Last Call Review of draft-ietf-v6ops-conditional-ras-04
review-ietf-v6ops-conditional-ras-04-genart-lc-haddad-2018-05-25-00

Request Review of draft-ietf-v6ops-conditional-ras
Requested rev. no specific revision (document currently at 05)
Type Last Call Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2018-05-21
Requested 2018-05-07
Other Reviews Rtgdir Last Call review of -04 by Ravi Singh (diff)
Opsdir Last Call review of -04 by Sheng Jiang (diff)
Tsvart Telechat review of -05 by Yoshifumi Nishida
Opsdir Telechat review of -05 by Sheng Jiang
Review State Completed
Reviewer Wassim Haddad
Review review-ietf-v6ops-conditional-ras-04-genart-lc-haddad-2018-05-25
Posted at https://mailarchive.ietf.org/arch/msg/gen-art/K2S3crj3Es-UGbYrloKq-A-IRhU
Reviewed rev. 04 (document currently at 05)
Review result Ready
Draft last updated 2018-05-25
Review completed: 2018-05-25

Review
review-ietf-v6ops-conditional-ras-04-genart-lc-haddad-2018-05-25

I am the assigned Gen-ART reviewer for this draft. The General Area Review Team (Gen-ART) reviews all IETF documents being processed by the IESG for the IETF Chair. Please treat these comments just like any other last call comments.

For more information, please see the FAQ at: https://trac.ietf.org/trac/gen/wiki/GenArtfaq


Document: draft-ietf-v6ops-conditional-ras-04
Reviewer:  Wassim Haddad
Review Date: 21 May 2018
IETF LC End Date: 21 May 2018 
IESG Telechat Date: Unknown

Summary:  This draft is ready for publication as Informational RFC 

- Major Issues: None

- Minor Issues: None


Regards,

Wassim H.