Telechat Review of draft-ietf-tram-stun-pmtud-10
review-ietf-tram-stun-pmtud-10-genart-telechat-even-2018-09-25-00

Request Review of draft-ietf-tram-stun-pmtud
Requested rev. no specific revision
Type Telechat Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2018-09-25
Requested 2018-09-18
Other Reviews Genart Last Call review of -09 by Roni Even (diff)
Secdir Last Call review of -09 by Carl Wallace (diff)
Opsdir Last Call review of -10 by √Čric Vyncke
Tsvart Telechat review of -10 by Gorry Fairhurst
Review State Completed
Reviewer Roni Even
Review review-ietf-tram-stun-pmtud-10-genart-telechat-even-2018-09-25
Posted at https://mailarchive.ietf.org/arch/msg/gen-art/aOwDR0GoSnZzW68XYvgPo0vW4gA
Reviewed rev. 10
Review result Ready
Draft last updated 2018-09-25
Review completed: 2018-09-25

Review
review-ietf-tram-stun-pmtud-10-genart-telechat-even-2018-09-25

I am the assigned Gen-ART reviewer for this draft. The General Area
Review Team (Gen-ART) reviews all IETF documents being processed
by the IESG for the IETF Chair. Please wait for direction from your
document shepherd or AD before posting a new version of the draft.

For more information, please see the FAQ at

<https://trac.ietf.org/trac/gen/wiki/GenArtfaq>.

Document: draft-ietf-tram-stun-pmtud-??
Reviewer: Roni Even
Review Date: 2018-09-25
IETF LC End Date: 2018-09-12
IESG Telechat date: 2018-09-27

Summary: The document is ready for publication as a standard track RFC

Major issues:

Minor issues:

Nits/editorial comments: