Last Call Review of draft-ietf-teas-pce-central-control-03
review-ietf-teas-pce-central-control-03-opsdir-lc-zhou-2017-08-22-00
Request | Review of | draft-ietf-teas-pce-central-control |
---|---|---|
Requested revision | No specific revision (document currently at 05) | |
Type | Last Call Review | |
Team | Ops Directorate (opsdir) | |
Deadline | 2017-08-24 | |
Requested | 2017-08-10 | |
Authors | Adrian Farrel , Quintin Zhao , Zhenbin Li , Chao Zhou | |
Draft last updated | 2017-08-22 | |
Completed reviews |
Rtgdir Last Call review of -03
by Thomas Morin
(diff)
Genart Last Call review of -03 by Elwyn B. Davies (diff) Opsdir Last Call review of -03 by Tianran Zhou (diff) Secdir Last Call review of -04 by Matthew A. Miller (diff) Genart Telechat review of -04 by Elwyn B. Davies (diff) |
|
Assignment | Reviewer | Tianran Zhou |
State | Completed | |
Review |
review-ietf-teas-pce-central-control-03-opsdir-lc-zhou-2017-08-22
|
|
Reviewed revision | 03 (document currently at 05) | |
Result | Ready | |
Completed | 2017-08-22 |
review-ietf-teas-pce-central-control-03-opsdir-lc-zhou-2017-08-22-00
I have reviewed this document as part of the Operational directorate's ongoing effort to review all IETF documents being processed by the IESG. These comments were written with the intent of improving the operational aspects of the IETF drafts. Comments that are not addressed in last call may be included in AD reviews during the IESG review. Document editors and WG chairs should treat these comments just like any other last call comments. I did not see any special operational or network management related issue. This document is clear to me and is ready for publication. Cheers, Tianran