TVR (Time-Variant Routing) Requirements
draft-tvr-requirements-00
Document | Type |
Expired Internet-Draft
(individual)
Expired & archived
|
|
---|---|---|---|
Authors | Daniel King , Luis M. Contreras , Brian Sipos | ||
Last updated | 2024-03-18 (Latest revision 2023-09-06) | ||
RFC stream | (None) | ||
Intended RFC status | (None) | ||
Formats | |||
Stream | Stream state | (No stream defined) | |
Consensus boilerplate | Unknown | ||
RFC Editor Note | (None) | ||
IESG | IESG state | Expired | |
Telechat date | (None) | ||
Responsible AD | (None) | ||
Send notices to | (None) |
This Internet-Draft is no longer active. A copy of the expired Internet-Draft is available in these formats:
Abstract
Time-Variant Routing (TVR) involves calculating a path, or subpath within a network, taking into account the timing of message transmission or receipt as an integral part of the overall route computation. The results of a TVR computation are influenced by the specific time at which the path is needed, and the computation is performed without any discernible alterations to the network topology or other cost functions associated with the route. This document introduces requirements for TVR computations to improve network communication and resource efficiency.
Authors
Daniel King
Luis M. Contreras
Brian Sipos
(Note: The e-mail addresses provided for the authors of this Internet-Draft may no longer be valid.)