Document Shepherding Throughout a Document's Lifecycle
draft-leiba-extended-doc-shepherd-00

The information below is for an old version of the document.
Document Type
This is an older version of an Internet-Draft whose latest revision state is "Expired".
Author Barry Leiba
Last updated 2012-10-23 (Latest revision 2012-08-01)
RFC stream Internet Engineering Task Force (IETF)
Formats
Reviews
Stream WG state (None)
Document shepherd (None)
IESG IESG state IESG Evaluation
Consensus boilerplate Unknown
Telechat date (None)
Responsible AD Russ Housley
Send notices to barryleiba@computer.org, "Murray S. Kucherawy" <superuser@gmail.com>
draft-leiba-extended-doc-shepherd-00
Network Working Group                                           B. Leiba
Internet-Draft                                       Huawei Technologies
Intended status: Informational                            August 2, 2012
Expires: February 3, 2013

         Document Shepherding Throughout a Document's Lifecycle
                  draft-leiba-extended-doc-shepherd-00

Abstract

   RFC 4858 talks about "Document Shepherding from Working Group Last
   Call to Publication".  There's a significant part of a document's
   life that happens before working group last call, starting, really,
   at the time a working group begins discussing a version of the idea
   that's been posted as an individual draft.  It seems reasonable and
   helpful to begin shepherding when there's a call for adoption as a
   working group document, and this document gives one Area Director's
   view of how that extended shepherding function might work, and what
   tasks might be involved throughout the document's lifecycle.

Status of this Memo

   This Internet-Draft is submitted in full conformance with the
   provisions of BCP 78 and BCP 79.

   Internet-Drafts are working documents of the Internet Engineering
   Task Force (IETF).  Note that other groups may also distribute
   working documents as Internet-Drafts.  The list of current Internet-
   Drafts is at http://datatracker.ietf.org/drafts/current/.

   Internet-Drafts are draft documents valid for a maximum of six months
   and may be updated, replaced, or obsoleted by other documents at any
   time.  It is inappropriate to use Internet-Drafts as reference
   material or to cite them other than as "work in progress."

   This Internet-Draft will expire on February 3, 2013.

Copyright Notice

   Copyright (c) 2012 IETF Trust and the persons identified as the
   document authors.  All rights reserved.

   This document is subject to BCP 78 and the IETF Trust's Legal
   Provisions Relating to IETF Documents
   (http://trustee.ietf.org/license-info) in effect on the date of
   publication of this document.  Please review these documents
   carefully, as they describe your rights and restrictions with respect

Leiba                   Expires February 3, 2013                [Page 1]
Internet-Draft        Extended Document Shepherding          August 2012

   to this document.  Code Components extracted from this document must
   include Simplified BSD License text as described in Section 4.e of
   the Trust Legal Provisions and are provided without warranty as
   described in the Simplified BSD License.

Table of Contents

   1.    Introduction . . . . . . . . . . . . . . . . . . . . . . . .  3
   1.1.  Notational Conventions . . . . . . . . . . . . . . . . . . .  3

   2.    The Document Shepherd as a "Function"  . . . . . . . . . . .  5

   3.    Stages in a Document's Lifecycle . . . . . . . . . . . . . .  6
   3.1.  Stage: Call for Adoption . . . . . . . . . . . . . . . . . .  6
   3.2.  Stage: Working Group Document  . . . . . . . . . . . . . . .  8
   3.3.  Stage: Working Group Last Call . . . . . . . . . . . . . . . 10
   3.4.  Stage: Shepherd Writeup Underway . . . . . . . . . . . . . . 11
   3.5.  Stage: AD Review . . . . . . . . . . . . . . . . . . . . . . 13
   3.6.  Stage: IETF Last Call  . . . . . . . . . . . . . . . . . . . 14
   3.7.  Stage: Waiting for AD Go-Ahead . . . . . . . . . . . . . . . 15
   3.8.  Stage: IESG Evaluation . . . . . . . . . . . . . . . . . . . 15
   3.9.  Stage: Approved by the IESG  . . . . . . . . . . . . . . . . 17
   3.10. Stage: In RFC Editor Queue . . . . . . . . . . . . . . . . . 17
   3.11. Stage: AUTH48  . . . . . . . . . . . . . . . . . . . . . . . 18
   3.12. Stage: Published . . . . . . . . . . . . . . . . . . . . . . 19

   4.    Some Final Notes . . . . . . . . . . . . . . . . . . . . . . 20

   5.    Security Considerations  . . . . . . . . . . . . . . . . . . 21

   6.    IANA Considerations  . . . . . . . . . . . . . . . . . . . . 22

   7.    References . . . . . . . . . . . . . . . . . . . . . . . . . 23
   7.1.  Normative References . . . . . . . . . . . . . . . . . . . . 23
   7.2.  Informative References . . . . . . . . . . . . . . . . . . . 23

         Author's Address . . . . . . . . . . . . . . . . . . . . . . 24

Leiba                   Expires February 3, 2013                [Page 2]
Internet-Draft        Extended Document Shepherding          August 2012

1.  Introduction

   RFC 4858 talks about "Document Shepherding from Working Group Last
   Call to Publication" [RFC4858].  There's a significant part of a
   document's life that happens before Working Group Last Call,
   starting, really, at the time a working group begins discussing a
   version of the idea that's been posted as an individual draft.  It
   seems reasonable and helpful to begin shepherding at the time there's
   a call for adoption as a working group document, and this document
   gives one Area Director's view of how that extended shepherding
   function might work, and what tasks might be involved throughout the
   document's lifecycle.

   It has been very common to see documents -- including some that I
   have authored, and some for which I have been the Responsible Chair
   -- progress far too slowly, sometimes languishing for many months and
   even for years due to neglect.  Sometimes a working group will
   intentionally set a document aside, put it on a back burner while it
   works on more pressing things.  But it's often *not* intentional, and
   the document sits around because of lack of follow-through, waking up
   occasionally when someone realizes that the last version has expired
   and an IETF meeting is coming up soon.

   We would really prefer to process documents efficiently, ensuring
   that whatever happens is intentional: that documents are set aside
   only when it makes sense to do so, and that active documents move
   forward in the process, with someone assigned to make sure that
   happens.

   This document suggests specific tasks a Working Group Chair should be
   doing or delegating in order to maintain forward progress,
   accountability, and quality control on a working group document.  It
   adds to what's in RFC 4858, intending to extend it, not replace it.
   Major extensions involve assigning a Shepherd and defining specific
   tasks earlier in a document's life, and possibly delegating Document
   Shepherd tasks to a Shepherd who is neither a Chair nor the Working
   Group Secretary (consistent with the IESG Statement on Document
   Shepherds [Stmt]).

   By providing summaries in each section of the tasks expected at that
   stage in the document's lifecycle, I hope to make this an easy
   reference and checklist for Working Group Chairs and Document
   Shepherds.

1.1.  Notational Conventions

   Because this document is specifically one individual's thoughts on
   this matter, it's worth pointing out that the document makes no

Leiba                   Expires February 3, 2013                [Page 3]
Internet-Draft        Extended Document Shepherding          August 2012

   process changes and there is no normative language here.

   I use Initial Capitals in some terms, such as "Document Shepherd", to
   indicate that those terms represent formal roles in the management
   model I'm describing.

Leiba                   Expires February 3, 2013                [Page 4]
Internet-Draft        Extended Document Shepherding          August 2012

2.  The Document Shepherd as a "Function"

   This document looks at the Document Shepherd as a "function", rather
   than as a single person.  The Document Shepherd Function has a set of
   tasks that need to be performed, but the tasks do not all have to be
   performed by one individual.

   While, ultimately, it is the responsibility of the Working Group
   Chairs to ensure that the shepherding tasks get done, the Chairs do
   not have to do all those tasks by themselves.  From Section 6.1 of
   the Working Group Guidelines and Procedures [RFC2418]:

      The Working Group Chair is concerned with making forward progress
      through a fair and open process, and has wide discretion in the
      conduct of WG business.  The Chair must ensure that a number of
      tasks are performed, either directly or by others assigned to the
      tasks.

   This document proposes an extended set of Document Shepherd tasks,
   well beyond those covered in RFC 4858.  In many cases it will be
   reasonable to assign the entire Document Shepherd Function to one
   person (to a Chair or to a non-chair delegate), but in many other
   cases the Chairs will likely choose to delegate parts of that
   function and keep other parts for themselves.  In any case, the
   Chairs remain responsible for the management of the working group;
   they are whom the Area Director will come to if something goes wrong
   or things fail to make progress.

   As I talk, then, about what the "Document Shepherd" does, understand
   that the individual doing each particular task will be the one
   assigned that task as the work on a particular document is laid out.
   When I say that the Shepherd should do a task in consultation with
   the Chairs, that's automatically true when it's already a Chair who's
   doing it.

   And this bears repeating, so I will say it more than once here:
   Nothing in this document is suggesting that the Working Group Chairs
   abdicate any responsibility.  They have the final responsibility for
   managing each document's progress and for managing the working group
   in general.  Any Chair who chooses to delegate some of this
   responsibility must still ensure that it's carried out properly.  And
   any Chair who does not feel comfortable delegating any of this should
   not do so.

Leiba                   Expires February 3, 2013                [Page 5]
Internet-Draft        Extended Document Shepherding          August 2012

3.  Stages in a Document's Lifecycle

   From the time a working group is asked to take on a document as one
   of its work items, the document will go through a number of stages:

   1.   Call for Adoption
   2.   Working Group Document
   3.   Working Group Last Call
   4.   Shepherd Writeup Underway
   5.   AD Review
   6.   IETF Last Call
   7.   Waiting for AD Go-Ahead
   8.   IESG Evaluation
   9.   Approved by the IESG
   10.  In RFC Editor Queue
   11.  AUTH48
   12.  Published

   Through most of those stages steps will have to be taken, tasks will
   need to be performed, to make sure the document moves forward, that
   consensus is reached, that the right reviews are done, that updates
   are made, that consensus still holds after significant changes, and
   so on.  That set of tasks comprises the Document Shepherd Function.

   The following sections will discuss some of the tasks needed at each
   stage, and will suggest how Working Group Chairs might handle those
   tasks and their delegation -- how the Document Shepherd Function
   might work.  The details will vary, depending upon how each working
   group is managed, but what follows should be a good example, and will
   provide a basis for adaptation.  And see also Section 3 of [RFC4858].

3.1.  Stage: Call for Adoption

   At the point that the working group begins considering adoption of a
   document, the Working Group Chairs have some decisions to make.  This
   is the time to choose a Responsible Chair for the document, much as
   it will eventually have a Responsible Area Director later in its
   life.  The Responsible Chair will be the one who oversees the
   Document Shepherd Function and has primary responsibility for making
   sure that everything gets done.

   The Responsible Chair should then (perhaps in consultation with the
   other Chair(s), depending upon the Chairs' agreement about division
   of work) decide how much of the Document Shepherd Function to handle
   herself, and which pieces, if any, to delegate.  Examples might be as
   follows:

Leiba                   Expires February 3, 2013                [Page 6]
Internet-Draft        Extended Document Shepherding          August 2012

   o  The Responsible Chair will be the sole Document Shepherd.

   o  The Responsible Chair will be the Document Shepherd through the
      end of the Working Group Document stage, and will appoint a non-
      chair Shepherd during that stage to handle subsequent shepherding
      tasks (similar to what's set out in RFC 4858).

   o  The Responsible Chair will appoint a non-chair Shepherd to handle
      the early shepherding tasks, and the Responsible Chair will take
      over the Document Shepherd tasks for Working Group Last Call and
      beyond (the converse of the previous example).

   o  The Responsible Chair will appoint a non-chair Shepherd to handle
      all shepherding tasks from start to end.  The delegate will work
      closely with the Responsible Chair, heavily supervised (perhaps
      this is a training situation).

   o  The Responsible Chair will appoint a non-chair Shepherd to handle
      all shepherding tasks from start to end.  The delegate will report
      to the Responsible Chair, and will be supervised at certain key
      points.

   o  The Responsible Chair will appoint a non-chair Shepherd to handle
      all shepherding tasks autonomously (perhaps for a very experienced
      Shepherd, well trusted by the Chairs).

   And so on... there may be many combinations, many levels of
   supervision vs autonomy, many ways to divide the work.  It's also
   possible to delegate to more than one non-chair Shepherd at different
   stages, though I don't think that's a good idea -- the continuity and
   centralized responsibility of making it one other person (supervised
   by one Responsible Chair) seems best.

   Some Chairs may prefer to handle all tasks themselves, because, after
   all, they remain responsible for their successful completion.  Yet
   there's a lot to be gained by delegating much of the work.
   Delegating work and giving a degree of responsibility to relatively
   more junior participants gets people more closely engaged with the
   working group and with the IETF.  Giving significant responsibility
   can be an excellent training exercise, preparing participants to take
   on future roles as Working Group Chairs.  And in a busy working
   group, offloading work from the Chairs to senior, experienced people
   (perhaps former Chairs or former ADs) can prevent the Chairs from
   being overcommitted, enabling the work to move forward much more
   efficiently.

   And, of course, a non-chair Shepherd can and should consult with the
   Responsible Chair whenever she feels the need, and certainly whenever

Leiba                   Expires February 3, 2013                [Page 7]
Internet-Draft        Extended Document Shepherding          August 2012

   issues arise of which the Chairs should be aware, or about which the
   Shepherd needs advice or other help.

   Once it is determined who will handle the Document Shepherd tasks,
   the Shepherd needs to do the actual adoption process.  The details
   will vary based on how the particular working group is run, but a
   typical process will start with posting a call for adoption to the
   working group mailing list, pointing to the individual draft that's
   being considered.  There'll be a comment period for adoption
   discussion, after which the Shepherd will, based on working group
   discussion make a judgment and announce the result to the list.

   Assuming that the document was adopted, the Chairs will appoint one
   or more Editors for the working group version of the document (these
   are often, but not always, the same people who wrote the individual
   version, and the Chairs should put some thought into who the right
   Editors should be), and will handle the datatracker updates (for
   which Chair access is required).  The Chairs should not forget to
   record the name and email address of the Document Shepherd in the
   tracker -- this will ensure that the Shepherd is copied on necessary
   email later.

   In summary, the tasks at the Call for Adoption stage might be as
   follows:

   1.  Chairs: Select a Responsible Chair to handle the document.
   2.  Responsible Chair: Decide on a work/delegation plan.
   3.  Responsible Chair: Possibly appoint a non-chair Shepherd; else
       the Responsible Chair becomes the Shepherd.
   4.  Shepherd: Make the call for adoption; set deadlines and schedule.
   5.  Shepherd: Announce the result; Chairs: appoint Document Editor(s)
       for the WG document.
   6.  Chairs: Update the datatracker; approve -00 version submission.

3.2.  Stage: Working Group Document

   Once a -00 version is posted, the Shepherd's primary task is to keep
   the document moving forward: keeping discussion going, making sure
   issues are tracked and document updates are posted, and helping
   things toward consensus.  Let's not downplay the importance of active
   management here: this is where things so often fall short, what
   causes documents to take *years* to complete.  The Shepherd should
   not rush discussions that are useful, but the Shepherd should make
   sure that things don't get lost in the forest either.

   The Chairs will decide how the working group should be managed, and
   any non-chair Shepherd should be working with the Chairs at this
   stage, communicating any difficulties and getting help with issue

Leiba                   Expires February 3, 2013                [Page 8]
Internet-Draft        Extended Document Shepherding          August 2012

   resolution when needed.  Tools such as the issue tracker and the
   working group wiki, which are available to every working group, may
   be helpful here -- particularly if many issues come up, if issues are
   often taking a long time to be resolved, or if the same issues tend
   to come up repeatedly.  The issue tracker can be used to record not
   just the issues themselves, but significant parts of the discussion
   on both sides, helping to make it clearer what the resolution was and
   why, and whether a particular request to re-open a closed issue
   really involves new points or is just a re-hash.

   Discussions need to be steered, with a goal of avoiding unproductive,
   circular discussions, re-hashing of old arguments, and tangential
   discussions that go "off into the weeds".  Discussions also often
   need to be prodded.  Lulls can be fine, but when it looks like
   nothing is happening for a while, remind the participants of open
   issues, ask for reviews of updated document versions or of recent
   changes that don't seem to have been discussed.  It's often useful to
   make specific requests of participants off list.  The goal here is to
   ensure that rough consensus is reached on the document, covering as
   much of the document as possible, and certainly covering the key
   points.

   Document Editors need to be prodded as well.  We're all volunteers,
   and many of us are working on a lot of things.  A particular document
   can fall off to the side for a long while.  It's best to avoid the
   trap of getting updates only before each IETF meeting, just in time
   to beat the submission cutoff.  If updates aren't posted fairly
   promptly after a set of issues is resolved, ask the Editors when
   they'll be able to get changes rolled into a new document version.
   Check that the Editors are following working group consensus as they
   make their updates.

   Even with plenty of prodding and reminding and steering, it happens
   that a document simply can't be finished and abandoning it needs to
   be considered.  Perhaps there's no longer the interest there was at
   adoption.  Perhaps the document has been overtaken by other events.
   Or perhaps there's too much controversy over it, and rough consensus
   just isn't going to happen.  The Shepherd should consult with the
   Chairs to decide whether the working group should stop work on the
   document.

   The Shepherd will know when the document is moving from this stage
   into the next, and when she needs to shift the focus into preparation
   for last call and for getting the document to the AD.

   In summary, the tasks for the Shepherd at the Working Group Document
   stage might be as follows:

Leiba                   Expires February 3, 2013                [Page 9]
Internet-Draft        Extended Document Shepherding          August 2012

   1.  Work with the Chairs to understand the desired mechanism for
       managing discussions.
   2.  Watch the discussions as they unfold; call out and record
       specific issues that come up.
   3.  Steer the discussion when necessary.
   4.  Prod the discussions when necessary.
   5.  Prod the Document Editors when necessary.
   6.  Use appropriate tools, such as issue trackers and wikis.
   7.  Determine when it's time to start wrapping things up and moving
       to Working Group Last Call.
   8.  Alternatively, determine that it's not possible to move the
       document forward, and the Chairs need to consider abandoning it.

3.3.  Stage: Working Group Last Call

   When any contentious issues have been resolved and the document has
   had a good level of review, the Shepherd should start looking at when
   it's time to wrap things up, have a last call within the working
   group, and get the document ready to send to the Responsible AD.
   What needs to be done now is largely the same as in the Working Group
   Document stage, but with a particular aim of getting remaining issues
   closed and making sure that discussions are tightly focused.  Where
   veering off to explore things that might be added to the document was
   a fine thing to do in the earlier stages, this is the time to say
   that the document is "feature complete", and to keep discussions
   reined in.

   Working Group Last Call is a recommended step, though not a required
   one, and most working groups do issue a formal "last call" before
   sending the document to the Responsible AD.  The Shepherd can take
   the responsibility of issuing that message and of analyzing comments
   to determine whether things are ready to go ahead.

   This is also the time to make sure that important reviews are done.
   Ask for reviews from key working group contributors, and check
   whether any external reviews are needed.  External reviews might
   include expert reviews for IANA registrations, reviews of formal
   specifications such as MIBs, XML, and ABNF, and reviews from experts
   in other areas (does the document need to be checked by a web
   services expert, a security expert, a DNS expert?).  Some of this
   will happen automatically later -- there will be a Security
   Directorate review at some point, for example -- but it's easier on
   the Document Editors and the working group if you know something is
   particularly necessary and arrange for it sooner.  The IANA folks are
   willing to do an early review of the IANA actions at this stage, so
   consider asking for that if the document has a large or unusually
   involved set of IANA actions.

Leiba                   Expires February 3, 2013               [Page 10]
Internet-Draft        Extended Document Shepherding          August 2012

   The shepherd writeup, which can be found in the IESG section of the
   IETF web site [Writeup], is a good reference to the Shepherd for
   making sure the necessary bits are being covered, so this is also a
   good time to start the writeup.  It will be finished later, when the
   document is ready to be sent to the Responsible AD, but getting a
   start now can be helpful, and will serve as a reminder to ask the
   questions and request the reviews that will later be needed.

   The tasks for the Shepherd at the Working Group Last Call stage might
   be as follows:

   1.  Issue an official "Working Group Last Call" message on the list,
       with a reasonable deadline given.
   2.  Closely watch the reviews and discussions at this stage, and make
       sure they are focused on closing final issues and giving the
       document final review.
   3.  Specifically ask (perhaps off list) for key reviews.
   4.  Begin preparing the shepherd writeup, and request any external
       reviews that will be needed.
   5.  Analyze the results of Working Group Last Call and get final
       updates from the Document Editors.

3.4.  Stage: Shepherd Writeup Underway

   Working Group Last Call is over, and the Shepherd has determined that
   any issues that came out of that have been adequately resolved.  It's
   time to finish up the shepherd writeup, dotting the last of the "i"s
   and crossing the final "t"s.

   Remember that the shepherd writeup serves two major purposes:
   1.  It ensures that some key items have been double checked.
   2.  It provides information to the IESG, which is useful during IESG
       Evaluation.
   For the first purpose, "yes" and "no" are reasonable answers to some
   of the writeup questions.  In particular, a number of the questions
   ask if something has been checked, or it some abnormal situation
   exists.  "Yes" to confirm that the check has been made, or "no" to
   state that the abnormal situation does not exist are fine responses.
   Of course, if the answer to the first is "no" or to the second is
   "yes", further explanation is necessary.  In other words, "yes" could
   be a reasonable answer by itself, but "no" would require more by way
   of explanation... or vice versa.

   But for the second purpose, providing useful information to the IESG,
   yes/no responses are of little or no use.  Questions about the
   working group process and discussions are especially looking for some
   sort of narrative information.  Don't just say that there was much
   discussion that eventually reached consensus, or that there were a

Leiba                   Expires February 3, 2013               [Page 11]
Internet-Draft        Extended Document Shepherding          August 2012

   number of controversial points that were resolved -- say something
   about the discussion, talk a bit about the controversies.  If there
   were particular points that simply did not get any discussion but
   probably should have, say that.

   Knowing the trouble spots, and the strong and weak points of the
   discussion and consensus, will allow the IESG to properly evaluate
   the document.  That can avoid the IESG's revisiting issues that were
   already done to death in the working group.  It's common to have
   DISCUSS positions in which ADs are questioning a point that the
   working group discussed at length, and a brief explanation in the
   writeup could have avoided having it come up again then.

   When the Shepherd has the writeup done, a non-chair Shepherd should
   consult with the Chairs to make sure they're happy with it and agree
   with what's in it.  The Chairs will then need to make some
   datatracker updates that only they have authorization for: they will
   upload the writeup to the tracker and change the document state.

   Finally, the Shepherd (or the Responsible Chair) will email the
   writeup to the Responsible AD, with CC to the IESG Secretary, asking
   that the document be considered for publication.  Including the
   writeup in email, as well as in the tracker, and including the IESG
   Secretary on CC, are both meant to ensure that nothing gets lost and
   that a record is kept of the publication request.  And as RFC 4858
   says, the Shepherd should also email the writeup to the working
   group's mailing list, so the working group is aware of it.  The
   writeup will be public anyway, because it will be in the datatracker,
   so it can only help the open process to make it more visible to the
   working group whose work it reflects.

   See also Section 3.1 of [RFC4858], but note that the writeup template
   has changed significantly since the version in that document.  The
   current writeup is in the IESG section of the IETF web site
   [Writeup].

   The tasks at the Shepherd Writeup Underway stage might be as follows:

   1.  Shepherd: Complete the shepherd writeup and send it to the Chairs
       for approval.
   2.  Chairs: Work with the Shepherd to finalize the writeup.
   3.  Chairs: Put the writeup into the datatracker, and change the
       tracker document state to the appropriate one for requesting
       publication.
   4.  Shepherd: Send the writeup to the Responsible AD (and the IESG
       Secretary) and request publication.

Leiba                   Expires February 3, 2013               [Page 12]
Internet-Draft        Extended Document Shepherding          August 2012

3.5.  Stage: AD Review

   The next stage in the process is up to the Responsible Area Director,
   and the Document Shepherd has but one easy task: make this stage as
   short as possible.  The Responsible AD or the IESG Secretary will do
   some document state changes in the datatracker (to Publication
   Requested and then to AD Review), and the AD will review the document
   and either request IETF Last Call or respond to the authors (and, we
   hope, to the Shepherd as well; here's where it was useful to have put
   the Shepherd's email address in the tracker) with review comments and
   suggested changes.  In the latter case, the document's state will
   change to "AD Review, Revised I-D Needed".

   The Shepherd needs to watch for the key state changes and the AD's
   review.  If the review doesn't happen in a reasonable time --
   allowing for a busy AD's schedule and remembering that the document
   you're shepherding isn't the only one on the AD's docket -- send a
   reminder... perhaps as a question, "How is the review on
   draft-ietf-frobozz-xyzzy coming?"  Use your judgment to decide how
   long to wait, but most ADs will appreciate a reminder here and there
   as long as it's not at the level of "pestering".

   Once the review comes in, make sure the Document Editors are on top
   of it and respond in a timely manner.  Make sure that the working
   group is consulted on issues brought up in the review that are
   significant enough to require the working group's engagement in the
   response.  Editorial tweaks can arguably be handled by the editors
   alone at this point, and changes to the protocol clearly need to go
   back to the working group, but many issues fall in between, and good
   judgment is important.

   Many documents spend *months* in AD Review state, largely because of
   lack of good shepherding.  It may look like there's only one major
   task here, but it's an important one.  Please don't give it short
   shrift.

   See also Section 3.2 of [RFC4858].

   The tasks for the Shepherd at the AD Review stage might be as
   follows:

   1.  Make sure the AD reviews the document in a timely manner, and
       send occasional reminders as needed.
   2.  Make sure the Document Editors respond to the review in a timely
       manner, and poke them as well, as needed.
   3.  Keep the dialogue going between the Responsible AD and the
       editors until all issues have been dealt with and the document is
       ready for the next stage.

Leiba                   Expires February 3, 2013               [Page 13]
Internet-Draft        Extended Document Shepherding          August 2012

   4.  See to it that issues are brought back before the working group
       if they are significant enough to require it.

3.6.  Stage: IETF Last Call

   Once the Responsible AD is satisfied that the document is ready to
   move ahead, she will put it in Last Call Requested state.  That
   prompts the IESG Secretary to send out the Last Call announcement and
   to put the document into "In Last Call".

   The Shepherd's job in the IETF Last Call stage is very similar to
   what's needed in AD Review.  Start by watching for last-call
   comments, including various special reviews.  Reviews will come in
   from the Security Directorate and the General Area Review Team
   (GenART), and some may also come from other review teams and
   directorates.  Reviews might also be coming in at this stage, if they
   haven't already, that were specifically requested by the Shepherd
   (see the Working Group Last Call stage).

   The Shepherd needs to make sure all of those reviews are addressed by
   the document editors, and that the specifically requested reviews get
   done.  "Addressed" doesn't mean that every change asked for in every
   last-call comment needs to be made.  Sometimes, a reasonable response
   is to say that the working group discussed the point, and the
   document correctly reflects its consensus -- that is, the working
   group disagrees with the last-call comment.  At other times, it's
   reasonable to disagree with the reviewer and look for any other
   support for the reviewer's position.  Rough consensus can be a tricky
   thing, but the bottom line is that all comments need at least be
   considered.  Directorate and review-team reviews, in particular,
   require acknowledgment and response (though they, too, can be
   disagreed with).

   During Last Call, IANA will review the document's IANA
   Considerations, will respond with their summary of what they think
   needs to be done by IANA after the document is approved, and will ask
   any questions they have.  The Shepherd should watch for this review
   and make sure that the actions IANA proposes are correct and that any
   questions they have are answered.  See also Section 4 of [RFC4858].

   Different Responsible ADs will have different preferences for whether
   documents in IETF Last Call should be updated while they're still in
   that state.  The Shepherd should check with the AD and advise the
   Document Editors.  Sometimes it's best to keep a stable version
   throughout last-call review; other times it's better to get changes
   posted quickly, so the same issues aren't brought up by multiple
   reviewers.  Work with the AD and the editors to handle this.

Leiba                   Expires February 3, 2013               [Page 14]
Internet-Draft        Extended Document Shepherding          August 2012

   The tasks for the Shepherd at the IETF Last Call stage might be as
   follows:

   1.  Monitor the last-call comments, and make sure that specifically
       requested reviews arrive.
   2.  Make sure the Document Editors respond to all reviews and
       comments in a timely manner.
   3.  Keep the dialogue going between the community and the editors
       until all issues have been dealt with.
   4.  See to it that issues are brought back before the working group
       if they are significant enough to require it.

3.7.  Stage: Waiting for AD Go-Ahead

   When Last Call completes, the tracker state for the document will
   automatically go to "Waiting for AD Go-Ahead".  This is the
   Shepherd's signal to re-check the comments from last call, to make
   sure an updated I-D is posted that is ready for IESG Evaluation, and
   to let the Responsible AD know when everything is set.  The AD will
   be watching for this as well, and in many cases the Shepherd won't
   need to be involved here.  But, as in the other stages, it's the
   Shepherd's responsibility to keep an eye on things and make sure
   what's needed gets done.

   The tasks for the Shepherd at the Waiting for AD Go-Ahead stage might
   be as follows:

   1.  Make sure a new I-D is posted with the latest changes, unless
       there were no changes required.
   2.  Inform the Responsible AD that all changes have been
       incorporated, and that the document is ready for IESG Evaluation.
   3.  Update the Shepherd writeup if anything has come up during Last
       Call that the IESG should know about.

3.8.  Stage: IESG Evaluation

   As the ADs do their reviews they will record ballot positions on the
   document.  Ballot positions can be one of "Yes", "No Objection",
   "Discuss", and "Abstain" (there's also "Recuse" for cases when the AD
   has a conflict of interest with the document (if, for example, the AD
   is one of the authors/editors)).  Any of these ballot positions can
   be accompanied by non-blocking review comments, and "Discuss" also
   comes with blocking comments in addition -- these must be resolved to
   the satisfaction of the Discussing AD before the document can be
   approved by by the IESG.  The document will be scheduled for a bi-
   weekly "telechat" (at the time of this writing they're on Thursdays),
   and it will be approved then or left in one of several follow-up
   states.

Leiba                   Expires February 3, 2013               [Page 15]
Internet-Draft        Extended Document Shepherding          August 2012

   The IESG Evaluation period is normally somewhere between one and
   three weeks, though it can be as little as a day or two in unusual
   circumstances.  Be aware, though, that there's usually a burst of
   review activity in the final few days before the telechat, and expect
   most reviews to come in then.

   The IESG Evaluation comments and DISCUSS positions will be copied to
   the Document Shepherd (again, it was important to have put the
   Shepherd's email address in the tracker), and the Shepherd should be
   watching for them and making sure that the Document Editors respond
   promptly -- at this stage, quick turnaround is most important.
   Sometimes the Shepherd or Chairs might respond to AD questions and
   comments themselves, and sometimes they might leave it to the
   editors.  The process works best when everyone engages, with the goal
   of resolving the issues brought up by the ADs as efficiently as
   possible.

   A word about DISCUSS positions: Many Document Editors treat these as
   adversarial situations created by aggressive ADs, but that's
   generally not the intent.  First, many DISCUSSes are resolved quickly
   and easily by a round of email with the Discussing AD, and that's as
   it should be: the point is that the AD has something to "discuss"
   with those responsible for the document before she can agree to the
   document's approval.  Second, many DISCUSSes that do take more
   effort, often significant back and forth with the Discussing AD and
   other IESG members, result in a better document, having cleared up
   some significant confusion or having closed a hole in the
   specification that was missed at earlier stages.  Please try to treat
   the situation as one in which everyone is looking to make the
   document better.

   Most often, ADs who record DISCUSS positions (and review comments)
   are quite responsive, and will work with the Editors and Shepherd to
   get everything resolved.  Sometimes, though, a busy AD can find
   herself lacking the time to respond.  The Shepherd should keep the
   ADs honest, pushing for quick responses.  In earlier stages, too-
   frequent reminders might be considered unreasonable, but at this
   stage discussion should be fairly brisk, and a delay of more than a
   couple of days should be unusual, on either side.

   The IESG web site has more details about IESG ballot positions
   [Ballot] and about IESG DISCUSS ballots in particular [Discuss].  And
   see also Section 3.3 of [RFC4858].

   The tasks for the Shepherd at the IESG Evaluation stage might be as
   follows:

Leiba                   Expires February 3, 2013               [Page 16]
Internet-Draft        Extended Document Shepherding          August 2012

   1.  Keep track of the DISCUSS positions and review comments by the
       IESG.
   2.  Make sure all comments are addressed, and help the discussions of
       DISCUSS positions reach closure.
   3.  Keep both the Document Editors and the Discussing AD engaged in
       the resolution of the issues.

3.9.  Stage: Approved by the IESG

   Once the document has been on a telechat, any necessary revised
   versions have been posted, and all DISCUSS positions are "cleared",
   the Responsible AD (or the IESG Secretary) will put the document into
   the "Approved, Announcement to be Sent" state.  If there's any
   follow-up that needs to be done, it will be held with a sub-state
   (usually "Point Raised, Writeup Needed"), and the Shepherd should
   make sure whatever final checks that are needed get done, and that
   the Responsible AD clears the sub-state and informs the IESG
   Secretary.

   At this stage, it's usually a matter of making sure that the latest
   version of the document adequately addresses the non-blocking
   comments by the ADs, and that any necessary RFC Editor notes are
   entered.  The Shepherd should work with the Responsible AD to
   understand what still needs to be done, and to make sure it happens.

   The tasks for the Shepherd at the Approved by the IESG stage might be
   as follows:

   1.  Work with the Responsible AD to understand what still needs to be
       addressed.
   2.  Double-check the IANA actions and the RFC Editor notes, and
       follow up on any errors or omissions.
   3.  Make sure the Document Editors and the Responsible AD move the
       document to the final Approved state.

3.10.  Stage: In RFC Editor Queue

   Shortly after the approval announcement is sent out, the document
   will go into the RFC Editor queue, and the Shepherd will start seeing
   it pass through a number of RFC Editor states.  For most of this, the
   Shepherd need do nothing, and is just waiting for the AUTH48 state.
   This will usually take between a few weeks and a few months,
   depending upon many factors, but it can be held up indefinitely by
   normative references to documents that are not yet ready for
   publication.  Be aware of what the document is waiting for, and
   otherwise just wait.  If anything looks odd, ask the Responsible AD
   to check.

Leiba                   Expires February 3, 2013               [Page 17]
Internet-Draft        Extended Document Shepherding          August 2012

   The tasks for the Shepherd at the In RFC Editor Queue stage might be
   as follows:

   1.  Sip tea or drink beer or wine, and wait for AUTH48.
   2.  Talk to the Responsible AD if something doesn't look right.

3.11.  Stage: AUTH48

   AUTH48 is an RFC Editor state that occurs when the RFC Editors have
   done their final edits on the document before publication.  It's
   meant to represent a 48-hour period in which the AUTHors can review
   what the RFC Editor has changed, have a final look at the document,
   and make sure it's ready to go.

   AUTH48 is a critical document state; do not downplay its importance.
   At this stage, the Shepherd should re-review the document, paying
   special attention to recent changes.  The Document Editors must do
   the same, and a response from every Author/Editor listed at the top
   of the document is required before the RFC Editor will finish the
   publication process.  The Document Shepherd needs to make sure that
   the Editors all respond, and should take the lead in prompting them
   early and frequently.  Remember that "AUTH48" is meant to refer to 48
   hours, not 48 days.  Don't let this drag on.

   The RFC Editor will often have questions that the Authors/Editors
   need to answer.  The Document Editors often have minor changes to
   insert at this point.  The Shepherd should consider those answers,
   those changes, and the changes the RFC Editor has made leading into
   AUTH48, and assess (in consultation with the Chairs and the
   Responsible AD) whether any changes need to be passed back to the
   working group -- remember that the document has been approved by
   rough consensus of the working group, and then of the IETF as a
   whole, and the final, published version must continue to reflect that
   consensus.

   It's unusual for there to be significant controversy at this stage,
   but it's been known to happen.  Sometimes a change or a question by
   the RFC Editor will raise a question with the Document Editors that
   had not come up before.  Sometimes, the right answer to one of those
   questions will be more than just editorial, and sometimes it will
   involve a significant technical decision.  Decisions of that nature
   should not be made by the Document Editors alone, and the Shepherd
   should arrange to have them discussed by the working group.

   Most of the time, though, this stage will run smoothly, the Document
   Editors will respond to the AUTH48 messages with a minimum of
   prodding, and the RFC Editor will announce their happiness and
   proceed with the publication process.

Leiba                   Expires February 3, 2013               [Page 18]
Internet-Draft        Extended Document Shepherding          August 2012

   See also Section 5 of [RFC4858].

   The tasks for the Shepherd at the AUTH48 stage might be as follows:

   1.  Monitor the AUTH48 process and make sure all questions are
       answered and all Authors/Editors respond as needed.
   2.  Assess whether any issues that come up are significant enough to
       need review by the working group.

3.12.  Stage: Published

   We're done.  The RFC Editor has published the document, and the RFC
   announcement has been made.  Many thanks to the Shepherd for having
   seen it through and for helping to assure a high quality document.

Leiba                   Expires February 3, 2013               [Page 19]
Internet-Draft        Extended Document Shepherding          August 2012

4.  Some Final Notes

   I've outlined a Document Shepherding Function, above, in a lot of
   detail, so let's put the executive summary back here:

   What it all boils down to is setting up one person who takes
   responsibility for following the progress of a document from Call for
   Adoption through Publication, staying actively involved with managing
   the discussion and issue resolution at every stage, and making sure
   the necessary participants are responsive and that things don't
   languish from inattention.

   And again, Working Group Chairs may delegate all or part of this
   function to a non-chair participant, or retain all responsibility for
   it themselves.  In the latter case, I don't think what I'm describing
   here is anything different to what should be happening already.
   Setting it out as clear tasks and a set of stages in the document's
   lifecycle will make it easier to recognize what needs to be done
   when, and to handle delegation when the Chairs choose to delegate.

Leiba                   Expires February 3, 2013               [Page 20]
Internet-Draft        Extended Document Shepherding          August 2012

5.  Security Considerations

   This document describes an individual's suggestion about IETF
   process, and is entirely unrelated to security in any way.

   [The RFC Editor is asked to remove either this section or this
   paragraph, depending upon publication policy.]

Leiba                   Expires February 3, 2013               [Page 21]
Internet-Draft        Extended Document Shepherding          August 2012

6.  IANA Considerations

   No IANA actions are requested by this document, and the RFC Editor is
   asked to remove this section before publication.

Leiba                   Expires February 3, 2013               [Page 22]
Internet-Draft        Extended Document Shepherding          August 2012

7.  References

7.1.  Normative References

   [RFC2418]  Bradner, S., "IETF Working Group Guidelines and
              Procedures", BCP 25, RFC 2418, September 1998.

   [RFC4858]  Levkowetz, H., Meyer, D., Eggert, L., and A. Mankin,
              "Document Shepherding from Working Group Last Call to
              Publication", RFC 4858, May 2007.

7.2.  Informative References

   [Ballot]   IESG, "IESG Ballot Procedures", May 2009,
              <http://www.ietf.org/iesg/voting-procedures.html>.

   [Discuss]  IESG, "DISCUSS Criteria in IESG Review", July 2007,
              <http://www.ietf.org/iesg/statement/
              discuss-criteria.html>.

   [Stmt]     IESG, "IESG Statement on Document Shepherds",
              October 2010, <http://www.ietf.org/iesg/statement/
              document-shepherds.html>.

   [Writeup]  IESG, "Working Group Submission Writeup", February 2012,
              <http://www.ietf.org/iesg/template/doc-writeup.txt>.

Leiba                   Expires February 3, 2013               [Page 23]
Internet-Draft        Extended Document Shepherding          August 2012

Author's Address

   Barry Leiba
   Huawei Technologies

   Phone: +1 646 827 0648
   Email: barryleiba@computer.org
   URI:   http://internetmessagingtechnology.org/

Leiba                   Expires February 3, 2013               [Page 24]