work of Luis M.  Contreras has been partially supported by the
   European Union’s Horizon Program through the 6G DAta and ML
   operations automation via an end-to-end AI framework (6G-DALI)
   Project under Grant 101192750.

References

Normative References

   [RFC2119]  Bradner, S., "Key words for use in RFCs to Indicate
              Requirement Levels", BCP 14, RFC 2119,
              DOI 10.17487/RFC2119, March 1997,
              <https://www.rfc-editor.org/rfc/rfc2119>.

   [RFC3688]  Mealling, M., "The IETF XML Registry", BCP 81, RFC 3688,
              DOI 10.17487/RFC3688, January 2004,
              <https://www.rfc-editor.org/rfc/rfc3688>.

   [RFC4252]  Ylonen, T. and C. Lonvick, Ed., "The Secure Shell (SSH)
              Authentication Protocol", RFC 4252, DOI 10.17487/RFC4252,
              January 2006, <https://www.rfc-editor.org/rfc/rfc4252>.

   [RFC5357]  Hedayat, K., Krzanowski, R., Morton, A., Yum, K., and J.
              Babiarz, "A Two-Way Active Measurement Protocol (TWAMP)",
              RFC 5357, DOI 10.17487/RFC5357, October 2008,
              <https://www.rfc-editor.org/rfc/rfc5357>.

   [RFC5860]  Vigoureux, M., Ed., Ward, D., Ed., and M. Betts, Ed.,
              "Requirements for Operations, Administration, and
              Maintenance (OAM) in MPLS Transport Networks", RFC 5860,
              DOI 10.17487/RFC5860, May 2010,
              <https://www.rfc-editor.org/rfc/rfc5860>.

   [RFC6020]  Bjorklund, M., Ed., "YANG - A Data Modeling Language for
              the Network Configuration Protocol (NETCONF)", RFC 6020,
              DOI 10.17487/RFC6020, October 2010,
              <https://www.rfc-editor.org/rfc/rfc6020>.

   [RFC6241]  Enns, R., Ed., Bjorklund, M., Ed., Schoenwaelder, J., Ed.,
              and A. Bierman, Ed., "Network Configuration Protocol
              (NETCONF)", RFC 6241, DOI 10.17487/RFC6241, June 2011,
              <https://www.rfc-editor.org/rfc/rfc6241>.

   [RFC6991]  Schoenwaelder, J., Ed., "Common YANG Data Types",
              RFC 6991, DOI 10.17487/RFC6991, July 2013,
              <https://www.rfc-editor.org/rfc/rfc6991>.

Contreras, et al.         Expires 16 April 2027                [Page 37]
Internet-Draft             Scheduling OAM YANG              October 2026

   [RFC7471]  Giacalone, S., Ward, D., Drake, J., Atlas, A., and S.
              Previdi, "OSPF Traffic Engineering (TE) Metric
              Extensions", RFC 7471, DOI 10.17487/RFC7471, March 2015,
              <https://www.rfc-editor.org/rfc/rfc7471>.

   [RFC7810]  Previdi, S., Ed., Giacalone, S., Ward, D., Drake, J., and
              Q. Wu, "IS-IS Traffic Engineering (TE) Metric Extensions",
              RFC 7810, DOI 10.17487/RFC7810, May 2016,
              <https://www.rfc-editor.org/rfc/rfc7810>.

   [RFC7950]  Bjorklund, M., Ed., "The YANG 1.1 Data Modeling Language",
              RFC 7950, DOI 10.17487/RFC7950, August 2016,
              <https://www.rfc-editor.org/rfc/rfc7950>.

   [RFC8040]  Bierman, A., Bjorklund, M., and K. Watsen, "RESTCONF
              Protocol", RFC 8040, DOI 10.17487/RFC8040, January 2017,
              <https://www.rfc-editor.org/rfc/rfc8040>.

   [RFC8174]  Leiba, B., "Ambiguity of Uppercase vs Lowercase in RFC
              2119 Key Words", BCP 14, RFC 8174, DOI 10.17487/RFC8174,
              May 2017, <https://www.rfc-editor.org/rfc/rfc8174>.

   [RFC8233]  Dhody, D., Wu, Q., Manral, V., Ali, Z., and K. Kumaki,
              "Extensions to the Path Computation Element Communication
              Protocol (PCEP) to Compute Service-Aware Label Switched
              Paths (LSPs)", RFC 8233, DOI 10.17487/RFC8233, September
              2017, <https://www.rfc-editor.org/rfc/rfc8233>.

   [RFC8340]  Bjorklund, M. and L. Berger, Ed., "YANG Tree Diagrams",
              BCP 215, RFC 8340, DOI 10.17487/RFC8340, March 2018,
              <https://www.rfc-editor.org/rfc/rfc8340>.

   [RFC8341]  Bierman, A. and M. Bjorklund, "Network Configuration
              Access Control Model", STD 91, RFC 8341,
              DOI 10.17487/RFC8341, March 2018,
              <https://www.rfc-editor.org/rfc/rfc8341>.

   [RFC8446]  Rescorla, E., "The Transport Layer Security (TLS) Protocol
              Version 1.3", RFC 8446, DOI 10.17487/RFC8446, August 2018,
              <https://www.rfc-editor.org/rfc/rfc8446>.

   [RFC8528]  Bjorklund, M. and L. Lhotka, "YANG Schema Mount",
              RFC 8528, DOI 10.17487/RFC8528, March 2019,
              <https://www.rfc-editor.org/rfc/rfc8528>.

Contreras, et al.         Expires 16 April 2027                [Page 38]
Internet-Draft             Scheduling OAM YANG              October 2026

   [RFC8639]  Voit, E., Clemm, A., Gonzalez Prieto, A., Nilsen-Nygaard,
              E., and A. Tripathy, "Subscription to YANG Notifications",
              RFC 8639, DOI 10.17487/RFC8639, September 2019,
              <https://www.rfc-editor.org/rfc/rfc8639>.

   [RFC8641]  Clemm, A. and E. Voit, "Subscription to YANG Notifications
              for Datastore Updates", RFC 8641, DOI 10.17487/RFC8641,
              September 2019, <https://www.rfc-editor.org/rfc/rfc8641>.

   [RFC8969]  Wu, Q., Ed., Boucadair, M., Ed., Lopez, D., Xie, C., and
              L. Geng, "A Framework for Automating Service and Network
              Management with YANG", RFC 8969, DOI 10.17487/RFC8969,
              January 2021, <https://www.rfc-editor.org/rfc/rfc8969>.

   [RFC9000]  Iyengar, J., Ed. and M. Thomson, Ed., "QUIC: A UDP-Based
              Multiplexed and Secure Transport", RFC 9000,
              DOI 10.17487/RFC9000, May 2021,
              <https://www.rfc-editor.org/rfc/rfc9000>.

   [RFC9907]  Bierman, A., Boucadair, M., Ed., and Q. Wu, "Guidelines
              for Authors and Reviewers of Documents Containing YANG
              Data Models", BCP 216, RFC 9907, DOI 10.17487/RFC9907,
              March 2026, <https://www.rfc-editor.org/rfc/rfc9907>.

   [RFC9911]  Schönwälder, J., Ed., "Common YANG Data Types", RFC 9911,
              DOI 10.17487/RFC9911, December 2025,
              <https://www.rfc-editor.org/rfc/rfc9911>.

   [RFC9922]  Ma, Q., Ed., Wu, Q., Boucadair, M., Ed., and D. King, "A
              Common YANG Data Model for Scheduling", RFC 9922,
              DOI 10.17487/RFC9922, March 2026,
              <https://www.rfc-editor.org/rfc/rfc9922>.

   [RFC10014] Pignataro, C., Farrel, A., and T. Mizrahi, "Guidelines for
              Characterizing the Term "OAM"", BCP 161, RFC 10014,
              DOI 10.17487/RFC10014, June 2026,
              <https://www.rfc-editor.org/rfc/rfc10014>.

Informative References

   [I-D.ietf-nmop-network-incident-yang]
              Hu, T., Contreras, L. M., Wu, Q., Davis, N., and C. Feng,
              "A YANG Data Model for Network Incident Management", Work
              in Progress, Internet-Draft, draft-ietf-nmop-network-
              incident-yang-19, 7 October 2026,
              <https://datatracker.ietf.org/doc/html/draft-ietf-nmop-
              network-incident-yang-19>.

Contreras, et al.         Expires 16 April 2027                [Page 39]
Internet-Draft             Scheduling OAM YANG              October 2026

   [I-D.tt-netmod-yang-config-templates]
              Watsen, K., Ma, Q., and D. Rajaram, "YANG Configuration
              Templates", Work in Progress, Internet-Draft, draft-tt-
              netmod-yang-config-templates-04, 22 September 2026,
              <https://datatracker.ietf.org/doc/html/draft-tt-netmod-
              yang-config-templates-04>.

   [IEEE-8021ag]
              "IEEE Standard for Local and Metropolitan Area Networks –
              Bridges and Bridged Networks – Connectivity Fault
              Management", 2007,
              <https://standards.ieee.org/ieee/802.1ag/3597/>.

   [IEEE-8021Q]
              "IEEE Standard for Local and metropolitan area networks -
              Media Access Control (MAC) Bridges and Virtual Bridged
              Local Area Networks", October 2012,
              <https://standards.ieee.org/ieee/802.1Q/6844/>.

   [ITU-T-G81131]
              "Operation and maintenance mechanism for T-MPLS layer
              networks", April 2007,
              <https://www.itu.int/rec/T-REC-G.8113.1-201611-I!Cor1>.

   [ITU-T-Y1731]
              "OAM Functions and Mechanisms for Ethernet-based
              Networks", 13 June 2023,
              <https://www.itu.int/rec/T-REC-Y.1731/en>.

   [RFC0792]  Postel, J., "Internet Control Message Protocol", STD 5,
              RFC 792, DOI 10.17487/RFC792, September 1981,
              <https://www.rfc-editor.org/rfc/rfc792>.

   [RFC792]   Postel, J., "Internet Control Message Protocol", STD 5,
              RFC 792, DOI 10.17487/RFC792, September 1981,
              <https://www.rfc-editor.org/rfc/rfc792>.

   [RFC4176]  El Mghazli, Y., Ed., Nadeau, T., Boucadair, M., Chan, K.,
              and A. Gonguet, "Framework for Layer 3 Virtual Private
              Networks (L3VPN) Operations and Management", RFC 4176,
              DOI 10.17487/RFC4176, October 2005,
              <https://www.rfc-editor.org/rfc/rfc4176>.

   [RFC4379]  Kompella, K. and G. Swallow, "Detecting Multi-Protocol
              Label Switched (MPLS) Data Plane Failures", RFC 4379,
              DOI 10.17487/RFC4379, February 2006,
              <https://www.rfc-editor.org/rfc/rfc4379>.

Contreras, et al.         Expires 16 April 2027                [Page 40]
Internet-Draft             Scheduling OAM YANG              October 2026

   [RFC4443]  Conta, A., Deering, S., and M. Gupta, Ed., "Internet
              Control Message Protocol (ICMPv6) for the Internet
              Protocol Version 6 (IPv6) Specification", STD 89,
              RFC 4443, DOI 10.17487/RFC4443, March 2006,
              <https://www.rfc-editor.org/rfc/rfc4443>.

   [RFC4655]  Farrel, A., Vasseur, J.-P., and J. Ash, "A Path
              Computation Element (PCE)-Based Architecture", RFC 4655,
              DOI 10.17487/RFC4655, August 2006,
              <https://www.rfc-editor.org/rfc/rfc4655>.

   [RFC5085]  Nadeau, T., Ed. and C. Pignataro, Ed., "Pseudowire Virtual
              Circuit Connectivity Verification (VCCV): A Control
              Channel for Pseudowires", RFC 5085, DOI 10.17487/RFC5085,
              December 2007, <https://www.rfc-editor.org/rfc/rfc5085>.

   [RFC5880]  Katz, D. and D. Ward, "Bidirectional Forwarding Detection
              (BFD)", RFC 5880, DOI 10.17487/RFC5880, June 2010,
              <https://www.rfc-editor.org/rfc/rfc5880>.

   [RFC6291]  Andersson, L., van Helvoort, H., Bonica, R., Romascanu,
              D., and S. Mansfield, "Guidelines for the Use of the "OAM"
              Acronym in the IETF", BCP 161, RFC 6291,
              DOI 10.17487/RFC6291, June 2011,
              <https://www.rfc-editor.org/rfc/rfc6291>.

   [RFC6371]  Busi, I., Ed. and D. Allan, Ed., "Operations,
              Administration, and Maintenance Framework for MPLS-Based
              Transport Networks", RFC 6371, DOI 10.17487/RFC6371,
              September 2011, <https://www.rfc-editor.org/rfc/rfc6371>.

   [RFC6428]  Allan, D., Ed., Swallow, G., Ed., and J. Drake, Ed.,
              "Proactive Connectivity Verification, Continuity Check,
              and Remote Defect Indication for the MPLS Transport
              Profile", RFC 6428, DOI 10.17487/RFC6428, November 2011,
              <https://www.rfc-editor.org/rfc/rfc6428>.

   [RFC6632]  Ersue, M., Ed. and B. Claise, "An Overview of the IETF
              Network Management Standards", RFC 6632,
              DOI 10.17487/RFC6632, June 2012,
              <https://www.rfc-editor.org/rfc/rfc6632>.

   [RFC7174]  Salam, S., Senevirathne, T., Aldrin, S., and D. Eastlake
              3rd, "Transparent Interconnection of Lots of Links (TRILL)
              Operations, Administration, and Maintenance (OAM)
              Framework", RFC 7174, DOI 10.17487/RFC7174, May 2014,
              <https://www.rfc-editor.org/rfc/rfc7174>.

Contreras, et al.         Expires 16 April 2027                [Page 41]
Internet-Draft             Scheduling OAM YANG              October 2026

   [RFC7276]  Mizrahi, T., Sprecher, N., Bellagamba, E., and Y.
              Weingarten, "An Overview of Operations, Administration,
              and Maintenance (OAM) Tools", RFC 7276,
              DOI 10.17487/RFC7276, June 2014,
              <https://www.rfc-editor.org/rfc/rfc7276>.

   [RFC7297]  Boucadair, M., Jacquenet, C., and N. Wang, "IP
              Connectivity Provisioning Profile (CPP)", RFC 7297,
              DOI 10.17487/RFC7297, July 2014,
              <https://www.rfc-editor.org/rfc/rfc7297>.

   [RFC8029]  Kompella, K., Swallow, G., Pignataro, C., Ed., Kumar, N.,
              Aldrin, S., and M. Chen, "Detecting Multiprotocol Label
              Switched (MPLS) Data-Plane Failures", RFC 8029,
              DOI 10.17487/RFC8029, March 2017,
              <https://www.rfc-editor.org/rfc/rfc8029>.

   [RFC8531]  Kumar, D., Wu, Q., and Z. Wang, "Generic YANG Data Model
              for Connection-Oriented Operations, Administration, and
              Maintenance (OAM) Protocols", RFC 8531,
              DOI 10.17487/RFC8531, April 2019,
              <https://www.rfc-editor.org/rfc/rfc8531>.

   [RFC8532]  Kumar, D., Wang, Z., Wu, Q., Ed., Rahman, R., and S.
              Raghavan, "Generic YANG Data Model for the Management of
              Operations, Administration, and Maintenance (OAM)
              Protocols That Use Connectionless Communications",
              RFC 8532, DOI 10.17487/RFC8532, April 2019,
              <https://www.rfc-editor.org/rfc/rfc8532>.

   [RFC8533]  Kumar, D., Wang, M., Wu, Q., Ed., Rahman, R., and S.
              Raghavan, "A YANG Data Model for Retrieval Methods for the
              Management of Operations, Administration, and Maintenance
              (OAM) Protocols That Use Connectionless Communications",
              RFC 8533, DOI 10.17487/RFC8533, April 2019,
              <https://www.rfc-editor.org/rfc/rfc8533>.

   [RFC8762]  Mirsky, G., Jun, G., Nydell, H., and R. Foote, "Simple
              Two-Way Active Measurement Protocol", RFC 8762,
              DOI 10.17487/RFC8762, March 2020,
              <https://www.rfc-editor.org/rfc/rfc8762>.

   [RFC8913]  Civil, R., Morton, A., Rahman, R., Jethanandani, M., and
              K. Pentikousis, Ed., "Two-Way Active Measurement Protocol
              (TWAMP) YANG Data Model", RFC 8913, DOI 10.17487/RFC8913,
              November 2021, <https://www.rfc-editor.org/rfc/rfc8913>.

Contreras, et al.         Expires 16 April 2027                [Page 42]
Internet-Draft             Scheduling OAM YANG              October 2026

   [RFC9107]  Raszuk, R., Ed., Decraene, B., Ed., Cassar, C., Åman, E.,
              and K. Wang, "BGP Optimal Route Reflection (BGP ORR)",
              RFC 9107, DOI 10.17487/RFC9107, August 2021,
              <https://www.rfc-editor.org/rfc/rfc9107>.

   [RFC9197]  Brockners, F., Ed., Bhandari, S., Ed., and T. Mizrahi,
              Ed., "Data Fields for In Situ Operations, Administration,
              and Maintenance (IOAM)", RFC 9197, DOI 10.17487/RFC9197,
              May 2022, <https://www.rfc-editor.org/rfc/rfc9197>.

   [RFC9341]  Fioccola, G., Ed., Cociglio, M., Mirsky, G., Mizrahi, T.,
              and T. Zhou, "Alternate-Marking Method", RFC 9341,
              DOI 10.17487/RFC9341, December 2022,
              <https://www.rfc-editor.org/rfc/rfc9341>.

   [RFC9543]  Farrel, A., Ed., Drake, J., Ed., Rokui, R., Homma, S.,
              Makhijani, K., Contreras, L., and J. Tantsura, "A
              Framework for Network Slices in Networks Built from IETF
              Technologies", RFC 9543, DOI 10.17487/RFC9543, March 2024,
              <https://www.rfc-editor.org/rfc/rfc9543>.

   [RFC9617]  Zhou, T., Ed., Guichard, J., Brockners, F., and S.
              Raghavan, "A YANG Data Model for In Situ Operations,
              Administration, and Maintenance (IOAM)", RFC 9617,
              DOI 10.17487/RFC9617, August 2024,
              <https://www.rfc-editor.org/rfc/rfc9617>.

   [RFC9940]  Davis, N., Ed., Farrel, A., Ed., Graf, T., Wu, Q., and C.
              Yu, "Some Key Terms for Network Fault and Problem
              Management", RFC 9940, DOI 10.17487/RFC9940, April 2026,
              <https://www.rfc-editor.org/rfc/rfc9940>.

Appendix A.  Examples

   This section includes a non-exhaustive list of examples to illustrate
   the use of the models defined in this document.

A.1.  Create a TWAMP OAM test

   [RFC8913] defines a YANG model for TWAMP.  The following example
   demonstrates how scheduled test results from mounted device models
   surface through NMDA retrieval from the operational datastore.  It
   shows a single OAM unitary test (one schedule, one unitary-test-
   status) for a recurring TWAMP performance measurement.  Two ne-config
   entries target the session-sender and session-reflector nodes
   respectively; both use test-type "twamp", with different mounted
   TWAMP subtrees under root.  Within the sender configuration, "Test1"
   and "Test2" are two test-session list entries in the mounted TWAMP

Contreras, et al.         Expires 16 April 2027                [Page 43]
Internet-Draft             Scheduling OAM YANG              October 2026

   model on one node—they are not two unitary tests and not two sequence
   steps.  Separate unitary tests or sequence steps would be used only
   when each procedure needs its own schedule or place in an ordered
   diagnosis workflow (for example, ping then TWAMP).

   This example uses the "twamp" identity defined in the ietf-oam-
   unitary-test module (derived from "test-type").  The TWAMP device
   model configuration is mounted at the "root" of each "ne-config"
   entry and has been applied in the operational datastore.

   An example of a request message body to create a TWAMP OAM test is
   shown in Figure 6.  Session-Sender and Session-Reflector as expanded
   for illustrative purposes.  The TWAMP Test scheduled in this
   configuration is a one-hour performance monitoring test that runs
   daily at 9 AM UTC.  This test session is configured to start on
   October 17, 2023, at 09:00 UTC and recur at the same time every day.
   The duration of each test run is one hour, as specified by the
   unint32 format "3600", with the test status marked as "configured".
   The test provides insight into network performance by monitoring the
   selected parameters, allowing for the detection of any potential
   degradations in service quality over time.

   =============== NOTE: '\' line wrapping per RFC 8792 ================

   {
     "ietf-oam-unitary-test:oam-unitary-tests": {
       "oam-unitary-test": [
         {
           "name": "TWAMP-Test-scheduled-daily",
           "recurrence": {
           "recurrence-first": {
           "start-time-utc": "2026-10-17T09:00:00Z",
           "duration": "3600"
            },
           "utc-until": "2026-12-31T23:59:59Z",
           "recurrence-description": "TWAMP Test Reccurence, Daily at \
                                                              9 AM UTC",
           "frequency": "ietf-schedule:daily",
           "interval": 1
           },
           "unitary-test-status": "configured",
           "ne-config": [
             {
               "ne-id": "203.0.113.3",
               "managed": true,
               "test-type": "twamp",
               "root": {
               "twamp": {

Contreras, et al.         Expires 16 April 2027                [Page 44]
Internet-Draft             Scheduling OAM YANG              October 2026

                 "session-sender": {
                   "admin-state": true,
                   "test-session": [
                     {
                       "name": "Test1",
                       "ctrl-connection-name": "RouterA",
                       "fill-mode": "zero",
                       "number-of-packets": 900,
                       "periodic-interval": 1,
                       "sent-packets": 2,
                       "rcv-packets": 2,
                       "last-sent-seq": 1,
                       "last-rcv-seq": 1
                     },
                     {
                       "name": "Test2",
                       "ctrl-connection-name": "RouterA",
                       "fill-mode": "random",
                       "number-of-packets": 900,
                       "lambda": 1,
                       "max-interval": 2,
                       "sent-packets": 21,
                       "rcv-packets": 21,
                       "last-sent-seq": 20,
                       "last-rcv-seq": 20
                     }
                   ]
                 }
               }
             }
           },
           {
               "ne-id": "203.0.113.4",
               "managed": "true",
               "test-type": "twamp",
               "root": {
               "twamp": {
                 "session-reflector": {
                   "admin-state": true,
                   "test-session": [
                     {
                       "sid": 1232,
                       "sender-ip": "203.0.113.3",
                       "sender-udp-port": 54000,
                       "reflector-ip": "203.0.113.4",
                       "reflector-udp-port": 55000,
                       "parent-connection-client-ip": "203.0.113.1",
                       "parent-connection-client-tcp-port": 16341,

Contreras, et al.         Expires 16 April 2027                [Page 45]
Internet-Draft             Scheduling OAM YANG              October 2026

                       "parent-connection-server-ip": "203.0.113.2",
                       "parent-connection-server-tcp-port": 862,
                       "test-packet-dscp": 32,
                       "sent-packets": 2,
                       "rcv-packets": 2,
                       "last-sent-seq": 1,
                       "last-rcv-seq": 1
                     },
                     {
                       "sid": 178943,
                       "sender-ip": "203.0.113.1",
                       "sender-udp-port": 54001,
                       "reflector-ip": "192.0.2.2",
                       "reflector-udp-port": 55001,
                       "parent-connection-client-ip": "203.0.113.1",
                       "parent-connection-client-tcp-port": 16341,
                       "parent-connection-server-ip": "203.0.113.2",
                       "parent-connection-server-tcp-port": 862,
                       "test-packet-dscp": 32,
                       "sent-packets": 21,
                       "rcv-packets": 21,
                       "last-sent-seq": 20,
                       "last-rcv-seq": 20
                     }
                   ]
                 }
               }
             }
           }
         ]
        }
       ]
     }
   }

       Figure 6: Example of a Message Body to Create a TWAMP OAM test

A.2.  Ping OAM Test Template

   Ping OAM Test Template can be defined using YANG-based configuration
   template specified in [I-D.tt-netmod-yang-config-templates] as
   follows:

Contreras, et al.         Expires 16 April 2027                [Page 46]
Internet-Draft             Scheduling OAM YANG              October 2026

   <?xml version="1.0" encoding="utf-8"?>
   <templates xmlns="urn:ietf:params:xml:ns:yang:ietf-config-template">
        <template>
          <id>oam-unitary-test-schedule</id>
          <content>
            <oam-unitary-tests xmlns="urn:example:oam-unitary-tests">
              <oam-unitary-test>
                <name>*ping</name>
                <ne-config>
                      <ne-id>eth*</ne-id>
                </ne-config>
                <period-start>2025-10-01T08:00:00Z</period-start>
                 <frequency>hourly</frequency>
              </oam-unitary-test>
            </oam-unitary-tests>
          </content>
        </template>
   </templates>

             Figure 7: Example of OAM Test Template Definition

   Template application is indicated using the "apply-templates"
   metadata.  For example, the following OAM unitary tests configuration
   may be provided with the container node "oam-unitary-tests" applying
   the template defined in Figure 7.

   As described in [I-D.tt-netmod-yang-config-templates], a template
   node can be overriden by having its value changed, but it can't be
   deleted.

   As an example of overriding a node in a template, a client may
   configure physically present OAM Unitary Tests "lsp-ping", "ip-ping"
   and "srmpls-ping" inheriting the template defined in Figure 7, but
   the "ne-id" value of "srmpls-ping" needs to be "203.0.113.4":

Contreras, et al.         Expires 16 April 2027                [Page 47]
Internet-Draft             Scheduling OAM YANG              October 2026

    <?xml version="1.0" encoding="utf-8"?>
    <oam-unitary-tests xmlns="urn:example:interface"
             xmlns:ct="urn:ietf:params:xml:ns:yang:ietf-config-template"
             ct:apply-templates="oam-unitary-test-schedule">
             <oam-unitary-test>
               <name>lsp-ping</name>
                           <ne-config>
                              <ne-id>eth0</ne-id>
                                  <managed>true</managed>
                                  ...
                           </ne-config>
             </oam-unitary-test>
             <oam-unitary-test>
               <name>ip-ping</name>
             </oam-unitary-test>
             <oam-unitary-test>
               <name>srmpls-ping</name>
                                  <ne-config>
                              <ne-id>203.0.113.4</ne-id>
                                  ...
                           </ne-config>
             </oam-unitary-test>
    </oam-unitary-tests>

            Figure 8: Example of Applying OAM Test Template

   And the above OAM Unitary Tests configuration renders the following
   expanded configuration:

Contreras, et al.         Expires 16 April 2027                [Page 48]
Internet-Draft             Scheduling OAM YANG              October 2026

<?xml version="1.0" encoding="utf-8"?>
   <oam-unitary-tests xmlns="urn:example:interface"
            xmlns:ct="urn:ietf:params:xml:ns:yang:ietf-config-template">
            <oam-unitary-test>
              <name>lsp-ping</name>
                          <ne-config>
                             <ne-id>eth0</ne-id>
                                 <managed>true</managed>
                                 ...
                          </ne-config>
                          <period-start>2025-10-01T08:00:00Z</period-start>
              <frequency>hourly</frequency>
            </oam-unitary-test>
            <oam-unitary-test>
              <name>ip-ping</name>
                           <ne-config>
                             <ne-id>eth1</ne-id>
                                 <managed>true</managed>
                                 ...
                          </ne-config>
                          <period-start>2025-10-01T08:00:00Z</period-start>
              <frequency>hourly</frequency>
            </oam-unitary-test>
            <oam-unitary-test>
              <name>srmpls-ping</name>
                                 <ne-config>
                             <ne-id>203.0.113.4</ne-id>
                                 ...
                          </ne-config>
            </oam-unitary-test>
   </oam-unitary-tests>

Appendix B.  Change between Revision

   v10 - v11

   *  Clarify the relationship between OAM unitary test and OAM sequence
      test;

   *  Clarify TWAMP Appendix example (multi-node and multi-session
      within one unitary test);

   v07 - v08 * Change ne-id data type to inet:host;

   *  Add Child identities for unitary-test-type;

   *  Add references for imported types and used reference in the YANG
      model section;

Contreras, et al.         Expires 16 April 2027                [Page 49]
Internet-Draft             Scheduling OAM YANG              October 2026

   *  Change recurrence-basic to recurrence-utc;

   *  Point counter wrapp-around to RFC9922;

   *  Explain when operators set managed to false;

   *  Align stop transitions in unitary and sequence state machines;

   *  Operational Consideration Update;

   *  Sample OAM Test Scheduling Network Model Usage;

   v06 - v07

   *  Some Editorial changes based on Hansai's comments;

   *  Add schedule status descrption in the section OAM Unitary Test;

   *  Change temporal parameter into YANG statement;

   *  Change to Both Frequency and Interval are required;

   *  Fix indentation issue based on Hansai's comments;

   *  Fix indentation issue based on Hansai's comments;

   *  Change two yang module prefixes;

   *  Follow Security Considerations template defined by RFC 9907;

   *  OAM Teminology Consistency;

   *  Fix ne-id description;

Authors' Addresses

   Luis M. Contreras
   Telefonica
   Email: luismiguel.contrerasmurillo@telefonica.com

   Victor Lopez
   Nokia
   Email: victor.lopez@nokia.com

   Qin Wu
   Huawei

Contreras, et al.         Expires 16 April 2027                [Page 50]
Internet-Draft             Scheduling OAM YANG              October 2026

   Email: bill.wu@huawei.com

Contreras, et al.         Expires 16 April 2027                [Page 51]