Skip to main content

Review request
draft-ietf-teas-pce-central-control

Request Review of draft-ietf-teas-pce-central-control
Requested revision No specific revision (document currently at 05)
Type Last Call Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2017-08-24
Requested 2017-08-10
Authors Adrian Farrel , Quintin Zhao , Zhenbin Li , Chao Zhou
WG chairs Oscar Gonzalez de Dios , Vishnu Pavan Beeram , Lou Berger
I-D last updated 2018-12-20
IESG document state Became RFC 8283 (Informational)
Completed reviews Rtgdir Last Call review of -03 by Thomas Morin (diff)
Genart Last Call review of -03 by Elwyn B. Davies (diff)
Opsdir Last Call review of -03 by Tianran Zhou (diff)
Secdir Last Call review of -04 by Matthew A. Miller (diff)
Genart Telechat review of -04 by Elwyn B. Davies (diff)
Assignment Reviewer Elwyn B. Davies
State Completed
Review review-ietf-teas-pce-central-control-03-genart-lc-davies-2017-08-20
Reviewed revision 03 (document currently at 05)
Result Almost ready
Completed 2017-08-20

History

Date By Description