Skip to main content

Last Call Review of draft-ietf-teas-pce-central-control-03
review-ietf-teas-pce-central-control-03-opsdir-lc-zhou-2017-08-22-00

Request Review of draft-ietf-teas-pce-central-control
Requested revision No specific revision (document currently at 05)
Type Last Call Review
Team Ops Directorate (opsdir)
Deadline 2017-08-24
Requested 2017-08-10
Authors Adrian Farrel , Quintin Zhao , Zhenbin Li , Chao Zhou
I-D last updated 2017-08-22
Completed reviews Rtgdir Last Call review of -03 by Thomas Morin (diff)
Genart Last Call review of -03 by Elwyn B. Davies (diff)
Opsdir Last Call review of -03 by Tianran Zhou (diff)
Secdir Last Call review of -04 by Matthew A. Miller (diff)
Genart Telechat review of -04 by Elwyn B. Davies (diff)
Assignment Reviewer Tianran Zhou
State Completed
Request Last Call review on draft-ietf-teas-pce-central-control by Ops Directorate Assigned
Reviewed revision 03 (document currently at 05)
Result Ready
Completed 2017-08-22
review-ietf-teas-pce-central-control-03-opsdir-lc-zhou-2017-08-22-00
I have reviewed this document as part of the Operational directorate's ongoing
effort to review all IETF documents being processed by the IESG.  These
comments were written with the intent of improving the operational aspects of
the IETF drafts. Comments that are not addressed in last call may be included
in AD reviews during the IESG review.  Document editors and WG chairs should
treat these comments just like any other last call comments.

I did not see any special operational or network management related issue. This
document is clear to me and is ready for publication.

Cheers,
Tianran