Concluded WG ADSL MIB (adslmib)
Note: The data for concluded WGs is occasionally incorrect.
WG | Name | ADSL MIB | |
---|---|---|---|
Acronym | adslmib | ||
Area | Operations and Management Area (ops) | ||
State | Concluded | ||
Charter | charter-ietf-adslmib-07 Approved | ||
Document dependencies | |||
Personnel | Chair | Menachem Dodge | |
Area Director | Benoît Claise | ||
Editors |
Edward Beili Moti Morgenstern Scott Baillie Umberto Bonollo |
||
Liaison Contact | Menachem Dodge | ||
Mailing list | Address | adslmib@ietf.org | |
To subscribe | https://www.ietf.org/mailman/listinfo/adslmib | ||
Archive | https://mailarchive.ietf.org/arch/browse/adslmib |
Final Charter for Working Group
The working group will define:
-
A set of managed objects to handle the bonding of xDSL lines
according to the ITU-T Recommendations G.998.1 (ATM), G.998.2 (Ethernet)
and G.998.3 (TDIM). A common MIB module will be developed to handle the
common objects and three specific MIB modules will be developed to
handle the three separate layer-2 technologies. Use will be made of the
ifStack and ifInvStack Tables defined in RFC 2863 and RFC 2864
respectively. Use will also be made of the ifCapStack and ifInvCapStack
tables as defined in RFC 5066. The Broadband forum TR-159 will be used
in the definition of these MIBs. -
The working group will develop a set of managed objects as an
optional extension to RFC 5650 that shall provide an alternative
approach, known as the "Vector of Profiles", for the configuration of
DSL lines. The Vector of Profiles MIB will be based on the Broadband
Forum TR-165 document. The ITU-T G.997.1 will also be considered in the
definition of this extension.
The MIB modules defined by this group will be generated using SMIv2,
will be consistent with the SNMP management framework, and will
describe the relationship of the objects defined to existing MIBs such
as those described in other work products of this Working Group, the
interfaces MIB, the Ethernet MIB modules and the AToM MIB.
Milestones
Date | Milestone | Associated documents |
---|---|---|
Dec 2013 | Submit the Vector Of Profile document to the IESG as Proposed Standard. | |
Dec 2013 | Re-charter or close down. | |
Nov 2013 | Working Group Last Call for the Vector of Profiles draft. | |
Oct 2013 | Submit Vector of Profiles Draft version 04. | |
Jul 2013 | Post Vector of Profiles Draft version 03. | |
Apr 2013 | Revise the draft and post vector of Profiles draft version 02. | |
Jan 2013 | Submit Vector of Profiles Draft version 01 | |
Oct 2012 | Initial Vector of Profiles draft to be accepted by the Working Group. |
Done milestones
Date | Milestone | Associated documents |
---|---|---|
Done | Submit G.Bond documents to IESG as Proposed Standard | |
Done | Working Group Last Call on all the G. Bond documents. | |
Done | Submit G.Bond MIB and TDIM MIB Drafts | |
Done | Submit updated ATM and Ethernet G.Bond MIB drafts. | |
Done | Present the Vdsl2 document to the IESG. | |
Done | Working Group Last Call for the Vdsl2 document following corrections. | |
Done | Make Correction to the draft following the review. | |
Done | Early MIB Doctor Reviews of the Vdsl2 draft. | |
Done | Working Group Last Call for the Vdsl2 document. | |
Done | Complete Thorough Working Group Reviews of the Vdsl2 draft and produce version 05. | |
Done | Post Vdsl2 draft version 04. | |
Done | Post Vdsl2 draft version 03 | |
Done | Post Initial Drafts of all the xDsl Bonding MIB drafts | |
Done | Integrate working group changes and produce revised VDSL2 MIB draft | |
Done | Inform the ITU-T and DSL Forum that work on the VDSL2 MIB has begun | |
Done | Initial WG Internet-Draft covering VDSL2 management objects | |
Done | Re-charter or close down | |
Done | Submit ADSL2 MIB to IESG for consideration as Proposed Standard | |
Done | Complete WG last call on ADSL2 MIB | |
Done | Integrate working group changes and produce revised draft | |
Done | Initial WG Internet-Draft covering ADSL2 management objects | |
Done | New WG I-Ds for the LCS MCM and SCM MIB modules | |
Done | Submit VDSL MIB to IESG for consideration as Proposed Standard | |
Done | Submit final VDSL MIB Internet-Draft | |
Done | Submit updated VDSL MIB Internet-Draft | |
Done | Complete WG last call on VDSL MIB | |
Done | Submit initial Internet-Draft VDSL MIB | |
Done | Submit HDSL2/SHDSL MIB to IESG for consideration as Proposed Standard | |
Done | Collect implementation reports for ADSL MIB | |
Done | Complete WG last call for HDSL2/SHDSL management objects | |
Done | Submit updated HDSL2/SHDSL Internet-Draft | |
Done | Submit supplementary Internet-Draft to IESG for consideration as Proposed Standard. | |
Done | Produce Internet-Draft covering HDSL2 management objects. | |
Done | Meet at Oslo IETF to review new Internet-Drafts and discuss implementation experience on initial MIB | |
Done | Submit Internet-Draft to IESG for consideration as Proposed Standard. | |
Done | Meet at Chicago IETF to review Internet-Drafts | |
Done | Submit Internet-Draft to cover subscriber equipment |