Skip to main content

Last Call Review of draft-farrell-perpass-attack-04
review-farrell-perpass-attack-04-genart-lc-brim-2014-01-18-00

Request Review of draft-farrell-perpass-attack
Requested revision No specific revision (document currently at 06)
Type Last Call Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2014-01-21
Requested 2013-12-19
Authors Stephen Farrell , Hannes Tschofenig
I-D last updated 2014-01-18
Completed reviews Genart Last Call review of -03 by Scott W. Brim (diff)
Genart Last Call review of -04 by Scott W. Brim (diff)
Genart Telechat review of -05 by Scott W. Brim (diff)
Secdir Last Call review of -02 by Adam W. Montville (diff)
Opsdir Last Call review of -03 by Dan Romascanu (diff)
Assignment Reviewer Scott W. Brim
State Completed
Request Last Call review on draft-farrell-perpass-attack by General Area Review Team (Gen-ART) Assigned
Reviewed revision 04 (document currently at 06)
Result Ready
Completed 2014-01-18
review-farrell-perpass-attack-04-genart-lc-brim-2014-01-18-00
I am the assigned Gen-ART reviewer for this draft. For background on




Gen-ART, please see the FAQ at

< 

http://wiki.tools.ietf.org/

area/gen/trac/wiki/GenArtfaq>.




Please wait for direction from your document shepherd




or AD before posting a new version of the draft.




Document: draft-farrell-perpass-attack-04

Reviewer: Scott Brim




Review Date: 2014-01-18

IETF LC End Date: 2013-12-31




IESG Telechat date: (if known): 2014-01-23




Summary: Ready




Major issues: none




Minor issues: none




Nits/editorial comments: There are editorial changes I could suggest, but it's good enough.