Skip to main content

Telechat Review of draft-ietf-tram-stun-pmtud-10
review-ietf-tram-stun-pmtud-10-genart-telechat-even-2018-09-25-00

Request Review of draft-ietf-tram-stun-pmtud
Requested revision No specific revision (document currently at 20)
Type Telechat Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2018-09-25
Requested 2018-09-18
Authors Marc Petit-Huguenin , Gonzalo Salgueiro
I-D last updated 2018-09-25
Completed reviews Genart Last Call review of -09 by Roni Even (diff)
Secdir Last Call review of -09 by Carl Wallace (diff)
Opsdir Last Call review of -10 by Éric Vyncke (diff)
Genart Telechat review of -10 by Roni Even (diff)
Tsvart Telechat review of -10 by Gorry Fairhurst (diff)
Assignment Reviewer Roni Even
State Completed
Request Telechat review on draft-ietf-tram-stun-pmtud by General Area Review Team (Gen-ART) Assigned
Reviewed revision 10 (document currently at 20)
Result Ready
Completed 2018-09-25
review-ietf-tram-stun-pmtud-10-genart-telechat-even-2018-09-25-00
I am the assigned Gen-ART reviewer for this draft. The General Area
Review Team (Gen-ART) reviews all IETF documents being processed
by the IESG for the IETF Chair. Please wait for direction from your
document shepherd or AD before posting a new version of the draft.

For more information, please see the FAQ at

<https://trac.ietf.org/trac/gen/wiki/GenArtfaq>.

Document: draft-ietf-tram-stun-pmtud-??
Reviewer: Roni Even
Review Date: 2018-09-25
IETF LC End Date: 2018-09-12
IESG Telechat date: 2018-09-27

Summary: The document is ready for publication as a standard track RFC

Major issues:

Minor issues:

Nits/editorial comments: