Skip to main content

Early Review of draft-ietf-bess-mvpn-msdp-sa-interoperation-05
review-ietf-bess-mvpn-msdp-sa-interoperation-05-rtgdir-early-jia-2021-04-29-00

Request Review of draft-ietf-bess-mvpn-msdp-sa-interoperation
Requested revision No specific revision (document currently at 08)
Type Early Review
Team Routing Area Directorate (rtgdir)
Deadline 2021-04-28
Requested 2021-04-13
Requested by Martin Vigoureux
Authors Zhaohui (Jeffrey) Zhang , Lenny Giuliano
I-D last updated 2021-04-29
Completed reviews Rtgdir Early review of -00 by He Jia (diff)
Rtgdir Early review of -05 by He Jia (diff)
Opsdir Last Call review of -05 by Qin Wu (diff)
Assignment Reviewer He Jia
State Completed
Request Early review on draft-ietf-bess-mvpn-msdp-sa-interoperation by Routing Area Directorate Assigned
Posted at https://mailarchive.ietf.org/arch/msg/rtg-dir/H_xNQVeOR_3DfMmemColQEocnzw
Reviewed revision 05 (document currently at 08)
Result Ready
Completed 2021-04-28
review-ietf-bess-mvpn-msdp-sa-interoperation-05-rtgdir-early-jia-2021-04-29-00
Hello,

I have been selected to do a routing directorate "early" review of this draft.
https://datatracker.ietf.org/doc/draft-ietf-bess-mvpn-msdp-sa-interoperation/

The routing directorate will, on request from the working group chair, perform
an "early" review of a draft before it is submitted for publication to the
IESG. The early review can be performed at any time during the draft's lifetime
as a working group document. The purpose of the early review depends on the
stage that the document has reached.

As this document is in working group last call, my focus for the review was to
determine whether the document is ready to be published. Please consider my
comments along with the other working group last call comments

For more information about the Routing Directorate, please see
?http://trac.tools.ietf.org/area/rtg/trac/wiki/RtgDir

Document draft-ietf-bess-mvpn-msdp-sa-interoperation-05.txt
Reviewer: Jia He
Review Date: 28 April 2021
Intended Status: Standards Track

Summary

The document clearly describes the problem and specifies the MVPN/MSDP SA
interoperation procedures. IMHO, this documents is ready to proceed to the IESG.

Comments

I did the rtgdir early review of this draft at version-00 and the comments
raised at that time are already captured. No further comments.

B.R.
Jia